Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Penetration Firestopping

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Los Angeles, CA, 90024, USA

Set-Aside

NONE

Documents

This scope was carved out of 943981.01.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Gonda Center Deep Energy Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUniversity of California, Los Angeles
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Seals penetrations in fire-rated walls, floors, and roofs for prime contractors on UCLA Gonda Center Deep Energy projects. Installs firestop systems around cables, pipes, and ducts using intumescent strips, ceramic-fiber sealants, and collars. Complies with ASTM E 814, UL 1479, and the UL Fire Resistance Directory. Delivers certified fire-rated penetrations.

Similar Contracts

Same NAICS industry code

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 4 hours ago

DEADLINE

in 10 days
View Details

More opportunities from University of California, Los Angeles

Same awarding agency

NAICS: 238220
New
SLED
Cogeneration Plant New Electric Chiller
Solicitation # 943904.01
Solicitation 943904.01 is for the installation of a new high-efficiency electric centrifugal chiller at the University of California, Los Angeles Cogeneration Plant. The project scope includes the installation of the chiller, an associated pumping system, a new multi-cell cooling tower, and necessary electrical infrastructure. Key objectives are to restore system reliability, maintain critical redundancy, and support campus expansion while transitioning to electrified heating and cooling to reduce greenhouse gas emissions. The work involves integration with the plant's distributed control system and the existing primary secondary chilled water system, followed by full commissioning. The estimated construction cost is 29,175,806.00 dollars. Eligibility to bid is contingent upon a strict prequalification process. Entities must have operated under the same company name and license since 2020, demonstrate the ability to obtain bonding for 29,175,806.00 dollars, and provide evidence of a project costing at least 15,000,000 dollars that included preconstruction services. Required documentation includes a Prequalification Questionnaire, a signed declaration under penalty of perjury, and a resume and experience form for a Mechanical Coordinator with ten years of specific facility experience. The University requires adherence to the UC Fair Wage of 15 dollars per hour, prevailing wage laws, and a commitment to maximize the participation of Small Business Enterprises and Disabled Veteran Business Enterprises. Prequalification documents must be submitted electronically via the UCLA Planroom website by 2:00 PM on November 5, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS