Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Veterans Affairs was posted on December 17, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

P100--Atlanta Office Furniture Removal and Disposal - Decommissioning

Awarded
36C25926Q0118Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561210
New
SLED
Full Service Building Maintenance
Solicitation # P-10000582
Baltimore County is soliciting proposals for a comprehensive, full-service building maintenance program to support a diverse portfolio of public facilities, including police and fire stations, libraries, senior centers, and administrative offices. The scope of work encompasses preventative maintenance, routine and emergency repairs, system monitoring, and overall facility operations support to ensure these essential government functions remain safe and operational. Key deliverables include maintaining an asset inventory within a CMMS, conducting site inspections at least twice a month, and correcting notified deficiencies within 24 hours. Contractors must adhere to OSHA, ADA, and local building, fire, and safety codes, and personnel must hold the necessary State of Maryland trade certifications. The solicitation, P-10000582, is managed by the Property Management agency in Towson, Maryland, with a response deadline of January 29, 2027. Award decisions will be based on a combination of scored technical and price responses rather than price alone. Requirements include the provision of performance and payment bonds equal to the contract amount, compliance with Prevailing Wage and Local Hire laws, and adherence to strict cybersecurity and confidentiality protocols. Proposals must be submitted electronically and include a technical volume with an executive summary, organizational structure, and staff resumes, alongside a detailed price proposal. There is no specific set-aside status designated for this solicitation.
Property Management

POSTED

about 14 hours ago

DEADLINE

in 2 months
NAICS: 561210
New
SLED
Stationary Engineering Services
Solicitation # 2026-10
The Transbay Joint Powers Authority (TJPA) has issued Invitation for Bids (IFB) No. 2026-10 for Stationary Engineering Services to maintain the Salesforce Transit Center, Salesforce Park, and adjoining infrastructure. The objective is to ensure the facility remains in a state of good repair consistent with world-class public venues. The scope of work includes the operation, testing, and maintenance of critical building systems such as HVAC, plumbing, electrical, structural, physical security, and signage, as well as the management of mechanical plants including boilers and heat pumps. The contractor is responsible for providing all necessary supervision, labor, materials, and equipment to support a LEED Gold Certified building. The contract is intended for a five-year term with no options to extend, and the award will be granted to the lowest responsive and responsible bidder who meets all minimum qualifications. These qualifications include five years of experience in commercial stationary engineering services of similar scope within the last ten years, specifically within Northern California, and demonstrated operational capacity. Bids must be submitted in PDF format via the OpenGov portal by December 4, 2026, at 2:00 pm PT. Administrative requirements include electronic invoicing submitted to the TJPA Chief Financial Officer and payment terms within thirty calendar days. The contract is subject to USDOT requirements, including the Davis-Bacon and Copeland Anti-Kickback Acts, and requires both performance and payment bonds for 100 percent of the agreement price. Labor is subject to special prevailing wage determinations for stationary and utility engineers. There is no set-aside status for this solicitation.
Procurement

POSTED

about 15 hours ago

DEADLINE

in 17 days
NAICS: 561210
New
Federal
Area of Interest (AoI) 021 - Advanced Facilities, Roads, and Grounds Management and Maintenance Services, National Museum of the United States Army, Fort Belvoir, VA (CSO W912CH25SC001)
Solicitation # W912CH25SC001-AoI021
The Army Contracting Command - Detroit Arsenal (ACC-DTA) is seeking commercial solutions to provide advanced, outcome-based Operations and Maintenance (O&M) for the National Museum of the United States Army (NMUSA) located at Fort Belvoir, Virginia. This Small Business Set Aside - Total effort aims to transition the 84-acre campus from reactive maintenance to an agile, technology-driven framework. The scope includes the 185,000 sq. ft. museum, special event spaces, a mechanical yard, maintenance building, guard booth, a 5-acre parade ground, and a 468-vehicle capacity parking lot. Key objectives include optimizing building systems reliability, maintaining strict micro-climate preservation tolerances for artifacts, implementing predictive failure prevention, and automating grounds maintenance, including winter snow and ice removal. The contract is structured as a Firm-Fixed-Price (FFP) agreement with an estimated period of performance of sixty months, spanning from March 2027 through March 2032, consisting of a 12-month base period and four 12-month option periods, with a potential six-month extension. Proposals will be evaluated based on technical approach, performance schedule, and price. Key personnel must be eligible for a Common Access Card (CAC) via a Tier 1 federal background investigation and complete Anti-Terrorism Level I training. Interested parties must submit a two-volume proposal consisting of a Technical Volume and a Price Volume, and must be registered in the System for Award Management (SAM) with a Unique Entity ID (UEI).
W6QK Acc- Dta

POSTED

about 22 hours ago

DEADLINE

in 13 days
NAICS: 561210
New
Federal
B304 Drive Fan Replacement
Solicitation # FA460027Q0009
Solicitation FA460027Q0009 is a Request for Quotation for commercial services to replace the fan drive and gearbox for Cooling Tower #3 at Offutt Air Force Base, Nebraska. The contractor is required to procure and provide a like-for-like fan drive that is compatible with the existing fan and a new motor being installed under a separate contract. The scope of work includes removing the tower fan guard and blade, replacing the fan drive and associated coupling components, replacing water-logged wiring and conduit, performing alignment, and conducting start-up testing to ensure the unit is fully operational. All work must adhere to National Electrical Code, ISO 9001 quality management standards, and current State, AFI, ETL, NFPA, and Unified Facility Criteria Standards. The project includes a minimum one-year warranty on all labor and materials, and the contractor is responsible for disposing of all waste off-base. This procurement is a Total Small Business Set Aside under NAICS 561210. The period of performance is scheduled from December 21, 2026, to March 22, 2027. Offers must be submitted electronically by December 14, 2026, at 10:00 AM CST, and must include a technical plan not exceeding 10 pages and completed pricing. Evaluation will be based on Total Evaluated Price and a technical rating of either technically acceptable or not technically acceptable. The contract is subject to Service Contract Labor Standards and requires the use of the Wide Area WorkFlow system for invoicing and payment.
FA4600 55 Cons Pkp

POSTED

about 22 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract involves the comprehensive removal, disposal, and cleaning of office furniture and fixtures at the VHA Health Eligibility Center in Atlanta, GA, as part of a facility decommissioning effort scheduled from January 26 to February 6, 2026. It is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 561210, with a firm-fixed-price structure. The scope includes the safe disconnection and removal of all furniture, wall-mounted items, cubicle systems, electrical and data cabling, and wall art, while ensuring the protection of existing facility surfaces. The contractor is responsible for proper disposal or destruction of government property, with recycling encouraged but not mandated, and must adhere to VAAR 852.219-75 limitations on subcontracting, certifying compliance as part of their submission. Key logistical details emphasize the necessity of coordinating access, managing dumpster placement, and working within designated hours primarily during weekdays, with some flexibility for extended or after-hours work. The contractor must develop a detailed project plan outlining daily tasks and timelines, and coordinate with VA personnel, including a designated onsite Project Manager, to ensure minimal disruption and adherence to safety and damage prevention standards. The procurement process includes a mandatory site visit on December 16, 2025, with a proposal submission deadline of December 19, 2025, and emphasizes strict compliance with all documentation, including inventory lists, specifications, and timelines. The contract's inspection and acceptance will occur at the performance site, with the VA overseeing quality and compliance, and no specific FAR or DFARS clauses are explicitly listed in the provided documentation.

General Info

Contract Value

$49,254.92

NAICS

561210 - Facilities Support Services

Place of Performance

VHA Health Eligibility Center, Atlanta, GA, 30329, USA

Set-Aside

SDVOSBC

Award Issued Date

Potential End Date

February 8, 2026

Documents

5
DOCX, High priority: read this first12 pages · rfq
High
DOCX, High priority: read this first2 pages · rfq
High
PDF, High priority: read this first2 pages · certificate-of-compliance
High
XLSX, Low priority29 pages · list-of-items
Low
DOCX

Read all 5 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Full Service Building MaintenanceOpen now, due in 67 days
  • CMED Facility and Physical InfrastructureOpen now, due in 43 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
Contacts1 person available
OfficeGreenwood Village, CO, 80111, USA
Office AddressGreenwood Village, CO, 80111, USA

Full Description

Show more
Amendment Important Reminders and Q&A
The deadline for quote packages remains 12pm MST/2pm EST on Friday, December 19th, 2025. All quote packages must be received by the deadline. Vendors are STRONGLY encouraged to read the full original solicitation regarding the required information and documentation that must be included in their quote package. Failure to provide ALL information requested may result in a vendor not being considered for further review and/or award.
Due to this requirement being set-aside for SDVOSB specifically, Limitations on Subcontracting does apply. Vendors will need to read and complete VAAR 852.219-75 regarding their ability to meet subcontracting limitations as part of the mandatory documents for their quote package.
The following questions were asked prior to the deadline for questions. Interested vendors are strongly encouraged to review all questions. A follow up email may be sent to Sign up to see this detail for clarification if the questions below are not satisfactorily answered.
Do the cabinets that are bolted to the wall get removed?
Yes
If the Cabinets are required to be removed, who is responsible for patching and painting?
The contractor is responsible for the safe removal of all wall-mounted items without incurring any additional damages to the existing wall surfaces. The contractor is not responsible for the repair of damages incurred because of mounting hardware used during installation. The contractor is responsible to repair, at contractor expense, any damages incurred because of contractor related removal efforts.  
Does the wall art get removed?
Yes
Do appliances get removed?
No
The raised flooring in the mail room, does this get removed?
No
Can we use both first floor front and back exits to remove furniture?
Yes, both doors can be used. Note, it is the contractor s responsibility to ensure that the main entrance flooring is not damaged in any way. Any damage as a result of contractor action with be at the contractor s expense to repair or replace.   
Do we have full access to the parking area for our containers?
The contractor provided dumpsters can be placed along the front parking lot (west side of the building). The same parking lot continues to wrap around the building to the southwest and this space is provided for dumpster parking if needed.
What is the process if the elevator or elevators go down?
Contractor will need to use the fire stairwells.
Is this a Certified Payroll project using Davis-Bacon Act?
This project is not categorized as a construction project. Therefore, we do not anticipate Davis-Bacon Act would apply. The Government does not anticipate requiring the prime vendor to submit any certified payroll information. However, Limitations on Subcontracting (LOS) does apply to this requirement since it is set-aside for SDVOSBs. Vendors must review the LOS document very carefully and complete it to include in their quote package.
Is it acceptable for proposals to submit a single consolidated proposal with four (4) sections corresponding to the quote requirements and Evaluation Factors? 
Yes, vendors are welcome to submit all information in the format they feel is best. However, vendors must ensure all requested information and documentation is easy to identify when the Government is reviewing.
Can you please clarify the timeline requirements regarding Volume 1 and IV referencing a Project Service Timeline ?
Each vendor must provide an overview of their plan to complete the work on the project that must occur within 1/26 2/6/2026. The information can be broken down into what work is planned to be accomplished each day of the project. We understand things may change after award during post-award discussions but we do need some form of documentation that the vendor has a tentative plan in place to successfully complete this project within the allotted time.
Can you clarify how technical capability and quality of services offered will be evaluated?  Will there be a rating assigned to Factor 1?
No ratings will be assigned. However, vendors are encouraged to provide as much information as possible to support their claim that they are capable of meeting the project deadlines and all requirements included. Vendors might provide information on their plans for the disposal (how big the dumpster is, how often it will be emptied, etc.) as well as how many employees will be onsite each day, and other logistics that should be planned by the vendor in order for them to be able to generate an accurate quote for this project.
Can you please confirm that all furniture must be disposed of through recycle and transfer stations. No resale, recycling, or donations allowed?
All government property must be destroyed and disposed of properly. The contractor is prohibited from reselling, donating, or utilizing government property without the expressed, written, consent of the Contracting Officer Representative (COR) prior to any such action.
Destruction means destroying an item in a manner in such a way that the item can no longer be utilized for its original, intended, purpose. Recycling: Recycling is not a requirement. It is the contractor decision if recycling is in their best interests.
Can you please confirm that all built-in cabinetries must be removed unless there is a sink?
Yes. This is correct.
We anticipate that the government would benefit from extending contractor work hours Monday through Friday and possibly adding Saturdays as a working day. Is this within the acceptable capability for government representative(s) accommodation and oversight?
Vendors should plan to work within the hours and days indicated in the solicitation. However, some flexibility might be available depending on numerous factors. This can be addressed with the awardee during the post-award discussions.
Would you please confirm that all building occupants will have vacated the building and removed all property not specified in the PWS? In other words, will the contractor have exclusive use of all areas of the building necessary to perform the removal and disposal tasks?
Only the VA POC and contractor provided personnel should be in the facility during the period of performance for this action. However, the Government cannot guarantee 100% vacancy as there are numerous departments working on transferring over to the new facility. Since this is a permanent transfer to a new facility, any items leftover once this project starts is likely to need to be removed and disposed of by the vendor. However, a VA POC will be onsite at the facility during the project, if there are any IT-related items found, the VA POC should be notified immediately since the VA will be removing them.
Can you please clarify the deadline? Is the reference to MST correct?
Yes, the deadline is 12pm MST or 2pm EST on Friday, December 19th, 2025.
How many people are allowed onsite at one time?
Contractor shall provide, operate, manage, and maintain sufficient personnel based on workload to accomplish all assigned tasks for this requirement. The Contractor shall ensure that contractor provided employees have the technical capability to disassemble, carry, remove, and dispose of all types of furniture.  Total number of employees needed to perform the work is a contractor determination.
During yesterday s walk-through with Lindsey Peace, we were unable to view the basement or its equipment. Since these areas were not included in the Combined Synopsis/Solicitation, their condition remains unknown to us. Aside from the items listed in the provided Atlanta Excel sheet, we lack visibility on the basement assets. Is it possible to schedule a return trip to view the basement?
Unfortunately, this project needs to be completed on 2/6/2026 and there are several steps still needed in order to get this awarded. As a result, we are unable to offer another site visit. Vendors should reference the information provided and generate their quote to the best of their ability based on the information they have.
Are cubicle systems required to be fully disassembled, or may they be removed in sections?
There are no specifications on this the vendor may determine the best method with the final result being the furniture is completely removed from the facility. The vendor remains responsible to safely disconnect all electric whips prior to disassembly.
Are there any items excluded from removal (e.g., IT equipment, wall-mounted fixtures, safes)?
This project should be the last step for final, official move-out of the facility. Therefore, there should not be anything other than the furniture in the building that needed to be removed. The station POC will let the vendor know during the project if anything still needs to be removed such as IT equipment which would be removed by the VA s IT team.
Will furniture be grouped/staged prior to removal, or is removal required from individual offices?
There will be no staging or grouping of furniture. The vendor will be responsible for going through each floor and each office/area to ensure the furniture is removed and disposed of.
Are there specific disposal or recycling requirements (e.g., metal recycling, landfill restrictions)?
Recycling is encouraged but not required. Recycling of the metals is to the vendor s benefit, but recycling is not mandatory.
Is documentation of disposal/recycling required with the invoice?
No. Vendors may choose to recycle but the Government will not require documentation. Proof will be the absence of the furniture from the site. The station POC will be able to observe this work being done.
Are there restrictions on disposal facilities (VA-approved or local only)?
No restrictions that we are aware of. Vendors should use their best judgement to complete this project responsibly. 
Is removal of fasteners, anchors, floor plates, or adhesive residue required?
Anything associated with the furniture such as fasteners and anchors should be removed along with the furniture itself. The goal is to leave facility as empty as possible for the owner of the building to be able to easily prepare the space for the next tenant.
Are there height, weight, or equipment restrictions for elevators or hallways? Height of the door openings were provided in the solicitation Weight: 1200 pounds max Equipment restrictions: Nothing should be loaded that would cause damage to the elevator. Hallways should be prepped to allow safe movement of furniture and equipment without damage to the area. PWS 5.0- Risk Control and Safety Measures outlines the requirements for protecting the facility-specifically the main entrance flooring.
Will the Government provide access badges, or must the contractor escort all personnel?
A VA employee will be onsite for each day of the project and would be the escort for all personnel onsite.
Are there parking restrictions for box trucks or dumpsters?
The employees at this location would have moved to the new facility already. As a result, there should be no issues with parking during this project.
Are background checks or PIV credentials required for contractor personnel?
There is no patient, staff, or other information located on site. Therefore, security checks are encouraged by the Contractor but will not be inspected by the Government. A Project Manager (PM) shall be onsite for the duration of each day for the project and shall be responsible for their team s conduct and progress.
If so, what is the lead time to obtain approvals?
N/a
Are there any restricted areas that require advance coordination?
None. The building has been emptied of employees and sensitive information. The PM should communicate with the VA POC to ensure the area they will be working in is fully opened.
Is the completion date of Feb 6, 2026 firm, or is there any flexibility? Will the Government allow phased completion by floor or area?
Per the solicitation all work MUST be completed no later than 2/6/2026. The Contractor may finish the project earlier but shall not exceed 2/6.
The Government has not specified the order the work must be done in. The vendor should provide an estimated timeline overview as part of their quote package but one way is not preferred over another.
Will VA staff be available to unlock rooms and supervise access during removal?
Per the solicitation VA POC will be onsite each day of the project to facilitate access to the building although the PM will be responsible for overall project supervision.
What constitutes facility damage versus normal wear?
Facility damage is significant and/or noticeable damage/alteration due to negligence, carelessness, misuse, or avoidable accidents (large holes, deep stains, broken fixtures, etc.). Both the VA POC and the Contractor are each encouraged to take pictures of the areas prior to starting work in order to provide documentation at a later date if needed.
Is the contractor responsible for minor wall or floor repairs caused by removal?
Unavoidable damage must be communicated to the VA POC in advance and should receive confirmation to proceed before starting the work that would cause the minor damage/alteration.
Are there specific insurance limits required beyond standard VA contracting requirements?
No specifications on insurance. The Contractor shall be responsible for repairing any damage caused that was not approved by the VA POC. The Contractor shall plan and prepare to pay for the entire cost of the unapproved damage/alteration.
Where exactly would you want trucks to stage/park, and are there any curb/traffic restrictions?
Contractor parking and staging will be allowed in the front and east side of the facility
What dumpster types/sizes are allowed on-site and where can dumpsters be placed?
Sizes are at the contractor s discretion. Dumpsters will also be allowed in the front and eastern side of the facility.
Is there any recycling requirements (metal, e-waste, shredding, etc.) or city/VA disposal restrictions we must follow?
Recycling requirements: Recycling is not required but encouraged. Disposal restrictions: Use of local, approved, landfills is requested.
What is the inspection/acceptance process by floor/zone, and what constitutes complete (e.g., vacuuming, debris removal, adhesive residue)?
Acceptance will occur when conditions stated in the contract are met. Acceptance is based on all furnishings, trash, debris are removed and all carpeted areas vacuumed. All hard surface flooring has been swept as well.
If there is damage, what is the reporting/repair process and timeline expectation?
The contractor onsite PM and the Contracting Officer Representative (COR) will be working closely throughout the project to ensure damages do not occur. If damage do occur because of contractor actions, the contractor PM will notify the COR immediately regarding the damages and the contractor s plan for repairs. All repairs must be complete before the government pays the final contractor invoice.    Would the only personnel in the building be the Contract team and the VA Rep?
Currently, only the Contracting Officer Representative (COR) and contractor personnel are expected to be in the facility at time of execution.
Are stairs able to be used in addition to the Elevators?
Yes
Are there rooms/offices that we would NOT be clearing out? And if so, would we be able to get final guidance/clarification on Day 1 before starting?
All offices will be cleared of all furnishings. The Contracting Officer Representative (COR) will be onsite throughout to respond to any questions that arise during the effort.  
How do we need to remove the wires from the cubicles, tables, etc.? Are we able to cut them or do we need to remove them from the cubicles intact so they can be reused? Would they like them professionally capped?
The cubicle whips, or power cords, are generally hard wired into wall mounted electrical boxes. For removal, the whips will be removed by disconnecting the cords from the wall boxes and then replacing the covers on the electrical boxes. Once disconnected, the power whips will be disposed of along with the rest of the items in this requirement. Same applies to all data connections as well.
Would they like the blue recycling bins in the break rooms to be removed?
Yes
To confirm, the hours of operation are 8am-7pm and no one will be onsite during this time so we can move items out of the space during the day, correct?
Per the Performance Work Statement, section 2.1: Work will be scheduled primarily during normal business hours (6:30 am to 5:00 pm EST) Monday through Friday. All contractor requests for extended working hours will be considered on a case-by-case basis.   
During the period of performance, only the Contracting Officer Representative (COR) and contractor provided personnel are projected to be on site during the execution of this effort.
Can we drop dumpsters in the parking lot, or is there a dedicated space for them?
The contractor provided dumpsters can be placed along the front parking lot (west side of the building). The same parking lot continues to wrap around the building to the southwest and this space is provided for dumpster parking if needed.  
How in depth would they like the building cleaned? It mentions a sweep, but I would like more clarification there.
As stated in the Performance Work Statement, section 4.1: Contractor cleaning, vacuuming, removal of all trash, residue, furniture waste and any other debris remaining in the vacant areas. This means vacuuming all carpeted areas, sweeping all hard surface, and removal and disposal of all trash, residue, debris, and furniture waste materials.  
During the site visit, whiteboards were observed on the first floor that appear to be mounted or built into the walls. Please confirm whether these whiteboards are within the scope of removal. Additionally, please advise if there are any items requiring removal that are not currently reflected on the Excel inventory spreadsheet.  
Yes, all wall mounted white boards throughout the facility are to be removed and discarded without incurring any additional damages to the walls themselves. All wall art throughout the facility is to be removed in the same manner as well. The contractor is not required to patch, fill or repair wall openings incurred during the wall board / art installation.
Other items not currently reflected in the provided inventory spreadsheet: We don t know of any items not listed in the spread sheet, but it should be noted that we will continue to make the facilities contents available to other federal, state, and local agencies who wish to reuse these items prior to the start date of this action. This will result in a reduction in the total number of items requiring removal by the contractor.       Please clarify what documentation will be required to verify proper disposal or recycling (e.g., landfill receipts, weight tickets, recycling certificates, photographs, or affidavits).
There are no such requirements listed.
Are there any items that require destruction rather than standard disposal or recycling?
All government property must be destroyed and disposed of properly. The contractor is prohibited from reselling, donating, or utilizing government property without the expressed, written, consent of the VA POC prior to any such action.
Destruction means destroying an item in a manner in such a way that the item can no longer be utilized for its original, intended, purpose.
Recycling: Recycling is not a requirement. It is the contractor decision if recycling is in their best interests.
How do we need to remove the wires from the cubicles, tables, etc.? Are we able to cut them or do we need to remove them from the cubicles intact so they can be reused? Would they like them professionally capped?
The cubicle whips, or power cords, are generally hard wired into wall mounted electrical boxes. For removal, the whips will be removed by disconnecting the cords from the wall boxes and then replacing the covers on the electrical boxes. Once disconnected, the power whips will be disposed of along with the rest of the items in this requirement. Same applies to all data connections as well.
Would they like the blue recycling bins in the break rooms to be removed?
Yes
To confirm, the hours of operation are 8am-7pm and no one will be onsite during this time so we can move items out of the space during the day, correct?
Work will be scheduled primarily during normal business hours (0700-1800 EST) Monday through Friday. All contractor requests for extended working hours will be considered on a case-by-case basis.
Can we drop dumpsters in the parking lot, or is there a dedicated space for them?
The contractor provided dumpsters can be placed along the front parking lot (west side of the building). The same parking lot continues to wrap around the building to the southwest and this space is provided for dumpster parking if needed.  
How in depth would they like the building cleaned? It mentions a sweep, but I would like more clarification there.
Contractor cleaning, vacuuming, removal of all trash, residue, furniture waste and any other debris remaining in the vacant areas. This means vacuuming all carpeted areas, sweeping all hard surface, and removal and disposal of all trash, residue, debris, and furniture waste materials. 
Will any cabinetry that does not have a sink be thrown out?
All government property must be destroyed and disposed of properly. The contractor is prohibited from reselling, donating, or utilizing government property without the expressed, written, consent of the Contracting Officer Representative (COR) prior to any such action.
Destruction means destroying an item in a manner in such a way that the item can no longer be utilized for its original, intended, purpose.
For the cubicles, do we disconnect from the main power source or disassemble each individual power source from each cubicle? There are a lot of cubicles so we are just seeking clarification.
The cubicle whips, or power cords, are generally hard wired into wall mounted electrical boxes. For removal, the whips will be removed by disconnecting the cords from the wall boxes and then replacing the covers on the electrical boxes. Once disconnected, the power whips will be disposed of along with the rest of the items in this requirement. Same applies to all data connections as well
Can we give the chairs and desks away? We don't want to sell them just give them away.
All government property must be destroyed and disposed of properly. The contractor is prohibited from reselling, donating, or utilizing government property without the expressed, written, consent of the VA POC prior to any such action.
Destruction means destroying an item in a manner in such a way that the item can no longer be utilized for its original, intended, purpose.
Will the floors be vacated during the 2 weeks of removal?
Only the VA POC and contractor provided personnel will be in the facility during the period of performance for this action.  
Are there any fire-resistant cabinets in place?
None that we are aware of. If a fire-resistant cabinet is discovered during the period of performance, the cabinet will be handled the same manner as any other furnishing in the facility.
Please confirm if cubicle whips are to be disconnected from furniture and left in place, or will they need to be removed from the building connection?
The contractor is responsible for properly disconnecting and disposing of all electrical power cords, cubicle whips, and any other power cables that provide electrical power to all furnishings will be removed.
Is after-hours or weekend work allowed if needed?
Work will be scheduled primarily during normal business hours (0700-1800 EST) Monday through Friday. All contractor requests for extended working hours will be considered on a case-by-case basis.
Will the building be occupied during performance?
Only the VA POC and contractor provided personnel will be in the facility during the period of performance for this action.
What are the badge, escort, and daily check-in requirements?
None, The VA POC will be onsite daily to allow access. The contractor is responsible for maintaining accountability of their personnel.
Where are the approved truck staging and parking areas (no loading dock)?
The contractor provided dumpsters can be placed along the front parking lot (west side of the building). The same parking lot continues to wrap around the building to the southwest and this space is provided for dumpster parking if needed.  
Who is responsible for wall-mounted item removal and wall repairs?
The contractor is responsible for the safe removal of all wall-mounted items without incurring any additional damages to the existing wall surfaces. The contractor is not responsible for the repair of damages incurred because of mounting hardware used during installation. The contractor is responsible to repair, at contractor expense, any damages incurred because of contractor related removal efforts.  
After cabinet removal, is the contractor responsible for drywall, painting, or floor repairs, or will the Government handle this?
The contractor is not responsible for the repair of damages incurred because of mounting hardware used during installation. The contractor is responsible to repair, at contractor expense, any damages incurred because of contractor related removal efforts.  
Does the mailroom flooring need to be removed?               No Are electronics/cabling included in the scope?
I m not sure of any other electronics cabling that is referred, but per the performance Work statement The contractor is responsible for properly disconnecting and disposing of all electrical power cords, cubicle whips, data cabling, and any other power cables that provide electrical power to all furnishings will be removed.              Will file cabinets be emptied prior to removal?
Yes
Are any safes or unusually heavy items included?
Safes: No
Unusually heavy items: All items are already listed in the provided furnishing spreadsheet.
What is the distance to loading areas for hauling?
The contractor provided dumpsters can be placed along the front parking lot (west side of the building). The same parking lot continues to wrap around the building to the southwest and this space is provided for dumpster parking if needed.  
Please confirm dumpster locations, size limits, and swap schedule.
The contractor provided dumpsters can be placed along the front parking lot (west side of the building). The same parking lot continues to wrap around the building to the southwest and this space is provided for dumpster parking if needed.  
Size limits: None.
Swap schedule: Contractor discretion
Can the Government confirm no hazardous materials remain?
There are no hazardous materials in the facility. If any hazardous materials are found during the execution of this effort, the contractor is not responsible for the proper removal and disposal of such materials.
What disposal documentation is required?
There are no such requirements listed in the Performance Work Statement.
What are the daily cleaning requirements?
There are no daily cleaning requirements listed in the Performance Work Statement.
As stated in the Performance Work Statement, Contractor cleaning, vacuuming, removal of all trash, residue, furniture waste and any other debris remaining in the vacant areas. This means vacuuming all carpeted areas, sweeping all hard surface, and removal and disposal of all trash, residue, debris, and furniture waste materials. 
This requirement is due at time of effort completion.             How should pre-existing damage be documented?
As stated in the solicitation, it is recommended that the contractor take photos of the facility to verify existing facility damages.

