Permanent Underground Bypass Pipeline Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
A permanent underground pipeline is to be installed to connect the Water Treatment Plant to the Lake Poway Road Transmission Main, establishing a durable and long-term solution for water conveyance. This subcontract, posted on June 29, 2026, falls under NAICS code 237117 for utility system construction and is scoped to enhance regional water infrastructure reliability in Poway, California. The work involves the design and burial of a robust pipeline system that will provide uninterrupted water flow, reducing dependency on above-ground or temporary conveyance methods. Performance of the work is localized to Poway with no specified set-aside provisions or contracting office details provided, and the project is managed under the oversight of the California State Water Resources Control Board, Division of Drinking Water, District 14.
General Info
Agency
NAICS
Place of Performance
Poway, CASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
