Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on July 21, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pasco County RCW Interconnect-Simons Rd and Eiland Blvd

Closed
2024-006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Documents

2

AIA Document G701-2017 Change Order

PDF, High priority: read this firstchange-order
High

City of Zephyrhills 2024-006 Pasco County RCW Interconnect

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of Zephyrhills
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → City of Zephyrhills
Office AddressN/A
Contacts

Full Description

Show more
The City of Zephyrhills is seeking a contractor to install a reclaim water line connecting Pasco County and Simons and Eiland Blvd. A brief summary of work is:Eiland Road Reclaimed Water Main: The Work of this Project includes installing approximately 9,550 linear feet (LF) of 12-inch polyvinyl chloride (PVC) reclaimed water (RCW) force main along Eiland Boulevard from Simons Road to Dairy Road. Horizontal directional drilling of approximately 3,300 LF of 12-inch high-density polyethylene (HDPE) will be used to cross Simons Road, Silver Oaks Drive, Eiland Boulevard, Fair Lawns Drive, Fort King Road, US 301 (Gall Boulevard), and various driveways and sidewalks as shown in the Contract Documents. The remaining 6,200 LF will be installed using open-cut installation methods. Project restoration will include repairing pavement, resodding of affected areas, and replacing the concrete curb/gutter and sidewalkand;Simons Road Reclaimed Water Main: The Work includes approximately 3,460 LF of 12-inch PVC RCW force main along Simons Road from Eiland Boulevard to Bar S Bar Trail. Installation methods include open cut and horizontal directional drilling (HDD) as shown in the Contract Drawings. Approximately 360 LF will be installed by HDD and approximately 3,100 LF will be installed by open cut. Project restoration will include repairing pavement, resodding affected areas, and replacing concrete curb/gutter and sidewalkPlease download all documentation to become familiar with all requirements of this solicitation.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS