Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on June 21, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pavement & Material Replacement

Closed
SLAC_PavementandMaterialReplacementFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Agency

N/A

NAICS

238110 - Poured Concrete Foundation and Structure Contractors

Place of Performance

2575 Sand Hill Road, MENLO PARK, CA, 94025, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Stephanie PinkertonProcurement Specialist

Full Description

Show more
DO NOT CONTACT THE PROCUREMENT SPECIALIST!! IF INTERESTED PLACE YOUR COMPANY'S NAME IN THE INTERESTED AREA! Synopsys This acquisition will result in the award of a contract to remove and replace approximately 8,000 square feet of pavement, 200 linear feet of expansion joint felt and mastic and 20 linear feet of outdoor pipe insulation at the SLAC National Accelerator Laboratory (SLAC) in Menlo Park, California. This removal action (RA) is in accordance with Order No. R2?2009?0072 (Order) adopted in October 2009 for the United States Department of Energy (DOE) and Stanford University (Stanford) by the San Francisco Bay Regional Water Quality Control Board (Water Board). The Order establishes the requirements for investigation and remediation of chemical and radiologic impacts to soil and groundwater resulting from SLAC operations, including historical spills and releases, which have occurred within SLAC. Site Background SLAC is an accelerator and particle physics, particle astrophysics, and photon science research facility located in an unincorporated portion of San Mateo County, California. SLAC is located on property owned by Stanford and leased to the DOE. Intended for high-energy physics research, construction of SLAC began in 1962 with operations commencing in 1966. Since its initial construction and operations, state-of-the-art electron accelerators and related experimental facilities for use in high-energy particle physics and synchrotron radiation research have been designed, constructed, and operated at SLAC. SLAC is operated for DOE by Stanford as a federal facility. DOE provides funding for SLAC operations and environmental investigation and restoration activities at the site. COPCs Chemicals of potential concern, or COPCs in the channels were identified in Remedial Investigation Reports (RIs) and confirmed in Baseline Risk Assessments (BRAs). The identified COPCs for materials to be replaced are polychlorinated biphenyls (PCBs). Responsibilities The Subcontractor shall be responsible for preparation, planning, scheduling, managing, and safely implementing the following: an erosion and sedimentation control plan a project specific health and safety plan (HSP), traffic control plan, and silica control plan; a project work plan, demolition and restoration control plan, and material/equipment staging plan; completion of SLAC provided facility specific training; proof of OSHA-40 Hour Hazwoper and OSHA construction training (i.e., competent person), asbestos worker certifications; proof of heavy equipment training; removal of pavement, mastic, expansion felt and pipe insulation; off-site disposal of removed materials at permitted disposal sites; stockpile management, if needed; dust control; and replacement of the removed pavement, mastic, expansion felt and pipe insulation. SLAC will be responsible for the following with assistance from the subcontractor as necessary: obtaining SLAC excavation permits; ensuring access to SLAC-specific orientation training; arranging underground utility surveys; establishment of guidelines for work near utilities; inspection of subcontractor equipment; and waste characterization.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS