Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Panel Repair at Mile Marker 208.85

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Water Resources San Joaquin Field Division is initiating a maintenance project to repair a leak in the California aqueduct at mile marker 208.85, located in Lost Hills, Kern County. The scope of work involves using a boom truck to lift and realign a misaligned concrete panel, while a hydro vacuum truck and backhoe are utilized to remove and haul away debris. Hand tools will be used as needed to complete the repair, after which the panel will be reset into its proper position. The project is estimated to take up to one week to complete and will be performed entirely within the DWR right-of-way. Classified under NAICS code 237990, this activity is designated as a statutory exemption from environmental review because it consists of essential maintenance to support the State Water Project. The primary point of contact for this forecast is Elizabeth Maldonado, Senior Environmental Scientist.

General Info

Repair misaligned concrete panel at California Aqueduct Mile Marker 208.85 using boom and hydro vacuum trucks, completion in one week.

Agency

California Water Resources, Department of

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Elizabeth MaldonadoSenior Environmental Scientist (Specialist)

Full Description

Show more
San Joaquin Field Division plans to fix a leak within the California aqueduct. To do this work, a boom truck will be used to lift a concrete panel that is misaligned. While the panel is lifted, a hydro vacuum truck will be used to remove debris. A backhoe may be used to assist with lifting and with hauling away material. Hand tools would be used where needed. Once the debris is removed, the panel will be set back into place. Work is estimated to take up to a week to complete. All work will take place within the DWR right-of-way. This work is necessary to maintain the aqueduct.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO
Solicitation # W51DQV26RA002
Solicitation W51DQV26RA002 is a full and open competition for a firm-fixed-price design-bid-build construction contract for the Rio de la Plata Flood Control Project, Supplemental Contract 1, located in Dorado and Toa Baja, Puerto Rico. Managed by the U.S. Army Corps of Engineers under NAICS code 237990, the project has an estimated magnitude between 250 million and 350 million dollars. The scope of work involves extensive river channel widening and modifications across approximately 1.6 miles, the construction of 3.1 miles of earthen levees, and the installation of four concrete culverts with pre-cast pipes and composite flap gates. Additional requirements include the relocation of water, sewer, and electrical utilities, scour protection, demolition of abandoned structures, and wetland mitigation. The estimated period of performance is 1619 calendar days following the receipt of the Notice to Proceed, though offerors are cautioned that all real estate rights for site access have not yet been obtained and will be secured prior to the full notice. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal. Awardees are required to provide payment and performance bonds equal to the total bid price within 10 days of award, and firms other than small businesses must submit a subcontracting plan per FAR Part 19. The project also requires the delivery of an operations and maintenance manual detailing procedures for restoring levee geometry after seismic events.
W2SR Endist Caribbean(provis)

POSTED

about 13 hours ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS