Peavine Water Pipeline Replacement Project

Forecast
NOE_Peavine Pipeline Replacement_filed_combinedState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Lorenzo Valley Water District is undertaking the Peavine Water Pipeline Replacement Project to repair infrastructure severely damaged by the 2020 CZU Lightning Complex Wildfire. The project involves replacing approximately 1.2 miles of pipeline with new HDPE pipe between Peavine Creek and Foreman Creek near Boulder Creek in Santa Cruz County. Construction is anticipated to last approximately six months, scheduled from June or July through October 2026, with the possibility of pausing until spring or summer 2027 if not completed before the rainy season. Equipment and material staging will be managed at the Johnson Storage Facility in Boulder Creek. The scope of work requires the new pipeline to be attached to existing structures at Peavine Creek crossings in the same manner as the original pipe, with support poles attached to existing concrete structures to avoid impeding waterflow. The project is classified as a Class 2 Replacement or Reconstruction project under CEQA Guidelines, with no significant environmental impacts expected. Strict compliance with federal, state, and local laws regarding hazardous materials is required. Environmental protections are a critical component of the contract. Contractors must implement best management practices for erosion and sediment control, including the use of fiber rolls, silt fencing, and stabilized construction entrances. All personnel must undergo environmental awareness training conducted by a qualified biologist. To protect special-status amphibians, including the Santa Cruz Black Salamander and various frog species, ground-disturbing activities within 200 feet of Peavine and Foreman Creeks are prohibited between November 1 and March 31, as well as during rain events or the 48 hours following them, unless a biologist conducts a site investigation within 24 hours of the activity.

General Info

San Lorenzo Valley Water District to replace 1.2-mile damaged pipeline with HDPE pipe by 2026.

Agency

California → San Lorenzo Valley Water District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Lorenzo Valley Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Lorenzo Valley Water District
Office AddressN/A
Contacts
Chris KlierEnvironmental Programs Manager

Full Description

Show more
The SLVWD watershed and water system were severely impacted and damaged by the CZU Lightning Complex Wildfire in 2020, including the Peavine pipeline. The Peavine Water Pipeline Replacement Project (project) involves replacement of the approximately 1.2-mile-long Peavine pipeline with new HDPE pipe.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, was posted on November 10, 2026, with a response deadline of December 4, 2026. The opportunity is open to various SBA-certified small business categories, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The scope of work involves comprehensive sewer infrastructure improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of sanitary sewer pipes ranging from 6 to 30 inch PVC and 18 to 24 inch DIP, the construction of standard and doghouse manholes, and the execution of 24-inch diameter DIP trenchless crossings with associated launch and receiving shafts. Additional requirements include the fit out of a CSO regulator, outfall installation, and site work such as clearing 5,130 square yards of wooded areas, seeding, and fine grading. Contractors must also provide specialized services including SWPPP implementation and maintenance, geotechnical instrumentation and monitoring, and railroad insurance. The project involves significant excavation work, including extra depth excavation for pipes and manholes, as well as the abandonment of existing pipes and manholes. Interested firms should contact John Connelly at Cleary Construction for bid documents and to discuss subcontracting opportunities.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. The project requires all necessary labor, materials, and equipment to ensure a fully functional system, with specific technical requirements including AC paving, pipe and fitting installation, jack and bore operations, cold planing, demolition, potholing, welding, and the implementation of SWPPP. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, as well as other certified partners such as MBE, SBE, WBE, SBRA, and LSAF. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for the project are Destiny and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the provided bid documents and agency specifications.
Norstar Plumbing and Engineering, Inc

POSTED

about 5 hours ago

DEADLINE

in 8 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS