Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Paregien Basin Project

Forecast
2025120957State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Exeter Irrigation District

Place of Performance

Farmersville, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Exeter Irrigation District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Exeter Irrigation District
Office AddressN/A

Interested Companies (1)

Provost & Pritchard Consulting GroupClovis, CA

Full Description

Show more
The District plans to develop an approximately 50-acre recharge facility known as the Paregien Basin located directly south of Highway 198, northeast of the City of Farmersville. The new groundwater basin would include a new turnout connection from Deep Creek. The Project would also include approximately 350 feet of pipeline connecting the new turnout to the proposed basin. The pipeline connection from the proposed recharge basin to Deep Creek will be located on the south side of the existing West Pond, which is not a part of the Project. The area to the north and east of the existing pond will be avoided as it has been identified as a potentially sensitive habitat area. No Project activities will occur in this area. The proposed turnout would be developed with a capacity for approximately 20 cubic feet per second (CFS). The proposed turnout facility would consist of cast-in-place concrete structure, control gate(s), trash rack, and related appurtenances from the west bank of Deep Creek to divert to the proposed basin. The turnout structure would connect to an inlet pipeline approximately 350 linear feet (LF) from Deep Creek into the proposed Paregien Basin. The turnout structure would have a maximum excavation depth of 15 feet below ground surface for establishing proper compaction under the structure and pipeline. All excavation material would be balanced on site. Construction would include equipment mobilization, excavation of earthwork for the recharge basin and construction of basin perimeter berms. The Project site would contain temporary staging areas for construction equipment and material storage during the construction effort. Basin construction would include performance testing (i.e. compaction testing) and demobilization. Excavation material would be used on site for berm construction along the perimeter of the basin. New berm construction would not exceed six feet in height, measured from the exterior toe to the top of new berm. The maximum depth of ground disturbance for the basin would be as much as nine (9) feet. Through the improvements of this proposed multi-cell recharge basin, it is anticipated to recharge approximately 1,260 acre-feet (AF) on an average annual basis. However, the site is capable of recharging more in wet years when surplus water is available for longer durations. The 1,260 AF estimate is derived based on an estimated recharge rate of 0.5 AF per acre across the approximately 50 acres of wetted area for an estimated duration of 50 days, which is an approximate average of historical water availability on the Kaweah system. Typical surplus surface water availability is generally between March and June. However, in very wet years, water could be diverted for recharge whenever excess supply is available, which could occur from January to September or October.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 15 hours ago

DEADLINE

in 20 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS