This Solicitation opportunity from California was posted on November 2, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Palm Desert Student Services Project (CMAR)

Closed
SBCMP0000061361State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
26ITB0921226K-CRB Abatement & Demolition Services for Fulton County Jail Project
Solicitation # 26ITB0921226K-CRB
Fulton County, Georgia, is soliciting bids for solicitation number 26ITB0921226K-CRB to provide abatement and demolition services for the Fulton County Jail project. The scope of work involves the demolition of three specific locations: the Fulton County Accountability Court, Jefferson Place Transition Housing, and the Bellwood Annex. The project covers approximately 32.86 acres, with 3.30 acres of disturbed area, and requires the removal of buildings, foundations, utilities, and pavement. A critical component of the contract is the identification, abatement, and lawful disposal of hazardous materials, including asbestos-containing materials and lead-based coatings, in compliance with NESHAP, OSHA, and GA EPD regulations. The final objective is to create a proposed green space for a future facility, which includes grading and restoring disturbed areas with topsoil and grass seed. The contract will be awarded to the lowest responsive and responsible bidder based on an evaluation of price, technical experience, and financial capacity. Bidders must attend a mandatory guided site visit on November 10, 2026, and submit their sealed bids by November 20, 2026. Required submissions include a bid bond for five percent of the bid amount, as well as various certifications and disclosure forms. The successful contractor must provide performance and payment bonds for 100 percent of the bid and utilize the B2GNow software for payment reporting. Work is to commence within ten days of a notice to proceed, which may be issued within 120 days of contract execution. All work is subject to inspection by the Construction Manager to determine substantial and final completion.
Fulton County Purchasing Department

POSTED

about 10 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The California State University, San Bernardino, is seeking qualified construction management firms through a Request for Qualifications to oversee the design and construction of a new Student Services Building at the Palm Desert campus, utilizing a Construction Manager at Risk (CMAR) delivery method. This approach involves a preconstruction phase where the selected firm collaborates with the architect to refine design, assess constructability, and develop a Guaranteed Maximum Price (GMP). Upon approval of the GMP, the construction phase will commence under a separate contract. The project encompasses approximately 36,500 gross square feet of new construction, including a standalone student services building featuring advising, career, library, health, and recreational facilities, along with site improvements, utility extensions, parking, landscaping, and renovation of existing spaces. The project is planned to be executed in two phases, with the first phase focusing on the new building and associated site infrastructure, including parking for approximately 248 vehicles, pedestrian pathways, outdoor recreation areas, and a campus clock tower. The project also emphasizes sustainable design, requiring a fully engineered solar panel system compliant with California building codes. The solicitation was posted in November 2022, with responses due by January 2023, and interested firms can contact Dusty Rushia at CSUSB for further information.

General Info

Agency

California State University, San Bernardino

Place of Performance

CA, USA

Set-Aside

NONE

Documents

5

CSU Contract General Conditions - CMAR with GMP

PDF, High priority: read this firstcontract-document
High

CSUSB Palm Desert Campus Student Services Project - Exhibit A

PDF, High priority: read this firstsow
High

SBCMP0000061361 - Palm Desert Student Services Project RFQ

PDF, High priority: read this firstrfq
High

SBCMP0000061361 - Palm Desert Student Services Project RFQ

PDF, High priority: read this firstrfq
High

SBCMP0000061361 - Supplementary General Conditions (Palm Desert Student Services Project)

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia State University, San Bernardino
Contacts1 person available
OfficeN/A
Organization / Agency
California State University, San Bernardino
Office AddressN/A

Full Description

Show more
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICEPalm Desert Student Services ProjectProject Number: SBCMP0000061361California State University, San Bernardino5500 University Parkway, San Bernardino, CA 924071. INTRODUCTIONThe Trustees of The California State University (Trustees) are requesting Statements of Qualifications (SOQ) from interested and qualified construction managers (Respondents) to provide construction management services with a guaranteed maximum price for the design and construction of the Project referenced above (Project). The delivery method for this Project is commonly known as “Construction Manager at Risk” (CMAR). CMAR consists of a preconstruction phase and a construction phase with separate contracts for each phase. During the preconstruction phase, the CM will collaborate with the Architect on the design, constructability, cost and schedule of the Project and develop a Guaranteed Maximum Price (GMP) proposal to construct the Project. Upon the Trustees’ acceptance of the GMP the Trustees will issue a contract to the CM for the construction phase. If the Trustees and the CM do not agree upon a GMP, the Trustees will not award the construction phase of the Project to the CM.2. PROJECT DESCRIPTIONCalifornia State University, San Bernardino has two campus locations, one located in San Bernardino, and one located in Palm Desert. The project is located at the Palm Desert campus; consists of approximately 36,500 GSF new standalone building, site improvements, utility extensions, parking lot, landscape improvements and the renovation of vacated existing spaces on campus (backfill) and shall be constructed in two phases, as summarized below. Student Services Building #10 (Phase 1): Approximately 23,700 ASF/36,500 GSF, (square footage to be confirmed during program validation process) Student Services Building (#10) at the CSUSB Palm Desert Campus on a vacant site located east of the existing campus core. This new student-focused facility is currently programed to include an advising/tutor center, career center, library, group study rooms, cross-cultural/affinity centers, a campus bookstore, food services, student health center, a recreation and wellness center, University Police office(s), and multi-purpose rooms/classrooms to serve students and the community. Included in the building are storage and loading dock space required for campus operational needs. Project shall include infrastructure to service this facility as well as sitework and utilities infrastructure essential to the future development of the Palm Desert Campus. An estimated 248 new parking stalls will be constructed to serve the project, final count of new parking spaces shall be confirmed during the design phase. Base design shall be fully engineered design solar panel system, and shall meet current California building code, solar panels procurement method to be determined during the design phase.Site Improvements-Landscape/Utilities (Phase 1): With a distance of approximately 500 feet between the project site and the existing campus core, significant sitework is required to provide a visual and physical connection between the two locations. Pedestrian circulation with adjacent shade structures and outdoor recreation areas are required. The current vehicular circulation will be re-designed to ensure pedestrian safety, emergency, service and public vehicle access. An open space adjacent to the building shall be designed for student and community events. A campus clock tower will be included in the area adjacent to the new building. Utility extensions/connections vary and are approximately 500-1,200 linear feet from the new building site.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS