Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Texas was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Parking Lot Demolition and Debris Removal

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
RRUMC 4th Floor Patient Care Reconfiguration – BP 11 – Demolition, Concrete, Framing And Drywall
Solicitation # 907518.01
The Ronald Reagan UCLA Medical Center 4th Floor Patient Care Reconfiguration project, specifically Bid Package 11, focuses on the conversion of Behavioral Health spaces into Medical/Surgical spaces to expand inpatient bed capacity by up to 103 beds. The scope involves renovating approximately 67,400 square feet of the 115,600 square foot fourth floor, with work extending to the third and fifth floors, outdoor decks, and along Charles Young Drive. Key deliverables include complete selective demolition, concrete repair, metal stud framing, and the installation of level 4 drywall. Additionally, the contractor must provide design-build services for modifications to the existing pneumatic tube system and ensure all alterations meet ADA compliance, sustainability, safety, and security standards. The contract is a lump sum base bid awarded to the lowest responsive bidder, with the final sum calculated based on the base bid, unit prices, compensable delay rates, and any included alternates. Performance is subject to strict quality standards, including CBC/CFC and NFPA regulations, with final acceptance requiring a Letter of Completion from the University Representative after successful testing and submission of as-built diagrams. Bidders must be licensed California contractors and provide a UCIP Form 1-B regarding safety qualifications. The project requires adherence to prevailing wage laws, the provision of performance and payment bonds, and participation in a University Controlled Insurance Program. Bids are due by 2:00 p.m. on December 3, 2026.
The Regents of the University of California

POSTED

about 18 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This subcontract for the Texas A&M University System involves the physical demolition and debris removal of existing parking lot surfaces and substructures. The selected provider will be responsible for breaking and removing asphalt and concrete pavement, excavating sub-base materials, and loading all debris for disposal to deliver a completely cleared site. Operations require the use of specialized equipment, including loaders, sweepers, and excavators equipped with hydraulic hammers. The contractor must strictly adhere to all Texas state environmental regulations and safety standards while performing work for prime contractors. This opportunity is categorized under NAICS code 238910, with a response deadline of September 16, 2026.

General Info

Texas A&M subcontract for parking lot demolition and debris removal by September 16, 2026.

Agency

Texas A&M University System

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026-06932.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SSC - TAMUV Totah and PCI Building Demolition - Victoria, TX

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Vallejo Ferry Terminal Reconfiguration ProjectOpen now, due in 4 days
  • Grape ES - Outdoor Learning Environment - Cimarron ES - Outdoor Learning EnvironmentOpen now, due in 4 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas A&M University System
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas A&M University System
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs physical demolition of existing parking lot surfaces and substructures for prime contractors on Texas A&M University System projects. Breaks and removes asphalt and concrete pavement, excavates sub-base materials, and loads debris for disposal. Utilizes excavators with hydraulic hammers, loaders, and sweepers. Adheres to Texas state environmental regulations and safety standards. Delivers a cleared site with all materials removed.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS