Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Paregien Basin Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Exeter Irrigation District

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Farmersville, CA

Set-Aside

NONE

Documents

(6)

EID Paregien Basin Project Notice of Intent

PDFnotice-of-intent

Paregien Basin Project Environmental Impact Summary

PDFenvironmental-summary

Comment Letter on Initial Study and Mitigated Negative Declaration for Paregien Basin Project

PDFcomment

CDFW Comment on Paregien Basin Project MND 2025120957

PDFcomment

Paregien Basin Project Notice of Completion

PDFnotice-of-completion

EID Paregien Basin Draft Initial Study/Mitigated Negative Declaration December 2025

PDFismnd

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Exeter Irrigation District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Exeter Irrigation District
Office AddressN/A
Contacts
Gene KilgoreGeneral Manager
Briza Grace SholarsPrincipal Planner, Environmental Project Manager

Interested Companies (1)

Show more
Provost & Pritchard Consulting Group
Clovis, CA

Full Description

Show more
The District plans to develop an approximately 50-acre recharge facility known as the Paregien Basin located directly south of Highway 198, northeast of the City of Farmersville. The new groundwater basin would include a new turnout connection from Deep Creek. The Project would also include approximately 350 feet of pipeline connecting the new turnout to the proposed basin. The pipeline connection from the proposed recharge basin to Deep Creek will be located on the south side of the existing West Pond, which is not a part of the Project. The area to the north and east of the existing pond will be avoided as it has been identified as a potentially sensitive habitat area. No Project activities will occur in this area. The proposed turnout would be developed with a capacity for approximately 20 cubic feet per second (CFS). The proposed turnout facility would consist of cast-in-place concrete structure, control gate(s), trash rack, and related appurtenances from the west bank of Deep Creek to divert to the proposed basin. The turnout structure would connect to an inlet pipeline approximately 350 linear feet (LF) from Deep Creek into the proposed Paregien Basin. The turnout structure would have a maximum excavation depth of 15 feet below ground surface for establishing proper compaction under the structure and pipeline. All excavation material would be balanced on site. Construction would include equipment mobilization, excavation of earthwork for the recharge basin and construction of basin perimeter berms. The Project site would contain temporary staging areas for construction equipment and material storage during the construction effort. Basin construction would include performance testing (i.e. compaction testing) and demobilization. Excavation material would be used on site for berm construction along the perimeter of the basin. New berm construction would not exceed six feet in height, measured from the exterior toe to the top of new berm. The maximum depth of ground disturbance for the basin would be as much as nine (9) feet. Through the improvements of this proposed multi-cell recharge basin, it is anticipated to recharge approximately 1,260 acre-feet (AF) on an average annual basis. However, the site is capable of recharging more in wet years when surplus water is available for longer durations. The 1,260 AF estimate is derived based on an estimated recharge rate of 0.5 AF per acre across the approximately 50 acres of wetted area for an estimated duration of 50 days, which is an approximate average of historical water availability on the Kaweah system. Typical surplus surface water availability is generally between March and June. However, in very wet years, water could be diverted for recharge whenever excess supply is available, which could occur from January to September or October.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Environmental & Archaeological AssessmentThe contract encompasses a comprehensive environmental and archaeological assessment to support permitting under the National Environmental Policy Act and Section 106 of the National Historic Preservation Act. It requires the performance of a Phase I Environmental Site Assessment to identify potential contamination, a wetland delineation to determine the extent and boundaries of wetland areas, and archaeological surveys to evaluate the presence of culturally significant resources. These activities are essential for documenting environmental and historical conditions prior to any proposed development or infrastructure projects in Dawson County, Georgia. The work must be conducted in accordance with federal regulatory standards to ensure compliance and facilitate the permitting process. This is a subcontract opportunity posted by the Development Authority of Dawson County, with a response deadline of September 7, 2026. The North American Industry Classification System code 541620 indicates the work falls under environmental consulting services. The performance location is within Georgia, though specific site details are not provided. Interested parties must submit proposals by the stated deadline to be considered, and all activities are intended to support regulatory compliance and due diligence for future development initiatives in the region.
Development Authority of Dawson County

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Environmental Compliance and MonitoringThe contract involves comprehensive environmental compliance and monitoring services focused on stormwater management, erosion control oversight, and regulatory reporting throughout the construction phase. The work is tied to a project under the Haralson County School District in Georgia and requires adherence to established environmental regulations, ensuring that construction activities do not negatively impact surrounding ecosystems or water resources. The contractor will be responsible for implementing and maintaining effective erosion and sediment control measures, conducting regular site inspections, documenting compliance efforts, and submitting required reports to regulatory authorities as needed. This subcontract is categorized under NAICS code 541620, which corresponds to environmental consulting services, indicating a professional scope centered on technical environmental management rather than physical construction. The solicitation was posted on August 7, 2026, with a response deadline set for September 9, 2026, providing interested parties a limited window to submit proposals. Performance is expected to occur in Georgia under the jurisdiction of the Haralson County School District, though specific site locations are not detailed in the provided data. The contract emphasizes continuous regulatory alignment and accurate documentation, making it critical that the selected vendor has demonstrated expertise in environmental monitoring and compliance reporting within construction environments.
Haralson County School District

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
PACP and MACP Pipeline Condition AssessmentThis contract requires the standardized coding and reporting of pipeline and manhole defects in accordance with NASSCO’s Pipeline Assessment Certification Program (PACP) and Manhole Assessment Certification Program (MACP) protocols. All condition assessments must follow these industry-recognized guidelines to ensure accurate, consistent, and defensible data collection for infrastructure evaluation and maintenance planning. The work is part of a larger infrastructure project under SAK Construction, LLC, and performance is expected to adhere to strict quality control measures aligned with national best practices for utility asset management. The solicitation is designated as a subcontract under the Small Business Administration’s set-aside programs, with eligibility limited to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, Alaskan Native Corporations, Indian Tribes, and Disadvantaged Business Enterprises certified under the Department of Transportation’s DBE program. The NAICS code 541620 categorizes this as an engineering services contract, confirming the technical nature of the condition assessment work. The response deadline is September 10, 2026, and the performance location is tied to the SARP10 Humphreys Blvd CIPP project in Memphis, Tennessee, though specific site details are not fully defined in the provided data.
SAK Construction, LLC

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Quality Assurance and Compliance Testing (Environmental/Chemical)The contract requires third-party testing and verification of brine salt to ensure full compliance with TxDOT CAT 8C-B specifications, focusing on critical parameters such as concentration, purity, and corrosion characteristics. This work is essential for confirming that the brine salt meets the stringent environmental and chemical standards mandated by the Texas Department of Transportation for use in transportation infrastructure applications. The testing must be conducted by qualified external laboratories with proven expertise in chemical analysis and environmental compliance to guarantee accurate, reproducible results aligned with state requirements. The solicitation is classified as a subcontract under NAICS code 541620, indicating it involves scientific and technical testing services. It is posted under the Texas SmartBuy portal with a response deadline of September 1, 2026, allowing potential bidders sufficient time to prepare detailed proposals demonstrating their technical capability, equipment certification, and experience with similar transportation-related materials testing. The place of performance and point of contact details are unspecified, but all work must align with Texas Department of Transportation's operational and regulatory expectations, ensuring the brine salt used in state projects remains safe, effective, and environmentally compliant.
Texas Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541620
New
SLED
Erosion Control and Stormwater ManagementThe contract pertains to erosion control and stormwater management activities required during and after construction projects under the jurisdiction of the Texas Department of Transportation. It encompasses the installation and maintenance of best management practices such as silt fences, sediment basins, inlet protection structures, and related measures designed to prevent sediment runoff and protect water quality. The work must be performed in accordance with state and federal environmental regulations to mitigate the impact of construction on surrounding ecosystems and waterways. All activities are to be completed within the designated project areas, with strict adherence to timelines and performance standards. The contract is classified as a subcontract and is open for bids with a response deadline of September 2, 2026. It falls under the NAICS code 541620, indicating it involves environmental consulting and related services. The solicitation was posted on August 7, 2026, and is accessible through the Texas SmartBuy portal. While specific performance locations and contact details are not provided, the work is expected to occur across various Texas transportation construction sites. Contractors must demonstrate experience in implementing erosion and sediment control systems and be prepared to provide documentation and inspections to verify compliance with established environmental protocols.
Texas Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 25 days
View Details