This Solicitation opportunity from California was posted on February 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Penta Invitation for Pre-Qual/SOQ for Design-Build Subcontractors - University Student Union Renovation and Expansion Phase 1 24-25
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The California State University, Long Beach, in partnership with The PENTA Building Group and Gensler, is seeking prequalified design-build subcontractors for the University Student Union Renovation and Expansion Phase 1 project scheduled for 2024-2025. The project involves the comprehensive renovation of the existing 180,000 GSF Student Union building, including interior upgrades, outdoor covered walkways, and seating areas, as well as the demolition of the current University Dining Plaza and the construction of a new 61,000 GSF addition. The project emphasizes sustainability, aiming for LEED Gold Certification and surpassing Title 24 energy efficiency standards by at least 10%, with an energy use index target of 30-40 kbtu per square foot. Construction is slated for completion by May 28, 2028, with the new structures expected to be Type 1A. Interested subcontractors must undergo a prequalification process by submitting their packages by February 17, 2025, demonstrating experience with similar projects completed within the last five years, including details such as project size, scope, and funding type. Only those who meet the prequalification criteria will be eligible to receive bid packages and submit proposals. The scope of work for selected subcontractors includes providing engineered design documents, permit documentation, professional liability insurance during preconstruction, and coordination with the design team, specifically for vertical transportation. The contract size ranges from five to fifteen million dollars, and inquiries or requests for prequalification packages should be directed to Adam Noureddine via email or phone.
General Info
Place of Performance
CA, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from California State University, Long Beach
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
