Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Paregien Basin Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Exeter Irrigation District

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Farmersville, CA

Set-Aside

NONE

Documents

(6)

EID Paregien Basin Project Notice of Intent

PDFnotice-of-intent

Paregien Basin Project Environmental Impact Summary

PDFenvironmental-summary

Comment Letter on Initial Study and Mitigated Negative Declaration for Paregien Basin Project

PDFcomment

CDFW Comment on Paregien Basin Project MND 2025120957

PDFcomment

Paregien Basin Project Notice of Completion

PDFnotice-of-completion

EID Paregien Basin Draft Initial Study/Mitigated Negative Declaration December 2025

PDFismnd

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Exeter Irrigation District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Exeter Irrigation District
Office AddressN/A
Contacts
Gene KilgoreGeneral Manager
Briza Grace SholarsPrincipal Planner, Environmental Project Manager

Interested Companies (1)

Show more
Provost & Pritchard Consulting Group
Clovis, CA

Full Description

Show more
The District plans to develop an approximately 50-acre recharge facility known as the Paregien Basin located directly south of Highway 198, northeast of the City of Farmersville. The new groundwater basin would include a new turnout connection from Deep Creek. The Project would also include approximately 350 feet of pipeline connecting the new turnout to the proposed basin. The pipeline connection from the proposed recharge basin to Deep Creek will be located on the south side of the existing West Pond, which is not a part of the Project. The area to the north and east of the existing pond will be avoided as it has been identified as a potentially sensitive habitat area. No Project activities will occur in this area. The proposed turnout would be developed with a capacity for approximately 20 cubic feet per second (CFS). The proposed turnout facility would consist of cast-in-place concrete structure, control gate(s), trash rack, and related appurtenances from the west bank of Deep Creek to divert to the proposed basin. The turnout structure would connect to an inlet pipeline approximately 350 linear feet (LF) from Deep Creek into the proposed Paregien Basin. The turnout structure would have a maximum excavation depth of 15 feet below ground surface for establishing proper compaction under the structure and pipeline. All excavation material would be balanced on site. Construction would include equipment mobilization, excavation of earthwork for the recharge basin and construction of basin perimeter berms. The Project site would contain temporary staging areas for construction equipment and material storage during the construction effort. Basin construction would include performance testing (i.e. compaction testing) and demobilization. Excavation material would be used on site for berm construction along the perimeter of the basin. New berm construction would not exceed six feet in height, measured from the exterior toe to the top of new berm. The maximum depth of ground disturbance for the basin would be as much as nine (9) feet. Through the improvements of this proposed multi-cell recharge basin, it is anticipated to recharge approximately 1,260 acre-feet (AF) on an average annual basis. However, the site is capable of recharging more in wet years when surplus water is available for longer durations. The 1,260 AF estimate is derived based on an estimated recharge rate of 0.5 AF per acre across the approximately 50 acres of wetted area for an estimated duration of 50 days, which is an approximate average of historical water availability on the Kaweah system. Typical surplus surface water availability is generally between March and June. However, in very wet years, water could be diverted for recharge whenever excess supply is available, which could occur from January to September or October.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is soliciting interest from Public Water Supplies and municipalities with Water Management Act (WMA) permits or registrations to receive a free American Water Works Association (AWWA) M36 water audit. The program is designed to help entities identify water loss objectives, particularly those failing to meet the Unaccounted-for Water (UAW) performance standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible participants can receive either a Top-Down Audit or a Bottom-up Component Analysis. MassDEP will hire a private consulting firm through a separate public procurement process to conduct these audits. Selection is based on criteria including high UAW rates, WMA allocation status, recent improvement efforts, and permit status, with priority given to WMA permit holders and projects benefiting disadvantaged communities. Participation is limited to entities in compliance with the MBTA Communities Act Law. Selected applicants must provide a written commitment to have detailed system information for 2025 or 2026 available by January 15, 2027, and submit that data by February 2, 2027. Additionally, participants must commit significant personnel time as an in-kind match and be prepared to enter into a contract within 15 to 30 days of the grant award. Responses to this Request for Interest are due by October 21, 2026.
BWR00 - Bureau of Water Resources

POSTED

about 16 hours ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS