This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Pad-Mounted Transformer
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
A 750 kVA, three-phase, pad-mounted, dead-front transformer with a primary voltage of 13.2 kV and a secondary voltage of 208Y/120 V is required, operating at 60 Hz with ONAN cooling and mineral oil insulation. The unit must adhere to strict physical dimensions: height between 63 and 64 inches, width of 65 inches, and a depth approximating 41 inches, with final dimensions subject to manufacturer submission and government approval via shop drawings. The transformer housing must be constructed of 304 stainless steel with welded, sealed, and pressure-tested tank construction, featuring ANSI 61 Grey coloring to match existing enclosures. Equipment must include pentahead security hardware, a 1-inch oil drain valve on the primary side with a 3/8-inch water sampler, arc-flash labeling, lifting lugs, jacking pads, and a certified nameplate per ANSI C57.12.00. Electrical specifications require six 200 A loadbreak bushings for three low-voltage and three 10 kV arresters, NEMA spade secondary terminals with ten holes including three line and one neutral, standard ANSI impedance, and a five-position no-load tap changer with two 2.5% taps. Protection systems must include bayonet fuses with isolation links, current-limiting fuses, a minimum two-position load break switch, nitrogen pressure gauge with test port and blanket, temperature and pressure vacuum gauges, liquid level indicator, and a Schrader valve—all visibly mounted. Compliance is mandatory with ANSI/IEEE C57.12 series, DOE 2016 efficiency standards, NESC, NEC/NFPA 70, UFGS 26 12 19, the American Buy Act, and PCB-free oil certification; the unit must be UL Listed. Factory test reports covering insulation resistance, winding resistance, turns ratio, polarity, no-load and load losses, dielectric, excitation, impedance, applied and induced potential, leak, and oil quality tests must be provided alongside certified as-built drawings, installation and operations manuals, and warranty documentation with a minimum one-year manufacturer warranty covering equipment defects. The transformer must be fully assembled and delivered ready for installation to Fort Buchanan, Puerto Rico, with a packing slip containing the contract number, purchase order, and serial number, within 40 weeks from contract award.
General Info
Agency
NAICS
Place of Performance
Fort Buchanan, Puerto Rico, NY, 00934Set-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Department Of Defense → W6QM Micc-Ft Drum
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
