Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Painting and Coating Application

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → County of Marin, Department of Public WorksView Agency

NAICS

238320 - Painting and Wall Covering ContractorsView NAICS

Place of Performance

Woodacre, CA, 94973, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260715053.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Woodacre Staff Restroom Improvements

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → County of Marin, Department of Public Works
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → County of Marin, Department of Public Works
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Application of mold-inhibiting, moisture-resistant paint to walls, ceilings, and trim after surface preparation and priming.

Similar Contracts

Same NAICS industry code

NAICS: 238320
New
BHJC Interior Painting Project in Dormitory on Floors F & M
Solicitation # bhjc-interior-painting-project-dormitory-floors-f-m
The Dr. Benjamin L. Hooks Job Corps Center is soliciting bids for a subcontracting opportunity to perform interior painting for the dormitory on Floors F and M. The scope of work includes the preparation and painting of 72 rooms, 8 hallways, and 6 restroom and shower areas, encompassing student rooms, common areas, lounges, offices, door frames, and trim. The contractor is responsible for providing all labor, supervision, materials, equipment, and tools necessary to achieve a professional, uniform finish using premium commercial-grade coatings. Work must be performed between 7:50 a.m. and 3:50 p.m., Monday through Friday, and must comply with all applicable OSHA safety regulations. To be considered responsive, bidders must submit their current UEI number, SAM.gov certification, business license, and a W9. Required bid documentation includes a total project cost broken down by materials and labor for each floor, an estimated project duration, the number of assigned personnel, proof of insurance, and a proposed project schedule with start and completion dates. Final acceptance is contingent upon a joint inspection and the signing of a punch list to ensure all rooms are clean and ready for immediate student occupancy. This opportunity is set aside for Small Businesses, Women-Owned Small Businesses, and Veteran-Owned Small Businesses, with bids closing on August 14, 2026, at 12:00 p.m. Central.
DR. BENJAMIN L. HOOKS JOB CORPS CENTER

POSTED

about 3 hours ago

DEADLINE

in about 22 hours
View Details

More opportunities from California → County of Marin, Department of Public Works

Same awarding agency

NAICS: 236220
SLED
Woodacre Staff Restroom Improvements
Solicitation # 20260715053
The project involves a comprehensive interior renovation of the second-floor men’s restroom at the Woodacre Fire Station in California, with scope covering demolition of existing finishes, plumbing fixtures, lighting, toilet partitions, and accessories, followed by replacement-in-kind of plumbing and lighting systems, installation of new finishes, millwork, and toilet accessories. The work includes mandatory accessibility upgrades to both the interior and exterior Paths of Travel leading to the restroom, as well as hazardous material abatement for asbestos and lead in accordance with regulatory requirements. The project is governed by a fixed-price contract under a Lowest Price Technically Acceptable (LPTA) procurement model, where award will be made to the lowest-priced responsible bidder whose proposal fully complies with all technical, safety, and regulatory requirements. The work must be completed within 50 working days from the commencement date, defined as all calendar days except Saturdays, Sundays, and legal holidays. All materials must be delivered in original protective packaging, properly sealed, and labeled with manufacturer information, product name, stock number, color, and reduction instructions, with no barcoding required. Materials must be stored in compliance with manufacturer recommendations for temperature and humidity, and all work must adhere to applicable codes including CAL/OSHA, California Building Code, NFPA 70, ANSI, ASTM, UL, and ADA standards, with the most restrictive requirement prevailing in case of conflict. Inspection and acceptance occur on-site, with the contractor responsible for facilitating testing by independent agencies and repairing any damage, while formal acceptance is solely granted by the County’s Engineer. Subcontractors must be disclosed prior to award and certified as not debarred or suspended, and all changes require written Change Orders; unauthorized work is non-compensable. Liquidated damages of $1,100 per day apply for delays not excused by written notice submitted within five working days. The County requires indemnification from the contractor for all claims arising from the work, mandates compliance with anti-discrimination and anti-collusion provisions, and enforces strict insurance requirements where deductibles or self-insured retentions must be disclosed and approved, potentially requiring bonding. No specific contract value is provided as pricing fields remain blank, and no electronic invoicing systems, accounting codes, or COR/COTR contacts are identified. Proposals must be submitted as a single sealed physical copy using the official form, with no electronic, telegraphic, or telephone submissions permitted.
Commercial and Institutional Building Construction

POSTED

28 days ago

DEADLINE

in 5 days
View Details