Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on November 1, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Partnership Opportunity Document For NASA Goddard Space Flight Center Flight Systems for Discovery 14 Missions

Closed
NASA-GSFC-Partnership-Opportunity-Document-For-Flight-Systems-for-Discovery-14-MissionsFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336414
New
Federal
Commercial Low Earth Orbit (LEO) Destination Contract (CLDC) Request for Proposal
Solicitation # 80JSC027R0004
The National Aeronautics and Space Administration Johnson Space Center is soliciting proposals under solicitation 80JSC027R0004 for the Commercial Low Earth Orbit Destination Contract. This effort seeks a Multi-Award Indefinite Delivery/Indefinite Quantity contract, utilizing a Firm-Fixed-Price structure, for the design, development, manufacture, launch, and operation of a Commercial LEO Destination System to succeed the International Space Station. The system comprises three primary components: the Crew Transportation System, the Commercial LEO Destination, and the Cargo Transportation System. Performance is measured across three capability categories ranging from one-month crew tended missions to six-month standard service missions. The contract includes a base ordering period from April 2027 through April 2035, with two subsequent option periods extending the potential performance through April 2042. Proposals are due by December 8, 2026, at 1:00 p.m. Central Time, with Volume III regarding past performance requested early on November 24, 2026. Award decisions will be based on best value, evaluating Mission Suitability, Price, and Past Performance, with Mission Suitability being the most significant technical factor. The scope of work involves rigorous certification and safety standards, including compliance with AS9100 and specific human space flight requirements. Key contractual obligations include the submission of an Organizational Conflicts of Interest plan, adherence to the Outer Space Treaty, and the procurement of specific property damage insurance for certain launch vehicle categories. All submissions must be delivered electronically via NASA's EFISS Box in Microsoft Office formats.
NASA Johnson Space Center

POSTED

7 days ago

DEADLINE

in about 2 months

General Info

Agency

N/A

NAICS

336414 - Guided Missile and Space Vehicle Manufacturing

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Michael AdamsAerospace Engineer

Full Description

Show more
Partnership Opportunity Document (POD) For NASA's Goddard Space Flight Center (GSFC) Flight Systems for Discovery 14 Missions dated November 2017 1.0 Introduction and Scope NASA's GSFC is considering missions to Solar System targets for the upcoming Discovery 14 Announcement of Opportunity (AO). We are seeking partners for spacecraft, navigation, major subsystems and mission operations center for potential science mission proposals to this opportunity. The potential GSFC Discovery missions are designed to meet the science goals of the Discovery program (those outlined in the latest NRC Decadal Survey for Planetary Exploration). GSFC mission teams will be submitting proposals to the Discovery AO currently planned for release in CY 19. The AO will be a two-step process, with the first proposal response primarily focused on the scientific merit and technical feasibility of the proposed mission and its associated scientific investigation. The initial submissions will then be down-selected after formal peer review, and the resultant subset of proposals will be funded to perform Phase A mission concept studies. During Phase A, proposals will be expanded and refined to detail the entire end-to-end mission life cycle concept, with greater attention to engineering implementation, cost, and schedule. This partnership opportunity is issued to select partners to team with GSFC Discovery mission concept teams for Step 1 proposal submittal; to assist in the Phase A concept studies if the mission is down-selected; and to provide a flight-qualified system should the mission be selected for flight by NASA Headquarters. For the portion of this partnership opportunity dealing with the preparation of the Step 1 proposal, there will be no exchange of funds between the teaming partners. Funding may be available for Phase A and subsequent phases should the mission be competitively selected for those additional phases. NASA's GSFC reserves the option to not select any teaming partners under this POD offering on the basis of materials received. 2.0 Mission Overview The likely mission cost cap for the Discovery AO will be ~$450M (FY18), not including launch vehicle or Phase E, so cost is an important issue for the conceptual mission designs. Mission targets could include all planets and small bodies noted in the latest NRC Decadal Survey for Planetary Exploration. More detailed information will be provided to those responding with a Notice of Interest (NOI) to this POD. A Notice of Interest (intentionally not called a notice of intent) does not obligate an organization to provide a POD response. 3.0 Pre-selection Support 3.1 Step 1 Proposal Support SOW: It is expected that the selected respondent will provide support using their own resources to help develop and write the Mission concept proposal in response to the AO in the area of the spacecraft, related subsystems and mission implementation. This will involve meeting with the relevant scientists and the mission engineering team in order to: (1) help define the end-to-end performance requirements, including interfaces to the instruments or spacecraft, depending on the component being proposed; (2) define the flight system architecture; (3) identify study topics; and (4) predict performance and quantify risks. This will include cost estimation for all mission phases. The period of performance for this interval is expected to last until the submission of the initial proposal. 3.2 Phase A Study and Phase A Proposal Support SOW: If the mission is selected for a Phase A study, the proposal team will receive funding to conduct a Phase A study and submit a detailed Concept Study Report (CSR) to NASA. The respondent providing the spacecraft or navigation subsystem for the mission may be allocated a portion of this funding. The respondent will be expected to contribute to designing, documenting, and costing the spacecraft or navigation design, fabrication, integration and testing for inclusion in the final Discovery Concept Study Report (as specified in the AO). The period of performance for this interval is expected to last approximately 15 months after Phase A selection. 3.3 POD Response Instructions for Pre-Selection Support The respondent shall: 1) Demonstrate understanding and flight experience in the design, fabrication, integration and testing of the Planetary science mission spacecraft and flight subsystem: - Identify example target mission the response is intended for, - For each target mission, identify assumed mission and system requirements for the target mission and your team's response to addressing those requirements, - Highlight particularly critical or challenging areas for the design of the spacecraft or system, - Provide a technical summary/description of the proposed hardware including relevant heritage, - Describe what types of capabilities and cost benefits the spacecraft or subsystem provides for the intended target mission. 2) Provide any recommended potential study topics related to the spacecraft or navigation. 3) Identify the pertinent missions for which the respondent has provided support for proposal writing in the area of spacecraft design, fabrication, integration and testing: - Provide data on scope of the spacecraft design, the role played in the proposal process, and the portions of the proposal written or provided assistance in writing, and provide a customer reference POC. 4.0 Development Support SOW: At the end of Phase A another down-select occurs. If the mission is selected for development and launch, the respondent will be responsible for the design, development, and test of the spacecraft or navigation system. The respondent is responsible for: identifying the spacecraft or subsystem requirements and providing all aspects of the spacecraft or navigation system. The period of performance for this interval is expected to last approximately 46-64 months. The date will depend upon selection timelines and budget allocations. POD Response Instructions for Development Support The respondent shall: 1) Describe your team's experience in similar spacecraft applications. 2) Identify available design and modeling capabilities required to support development of the spacecraft. 3) Identify fabrication and testing facilities that will be required to support development and test of the spacecraft. 4) Identify missions successfully supported in this capacity. - Provide information on recent similar spacecraft designed and delivered, and how that experience is applicable to the mission. Basic information on scope of work, and how well the fielded spacecraft met the requirements (cost and technical, and how well they met the proposed schedules). 5) Provide a Rough Order of Magnitude (ROM) cost estimate and timeline for the scope of the design, fabrication, and testing of the spacecraft. This ROM will not be considered a binding commitment, but will serve as a consideration during the partnership evaluation. Due to the rigid cost cap for Discovery missions, the cost range for the spacecraft will be an important consideration. The respondent is invited to comment on the reasonableness of the placeholder cost. 5.0 General Instructions for POD Response For purposes of this partnership opportunity, the point of contact is Mike Adams michael.l.adams@nasa.gov, 301-286-2010. Potential respondents are asked to contact the GSFC Discovery team as soon as possible (within 5 working days) after release of this document with a Notice Of Interest (intentionally not called notice of intent). This contact does not create an obligation to respond to the POD, but allows GSFC Discovery teams to disseminate more details on the parameters of the missions being considered and provide answers to questions from potential partners. All Notice of Interest respondents will receive further details on the missions that will facilitate a focused response. These details will be proprietary and competition sensitive and not to be shared outside the teams' necessary to prepare a full response. All questions and answers will be sent to those who respond to the Notice of Interest, while the source of the questions shall be held confidential. Questions and answers that contain information unique to a respondent's proprietary approach will not be shared if they are identified as such. The parameters and question answers provided to all Notice of Interest responders are vital to focused responses. Notices of Interest shall be sent to the above noted contact via email with - Notice of Interest' in the subject line, a simple sentence or two expressing interest and specifying which mission (or target destination), and an email address to which to send further information. Responses to the Partnership Opportunity Document (POD) shall: 1) Be in a presentation format (.pdf viewgraphs) that shall not exceed 30 pages. The font size for the text shall be no smaller than 12 point. 2) Address all requirements noted in Sections 3.0, 4.0, and 6.0 of this document. Responses will be treated as proprietary information and controlled as such by GSFC. Final presentation packages must be received by 5 pm ET, November 17, 2017. Packages are to be delivered via email to the above noted contact 6.0 Selection Criteria for Awarding Partnership Opportunity Selection criteria will be consistent with the desire to encourage cost effective partnerships between the Government and Industry. The information requested in Section 3.3 & 4 will allow the evaluators to determine how well the respondents systems match and enable one or more of the potential Discovery missions. Experience in Discovery AO proposals and Discovery mission development phases are essential for selection. Selection Criteria Proposal/Pre-selection Support (30 points) - Experience (and Team skills) and past performance in proposal phases - Identification and description of key critical areas - Understanding and addressing general requirements and needs for the proposed system on the target mission for which it is intended - Recommended trade studies Development Support (70 points) - Reasonableness of cost and schedule estimates - Experience and past performance in development phases - Experience and heritage with respect to similar planetary space flight hardware - Experience developing and implementing similar space flight hardware is a minimum requirement - Completeness of identification of functions by mission phase - Cost control measures - Mass, power, communication, and thermal control the spacecraft can provide to potential payloads - Ability to survive and operate in target environment

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS