Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Perimeter Drainage and Foundation Interface Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Long Beach Public Utilities Department involves the excavation and installation of drainage systems and the remediation of foundation interfaces for various facility projects. The scope of work includes installing or repairing perimeter drainage networks, performing network tracking and correction, and utilizing trenching equipment, French drains, and foundation sealants to ensure a functional system and sealed foundation. The project is located in Long Beach, California, and requires strict compliance with DIR public works regulations. Interested parties must submit their responses by October 1, 2026, in accordance with the solicitation posted on August 12, 2026.

General Info

Drainage installation and foundation remediation for Long Beach Public Utilities by October 1, 2026.

Agency

California → Long Beach Public Utilities DepartmentView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Long Beach, CA, 90806, USA

Set-Aside

NONE

Documents

This scope was carved out of UD-26-353.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Water Intrusion Assessment And Mitigation With Full Contractor Services

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach Public Utilities Department
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Long Beach Public Utilities Department
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs excavation and installation of drainage systems for prime contractors on City of Long Beach Public Utilities Department facility projects. Remediates foundation interfaces, installs or repairs perimeter drainage networks, and performs drainage network tracking and correction. Uses trenching equipment, French drains, and foundation sealants. Requires DIR public works compliance. Delivers a functional perimeter drainage system and sealed foundation interface.

Similar Contracts

Same NAICS industry code

More opportunities from California → Long Beach Public Utilities Department

Same awarding agency

NAICS: 238160
SLED
Water Intrusion Assessment And Mitigation With Full Contractor Services
Solicitation # UD-26-353
The Long Beach Public Utilities Department is soliciting proposals under solicitation 20260814025 for a licensed contractor to provide comprehensive water intrusion assessment, mitigation, and full design-build services in Long Beach, California. The project focuses on evaluating designated areas, conducting field diagnostic verifications, and engineering solutions to eliminate active water infiltration during weather events and protect critical infrastructure, including building roofs, envelopes, and drainage pathways. This is a fixed-price contract where the award will be based on the most advantageous proposal, evaluated on a 100-point scale focusing on the contractor's approach (40 points) and experience (30 points). Proposals are due by October 1, 2026, and must be submitted electronically. Mandatory requirements include a pre-proposal site walk and the submission of several certifications, including a Statement of Non-Collusion and a Certification of Compliance. Awarded contractors must adhere to California general prevailing wage rates, OSHA safety standards, and specific environmental regulations, including Order No. 99-060 of the California Regional Water Quality Control Board. The contract includes a five-year confidentiality requirement for all project data and requires the contractor to maintain comprehensive insurance coverage. Final payment is contingent upon the delivery of all project data to the General Manager.
Roofing Contractors

POSTED

28 days ago

DEADLINE

in 19 days
View Details
NAICS: 238160
SLED
Water Intrusion Assessment And Mitigation With Full Contractor Services
Solicitation # UD-26-353
The Long Beach Public Utilities Department is soliciting proposals for solicitation number 20260811095 to provide comprehensive water intrusion assessment, mitigation, and full design-build services. The project focuses on stabilizing conditions and restoring building envelope integrity for three specific assets: Building 550, which requires envelope evaluation and moisture stabilization; Building 560, involving foundation interface and perimeter drainage analysis; and Building 570, focusing on roof surface diagnostics and structural interface protection. The selected contractor will be responsible for a turnkey approach, providing all necessary engineering, construction labor, and waterproofing systems, culminating in a comprehensive deficiency report and an engineered remediation plan. Proposals are due by October 1, 2026, and must be submitted via the Long Beach Buys portal. Award decisions will be based on a 100-point scale, with 40 points allocated to the approach and 30 points to experience. Mandatory requirements include attendance at a pre-proposal site walk and compliance with the Equal Benefits Ordinance, CAL-OSHA safety orders, and California Department of Industrial Relations public work requirements. Final acceptance of work is contingent upon rigorous verification testing, including high-pressure water spray tests, 24-hour manual water ponding, and HVAC condensation integrity runs. The contract is governed by the City of Long Beach terms and conditions, and the awarded contractor must maintain strict confidentiality of all project data for five years following the agreement's termination.
Roofing Contractors

POSTED

about 1 month ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS