Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on August 22, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pawnee Buttes Trailhead Project

Awarded
AG-82X9-S-12-0110Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 13 hours ago

DEADLINE

in 11 days
NAICS: 237990
New
SLED
Seaview Vehicular Beach Access Ramp Reconstruction Project
Solicitation # 26-B-128CW
The Seaview Vehicular Beach Access Ramp Reconstruction Project, solicitation number 26-B-128CW, is an invitation for bid issued by the County of Volusia to reconstruct a beach access ramp in a residential section of Daytona Beach that was destroyed by Hurricane Ian in 2022. The project scope includes the demolition of storm-damaged infrastructure and the installation of a reinforced concrete vehicular ramp, a pedestrian sidewalk, a concrete cap, and composite sheet pile seawall panels and retaining walls. Additional site improvements include FDOT Type D curbing, an on-beach shower, pavement markings, signage, and full site restoration. The estimated construction cost is 1,213,413.00 dollars, with a total contract performance period of 150 days following the Notice to Proceed. Bids are due electronically via the OpenGov Procurement portal by November 5, 2026, at 3:01 pm, and will be awarded to the single lowest responsive and responsible respondent. The contractor must comply with various regulatory requirements, including permits from the FDEP, USACE, and U.S. Fish and Wildlife Service, as well as the Habitat Conservation Plan for the Protection of Sea Turtles. Mandatory requirements include the provision of payment and performance bonds, comprehensive insurance coverage, and adherence to federal contract provisions such as the Davis-Bacon Act and Equal Employment Opportunity standards. Payments are generally made within 30 days of receipt of an undisputed invoice, with specific sales tax exemption procedures in place for materials.
Coastal

POSTED

about 14 hours ago

DEADLINE

in 6 days

General Info

Contract Value

$146,698

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

See Description, CO, USA

Set-Aside

NONE

Award Issued Date

Documents

7

AG-82X9-S-12-0110.pdf

PDF

Amend+1.pdf

PDF

Amendment+2.pdf

PDF

Attachment+01+-+Specifications.pdf

PDF

Attachment+02+-+Drawings.pdf

PDF

Attachment+03+-+DOL+Wage+Determination.pdf

PDF

Attachment+04+-+Project+Information.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseAwarded
Posted

special-notice

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jun 29, 2012 to Jul 20, 2012.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Arapaho And Roosevelt National Forest
Contacts1 person available
OfficeFORT COLLINS, CO, 80526, USA
Office AddressFORT COLLINS, CO, 80526, USA
Contacts
Malinda JiminezContracting Officer

Full Description

Show more
There are four shelters in total. One of the shelters would be a large group shelter and the three others would be small shelters with one each for each of the three individual picnic sites. The shelters are in the base bid as roofless structures and have two alternative bid items for the two alternate roofs (and either/or choice for the roofs - Alternative Bid #s 1 & 2) and one optional bid item (the architectural trusses). This document contains: A. Salient Characteristics B. Base Bid C. Alternative Bid Items (2 ea.) D. Optional Bid Item (1 ea.) E. Delivery Specifications A. Salient Characteristics Design to local codes: Ground Snow Load = 20 psf Sustained Wind Load = 75 mph (or 22.5 psf) Psf = .004 x V^2 (V=wind speed) 3-Second Wind Burst = 90 mph (or 32.4 psf) Exposure Class = C Seismic Rating = D Frost Line = 30 inches depth 1. Metal posts, beams, rafters and roof 2. Gable roof systems 3. Roof pitch approximately 4:12 4. Roof overhangs vertical support posts by 2' 5. Fascia/rake boards shall be 6" wide on the large shelter and 4" wide on the smaller shelters 6. Vertical distance from ground to bottom of tension beam to be approximately 8'. 7. Rafters/beams/posts square or rectangular metal powder coated Sherwin Williams 6108 Latte or approved equal. Sizes: group shelter shall be 24' x 34' with 6" x 8" beams and rafters and 8' square posts and the three individual picnic site shelters shall be 16' x 18' with 4" x 6" beams and rafters and 6" square posts. 8. Posts surfaces shall be parallel to the building roof edge. 9. Rafters on shall be parallel or - flat' to the roof to reduce horizontal surfaces to discourage bird nesting and exposed to within 2" of roof edge 10. Lightning protection system shall be installed A. Base Bid (roofless shelters) Shelters (one 24' x 34' and three 16' x 18') B. Alternative Bid Items (roofs): 1. Multi-Rib (MR) roofing system powder coated Sherwin Williams 6062 Rugged Brown or approved equal. (Includes: roofing panels, ridge trim, gable flashing, edge trim.) 2. Metal A606 Type 4 Deep Wave corrugated "Rusty" Metal Roofing. (Includes: roofing panels, ridge trim, gable flashing, edge trim.) D. Optional Bid Item (Architectural truss): 1. On gable ends of each shelter install an architectural truss. The truss shall consist of a chord beam running from post top to post top with 3 short posts running up from the center point of the beam. One up to the ridge beam and two flanking ones to the rafters at right angles. Sizes according to Salient Characteristics. E. Delivery: The site is 12 miles north of Colorado State Highway (CSH) 14 (S 28, T10N, R59W). To access drive north on Weld County Road (CR) 129 from CSH 14 at New Raymer, west on CR 110 to Forest Service System Road (FSSR) 807 to site. The picnic shelter(s) supplier shall coordinate with the site contractor responsible for structure erection regarding delivery. The site contractor shall be responsible for off-loading the picnic shelter(s) materials and assuring appropriate condition until acceptance by the government.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS