Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

P-Line Water Bottle Automation: HMI Touch Screen Controller and Installation

Active
75N98026Q00599Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves furnishing, delivering, installing, configuring, and testing a Human Machine Interface (HMI) touchscreen controller for an existing Tecniplast P-Line water bottle automation machine used in the Building 35/35A vivarium clean side cagewash area at the NIH. The installation of this second controller on the clean side aims to improve operational efficiency by allowing cagewash staff to monitor and control the machine without having to access the dirty side, where the original controller is located. This upgrade is designed to reduce downtime, minimize wasted staff time and personal protective equipment (PPE), and optimize the machine’s return on investment. The contractor is required to provide a Tecniplast-compatible HMI touchscreen controller along with all manufacturer-approved components, including mounting hardware, cabling, connectors, software, firmware, and licenses necessary for a complete and fully operational setup. Installation must be done at a government-approved location and comply with safety, security, and operational protocols so that it does not interfere with existing equipment functions or safety systems. The work is scheduled to occur over a 3.5-month period, estimated from July 1, 2026, to October 15, 2026, and must be coordinated to minimize disruption to facility operations. Freight and delivery costs are included in the contractor’s quoted price, and installation requires professional routing of all wiring and secure mounting to ensure safe and efficient use by staff.

General Info

Supply, install, and test HMI touchscreen controller for NIH cagewash machine, enhancing monitoring efficiency.

Agency

Department Of Health And Human Services → National Institutes Of Health Olao

NAICS

334516 - Analytical Laboratory Instrument Manufacturing View NAICS

Place of Performance

Bethesda, MD, 20892, USA

Set-Aside

SBA

Documents

(1)

Requirement+rev5.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhasePresolicitation
Posted

Presolicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Health And Human Services → National Institutes Of Health Olao
Contacts1 person available
OfficeBETHESDA, MD, 20892, USA
Organization / Agency
Department Of Health And Human Services → National Institutes Of Health Olao
Office AddressBETHESDA, MD, 20892, USA
Contacts

Full Description

Show more

Requirements:



AHCS uses a Tecniplast P-Line water bottle automation machine to process the bulk water bottles required to provide the rodents with clean and bacteria-free water. Installed in 2024, AHCS has recognized some difficulties manipulating the water bottle recapper and refiller from the clean side of cagewash, since the main controller is located on the dirty side. Installing this second controller on the clean side of cagewash will allow for efficient management and troubleshooting of the device, minimizing downtime, wasted staff time and PPE, and maximizing return on investment of the machine.


Period of performance shall be 3.5 months from date of award. This is currently estimated to occur from July 1, 2026, through October 15, 2026.


Specific Requirements:


The Contractor shall furnish, deliver, install, configure, test, and make fully operational, one (1) Human Machine Interface (HMI) touchscreen controller for the existing Tecniplast P-Line water bottle automation machine located in the Building 35/35A vivarium clean side cagewash area.


The clean-side HMI shall be compatible with the existing Tecniplast P-Line system and shall replicate the operational functions available from the existing dirty-side HMI controller except where safety or operational logic requires a difference in functionality. The clean-side HMI shall allow cagewash staff to monitor, control, manage, and troubleshoot the P-Line bottle automation machine from the clean side of the cagewash operation without requiring routine movement to the dirty side solely to access the existing controller.


At a minimum, the Contractor shall perform the following work:


Equipment and Materials


· Provide and install one (1) Tecniplast-compatible clean-side HMI touchscreen controller for the existing P-Line unit, identified in the vendor quotation as P-Line Clean Side Touch Screen, P/N U000003552.


· Provide all required manufacturer-approved components, mounting hardware, cabling, connectors, interface modules, software, firmware, licenses, and ancillary materials necessary for complete installation and operation.


· Ensure all furnished components are new, manufacturer-approved, and compatible with the existing P-Line machine configuration.


Delivery and Site Coordination


· Deliver or have delivered the HMI controller and associated installation materials to the NIH Main Campus, Building 35/35A vivarium cagewash area.


· Coordinate installation scheduling with the COR or designee to minimize disruption to cagewash operations and animal facility support activities.


· Perform work only during Government-approved dates and times and in accordance with facility access, safety, and biosecurity requirements.


· Freight and delivery fees shall be included in the Contractor’s quoted price and shall not be separately reimbursed.


Install the clean-side HMI touchscreen at a government-approved location attached to the P-Line bottle automation machine.


· Mount the HMI securely in a location that supports safe operator access, visibility, and routine use without obstructing cagewash operations, equipment access, traffic flow, emergency access, or maintenance clearances.


· Route, secure, and protect all wiring, cabling, and connections in a neat and professional manner.


· Connect the clean-side HMI to the existing P-Line control system so that it communicates properly with the machine and performs the intended control and monitoring functions.


· Ensure the installation does not degrade, disable, bypass, or otherwise adversely affect the existing dirty-side HMI controller or any existing safety, alarm, interlock, or emergency-stop functions.



Similar Contracts

NAICS: 334516
New
Federal
Nitrogen and Dry-Air Generator for LC-MS ApplicationsThe Naval Medical Research Command (NMRC) is seeking quotes for a firm fixed-price contract to procure one LNI Swissgas NGA CASTORE XL 40.40 Membrane Nitrogen Generator to support laboratory analytical testing at Naval Medical Research Unit Dayton. This equipment is essential for delivering a continuous, high-purity nitrogen gas stream required by Liquid Chromatography-Mass Spectrometry (LC-MS) instruments. The generator must meet specific technical criteria, including a minimum nitrogen output of 40 L/min at up to 99.9% purity, dry-air output of 40 L/min, and pressures suitable for either 220–240 VAC or universal 115–240 VAC configurations. It must operate quietly (≤50 dB), have a compact footprint, and feature integrated controls with remote monitoring capabilities. The system includes an oil-less compressor and must be fully self-contained without the need for facility compressed air. The procurement follows an unrestricted Request for Quote (RFQ) under NAICS code 334516, open to all responsible vendors registered in the System for Award Management (SAM) with a Cage Code and Unique Entity Identification Number. The contract will be awarded based on the Lowest Price Technically Acceptable offer. The generator includes a 15-month limited warranty valid in the contiguous US and Canada, provided by the manufacturer. The place of performance is Wright Patterson Air Force Base, Ohio, and responses are due by June 20, 2026. Points of contact for this procurement include representatives from the Naval Medical Research Center and the Air Force.
Naval Medical Research Center

POSTED

about 19 hours ago

DEADLINE

in 8 days
View Details
NAICS: 334516
New
Federal
Aerosol Robotic Network (AERONET) ProjectNASA's Goddard Space Flight Center seeks to acquire several models of the CIMEL CE318-T family of Sun-Sky-Lunar Spectral Photometers, along with essential parts for repair, maintenance, and upgrades of photometers, tracking robots, and advanced control boxes. These instruments are critical for monitoring aerosol optical properties and support NASA's global climate change and satellite validation initiatives. The acquisition will take place under a sole-source, Firm Fixed Price, Indefinite Delivery/Indefinite Quantity (IDIQ) contract with CIMEL ELECTRONIQUE, the sole provider capable of meeting the AERONET program's specific requirements. The contract will span five years, reflecting the unique status of these photometers as the standardized instrumentation in the Aerosol Robotic Network, which has been operational for over three decades. The procurement adheres to FAR Part 12 for the acquisition of commercial products or services, justified under 10 U.S.C 3204(a)(1) due to the absence of alternative sources capable of meeting NASA's technical and scheduling needs. While this is a sources-sought notice, responses from interested parties will only influence whether NASA proceeds with a competitive acquisition. The solicitation is managed by NASA Goddard’s Contracting Specialist, with capabilities and qualifications due by June 23, 2026. This effort supports NASA's commitment to maintaining a consistent, long-term aerosol data set, critical for climate research and satellite validation, with no viable substitute vendors available.
NASA Goddard Space Flight Center

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details
NAICS: 334516
New
Federal
Long-Read RNA Sequencing Kits for CARD iNDI Brain Sample StudyThe National Institutes of Health, specifically the National Institute on Aging (NIA), has issued a Notice of Intent to Sole Source for the procurement of brand-name Oxford Nanopore long-read RNA sequencing consumables. This acquisition supports the Center for Alzheimer’s Disease and Related Dementias’ (CARD) induced Pluripotent Stem Cell Neurodegenerative Disease Initiative (iNDI). The government plans to award a firm-fixed-price purchase order exclusively to Oxford Nanopore Technologies, Inc. for specific consumables including 171 PromethION Flow Cells and 114 units of the cDNA-PCR Sequencing Kit. These supplies are essential for conducting large-scale RNA sequencing on 600 postmortem human brain samples to advance research on Alzheimer’s, Parkinson’s, and brain aging by analyzing gene expression and isoform diversity. The consumables must meet stringent performance criteria: flow cells need to generate data with modal accuracy above 99% and be fully compatible with government-owned Oxford Nanopore PromethION 48 sequencers, while the sequencing kits must require minimal RNA input and accommodate six reactions each. Due to the proprietary nature of the Oxford Nanopore platform, compatible items from other manufacturers are not acceptable. The acquisition authority is based on regulations permitting a sole source award when only one responsible source exists, under 41 U.S.C. 3304(a)(1) and FAR 6.302-1. Interested parties other than Oxford Nanopore may submit capability statements proving their ability to meet all specified requirements by June 23, 2026. Submissions must demonstrate equivalency or authorized distribution and clear compatibility with the existing sequencing equipment. The government will review responses to decide whether to proceed with sole sourcing or consider competitive procurement, retaining full discretion in this decision.
National Institutes Of Health Olao

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details