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

NAICS: 236220
New
Federal
Z2DA--666-27-102 Lightning Protection Update B71N
Solicitation # 36C25926Q0880_1
The Department of Veterans Affairs is seeking a qualified contractor to perform lightning protection system upgrades for Building 71N at the Sheridan VA Medical Center in Wyoming. The project involves repairing detached air terminals and installing new terminals at screen walls and HVAC equipment to ensure compliance with NFPA 780 and UL 96A standards. Key requirements include the installation of Transient Voltage Surge Suppression devices and the establishment of an equipotential ground by interconnecting electrical, communication, piping, and structural steel systems. The project must be completed within 120 calendar days from the Notice to Proceed, and the contractor is responsible for all labor, materials, and equipment, including the provision of a negative pressure environment for infection control. This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside contract under NAICS code 236220. Award will be based on best value, considering price and other factors such as past performance in hospital environments, OSHA/EPA violation history, and an Experience Modification Rate of 1.0 or less. Contractors must adhere to strict safety and security protocols, including the use of OSHA-30 certified supervisors on-site and compliance with the FMS Safety Plan to protect patients from self-harm. Final acceptance requires manufacturer and contractor certifications, as well as approval by a UL representative and the issuance of a Master Label Certificate.
Commercial and Institutional Building Construction

POSTED

about 22 hours ago

DEADLINE

in 21 days
View Details
NAICS: 238220
New
Federal
Radiant Heating Panel Replacement
Solicitation # 36C25927Q0048
Solicitation 36C25927Q0048 is a request for a firm-fixed-price contract to replace approximately 238 feet of corroded hydronic radiant heating panels at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The project covers the Colfax, South, and North entrances, as well as the employee breezeway. The contractor is responsible for providing all labor, materials, and equipment to remove existing panels and install new units rated for a working pressure of 74 PSIG, featuring 1/2 inch and 1/8 inch female tapered NPT connections. Work must be performed Monday through Friday, 7:30am to 4:00pm, with any operational disruptions coordinated in advance. This procurement is a Small Business Set Aside - Total. Quotes must be submitted via email to [email hidden] by 12:00pm MT on November 26, 2026, and must be organized into four volumes: Technical Capability, Price, Past Performance, and the VA Notice of Limitations on Subcontracting. Evaluation will be based on a comparative process considering technical quality, price, and past performance, with the government reserving the right to select a proposal other than the lowest price if it provides additional benefits. Payments are made in arrears through Tungsten upon satisfactory completion of services and receipt of a properly formatted invoice.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 22 hours ago

DEADLINE

in 3 days
View Details
NAICS: 541380
New
Federal
Q301--Request For Information (RFI)-Reference Lab Testing for Fort Harrison VA Medical Center (Fort Harrison, MT)
Solicitation # 36C25927Q0051
The Department of Veterans Affairs, Network Contracting Office 19, is conducting market research to identify vendors capable of providing Cost Per Test (CPT) reference laboratory testing for the Fort Harrison VA Medical Center in Helena, Montana. The requirement encompasses the testing of all venous and arterial blood samples, as well as urine samples, as ordered by VA clinicians. Services must be available 24/7, Monday through Sunday, with the contractor operating within the city limits of Helena to ensure same-day results for urgent and life-threatening tests. The contractor must be approved to provide clinical diagnostic laboratory tests under Medicare and Medicaid regulations, as well as all applicable federal and state laws. The anticipated period of performance is from July 1, 2027, to June 30, 2032. This Request for Information is for planning purposes only and does not constitute a formal solicitation. Interested vendors are requested to submit a capabilities statement and a completed market research questionnaire, not exceeding eight pages, by 10:00 AM MST on December 11, 2026. The government is utilizing NAICS code 541380 for Testing Laboratories and Services, which has a business size standard of $19 million. There is currently no specified set-aside status for this requirement.
Testing Laboratories and Services

POSTED

4 days ago

DEADLINE

in 17 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS