This Solicitation opportunity from Pennsylvania was posted on November 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Contract 2025-WW1 is a solicitation issued by the Perry Township Municipal Authority in Snyder County, Pennsylvania, for the construction of critical wastewater and water infrastructure. The scope of work includes the installation of approximately 8,200 linear feet of 6, 8, and 12 inch gravity sewer lines and associated manholes, two submersible wastewater pump stations, approximately 900 linear feet of wastewater force mains, and a 675 linear foot extension of a 6 inch waterline with appurtenances. The project is located in Mount Pleasant Mills and requires adherence to specific technical standards, including the use of 2A Subbase and compliance with Build America Buy America (BABA) requirements for iron, steel, and manufactured construction materials.
The procurement process involved multiple addenda to clarify technical specifications, update wage rates, and extend the bid deadline to January 9, 2026. Bidders were required to submit electronic proposals via PennBid, accompanied by a bid bond equal to 10 percent of the total bid price, noncollusion affidavits, and equal opportunity certifications. Compliance with the Commonwealth of Pennsylvania Public Works Employment Verification Act and Disadvantaged Business Enterprise (DBE) regulations under 40 CFR 33.301 is mandatory. Following the bid opening on January 9, 2026, Gutelius Excavating Inc. emerged as the lowest bidder with a total proposal of 1,738,445.67 dollars.
General Info
Gutelius Excavating Inc. won a 1,738,445.67 dollar water and wastewater infrastructure project.
PDF, High priority: read this firstpast-performance
HighAI Summary for 00250 - Qualifications Statement: A standard Qualifications Statement form used to collect comprehensive business data from prospective contractors. It includes sections for general business information, organizational structure, licensing, diverse business certifications, safety performance (EMR/TRFR), financial stability, surety information, and insurance coverage.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2025-WW2 New Wastewater Treatment Plant - Drawing Index: Technical drawing index and design standards for the construction of a new wastewater treatment plant for the Perry Township Municipal Authority in Snyder County, PA. The document includes a comprehensive list of 37 sheets covering civil, structural, architectural, MEP, and process piping plans, as well as ADA design standards.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 2025-WW1 - Addendum No. 1: Addendum No. 1 dated December 5, 2025, for the Perry Township Municipal Authority Sewer Collection and Pump Stations project (Contract No. 2025-WW1). This document provides responses to contractor questions from the pre-bid meeting and PennBid, clarifies technical specifications regarding pipe materials and manhole depths, and outlines revisions to the Bid Form, Method of Measurement and Payment, and several technical sections. It also includes the addition of plan sheets C-507 and C-508.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 2025-WW1 Addendum No. 2 - Sewer Collection and Pump Stations: Addendum No. 2 dated December 12, 2025, for the Perry Township Municipal Authority's Sewer Collection and Pump Stations project (Contract No. 2025-WW1). This document provides responses to contractor questions, extends substantial and final completion dates, and introduces revisions to the Bid Form, Method of Measurement and Payment, and various plan sheets. It also adds new specifications for Demolition and Painting and includes updated drawings and E&S sheets.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 2025-WW1 - Addendum No. 3: Addendum No. 3 dated December 19, 2025, for the Perry Township Municipal Authority Sewer Collection and Pump Stations project (Contract No. 2025-WW1). This document provides responses to contractor questions regarding wet well diameters, wash racks, paving details, and as-built requirements. It also updates the Section 00900 Wage Rates, incorporating General Decision Number PA20250018 for various Pennsylvania counties.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 2025-WW1 Addendum No. 4 - Sewer Collection and Pump Stations: Addendum No. 4 issued on December 23, 2025, for the Perry Township Municipal Authority Sewer Collection and Pump Stations project. It clarifies that 2A Subbase must be used (denying a request for 2RC Stone) and extends the bid closing date from January 7, 2026, to January 9, 2026, at 11:00 am. Bidders are instructed to acknowledge receipt on the Bid Form.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 2025-WW1 Addendum No. 5: Addendum No. 5 for the Perry Township Municipal Authority Sewer Collection and Pump Stations project (Contract No. 2025-WW1), dated January 5, 2026. This document provides updated wage rates and specifies that all bids must be submitted electronically via PennBid.net.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 2025-WW2 - Addendum No. 1: New Wastewater Treatment Plant: Addendum No. 1 dated December 5, 2025, for the Perry Township Municipal Authority's New Wastewater Treatment Plant (Contract No. 2025-WW2). This document provides responses to contractor questions from the pre-bid meeting and PennBid, clarifies the scope regarding Dutchland tanks and owner-supplied equipment (SBR and headworks), confirms AIS/BABA compliance, and announces revisions to the Bid Form and specific technical sections (01025, 03310, 03311). It also specifies that all bids must be submitted electronically via PennBid.
PDF
PDF, High priority: read this firstbid-bond
HighAI Summary for Perry Township Municipal Authority - Bid Bond (Penal Sum Form): A standard Bid Bond (Penal Sum Form) template for the Perry Township Municipal Authority. The document outlines the legal obligations of the Bidder and Surety to pay a penal sum upon the Bidder's default in executing the contract agreement and providing required performance and payment bonds.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00371 - BABA Compliance Statement: This document is a Build America Buy America (BABA) Compliance Statement (Section 00371). It outlines the requirements for certifying that iron, steel, and manufactured construction materials used in federally funded projects are produced in the United States in accordance with the Infrastructure Investment and Jobs Act (IIJA). It includes a certification section for the Prime Contractor to sign and attest to compliance.
PDF
PDF, Low priorityother
LowAI Summary for 2025-WW1 Sewer Collection and Pump Station - Noncollusion Affidavit: Document related to the 2025-WW1 Sewer Collection and Pump Station project for Perry Township Municipal Authority. While titled as a Noncollusion Affidavit in the filename, the provided content consists primarily of cover sheets and sewer routing plan placeholders.
PDF
PDF, Low priorityother
LowAI Summary for 2025-WW2 DBE Contract Procurement Breakdown: A procurement breakdown form for the New Wastewater Treatment Plant project (Contract No. 2025-WW2). The document requires the contractor to list all construction, equipment, services, and supplies utilized, specifying whether items are self-performed, subcontracted, purchased, or rented to support DBE compliance and procurement tracking.
PDF
PDF, Low priorityother
LowAI Summary for Contract 2025-WW1 Public Works Employment Verification Form: A Commonwealth of Pennsylvania Public Works Employment Verification Form for the Sewer Collection and Pump Stations project (Contract No. 2025-WW1) in Mount Pleasant Mills, Snyder County. The document requires contractors or subcontractors to affirm compliance with the Public Works Employment Verification Act via the federal E-Verify Program.
PDF
PDF, Low prioritybid-results
LowAI Summary for Contract 2025-WW1 - Sewer Collection and Pump Stations Bid Results: Bid results for Perry Township Municipal Authority Contract No. 2025-WW1 (Sewer Collection and Pump Stations), dated January 9, 2026. The document lists total bid amounts and bid security percentages for eight bidders, with Gutelius Excavating Inc. providing the lowest bid of $1,738,445.67.
PDF
PDF, Low prioritybid-results
LowAI Summary for Contract 2025-WW1 - Sewer Collection and Pump Stations Bid Results: Bid results for Perry Township Municipal Authority Contract No. 2025-WW1 regarding Sewer Collection and Pump Stations. The document lists total bid amounts and security percentages for eight bidders, dated January 9, 2026.
PDF
PDF, Low priorityother
LowAI Summary for Contract 2025-WW2 - Public Works Employment Verification Form: A Commonwealth of Pennsylvania Public Works Employment Verification Form for the New Wastewater Treatment Plant project (Contract No. 2025-WW2) for the Perry Township Municipal Authority. The document serves as an affirmation by the contractor or subcontractor of compliance with the Public Works Employment Verification Act via the federal E-Verify Program.
PDF
PDF, Low priorityother
LowAI Summary for DBE Compliance Statement Form: A template for a Prime Contractor Disadvantaged Business Enterprise (DBE) Compliance Statement. The document serves as a certification that good faith efforts were made to solicit DBE firms in accordance with 40 CFR 33.301 and requires the submission of supporting documentation to the Grant/Loan recipient.
PDF
PDF, Low priorityother
LowAI Summary for Section 00311 - Noncollusion Affidavit of Prime Bidder and Subcontractor: This document contains legal affidavit templates for both Prime Bidders and Subcontractors to certify that their bid proposals are genuine and were not created through collusion, conspiracy, or unlawful agreements to fix prices.
PDF
PDF, Low prioritycertifications
LowAI Summary for Section 00330 - Equal Opportunity Certifications: This document consists of two certification forms regarding Equal Employment Opportunity compliance for bidders and proposed subcontractors, as required by the Commonwealth of Pennsylvania Procurement Code, Title 62 C.S. § 3701.
PDF
PDF, Low prioritycertification
LowAI Summary for Section 00350 - Nonsegregated Facilities Certification: A certification form requiring the bidder to attest that they do not maintain segregated facilities at any of their establishments and will ensure subcontractors do the same. This document serves as a compliance requirement regarding Equal Opportunity clauses.
Ref. #: Perry Township Municipal Authority, Snyder County The Project includes the following Work: The Project consists of the construction of ±8200 L.F of 6”, 8”, and 12” gravity sewer lines and associated manholes. It also includes two submersible wastewater pump stations and ±900 L.F of wastewater force mains. The project will also include ±675 L.F of a 6” waterline extension and appurtenances.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.