This Solicitation opportunity from Department Of Defense was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Peterson SFB Backflow/Cross Connection Survey
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The 21st Civil Engineering Squadron (21 CES) at Peterson Space Force Base is seeking a contractor to perform a one-time comprehensive survey and inventory of all cross connections related to backflow prevention within the base, excluding privatized base housing. This survey is mandated every five years to ensure that the water system remains free from pollution and contamination. The project encompasses identifying and cataloging all backflow prevention devices, with the previous survey having inventoried 213 such devices. Upon contract award, the contractor will receive a detailed list of buildings and a map outlining the survey area within Peterson SFB, Colorado Springs. The solicitation is a total small business set-aside under NAICS code 541620 and is managed by the Department of Defense’s 21st Construction office. The proposal deadline has been extended to allow offerors sufficient time to respond to amendments and requests for information, with the latest submissions due by May 8, 2026. Key clarifications include that resumes and project descriptions can be submitted as appendices beyond the five-page technical approach limit, and potential scheduling concerns should be documented as exceptions within proposals. Points of contact are provided for further inquiries, and bidders are encouraged to familiarize themselves with the specific performance work statement to fulfill the Air Force’s requirements for maintaining infrastructure safety and compliance.
General Info
Agency
NAICS
Place of Performance
Colorado Springs, CO, 80914, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The 21st Civil Engineering Squadron (21 CES) has a new requirement for a one time service for the contractor to survey and inventory all cross connections throughout Peterson Space Force Base (PSFB), Colorado in accordance with the provided Performance Work Statement. The Air Force requires that Water System Backflow Prevention/Cross-Connection survey of all facilities and water-using equipment and systems be completed every five years. This survey is to ensure our Peterson SFB water supply is pollution and contamination free.
AMENDMENT 001:
Amendment made to provide an answer to a Request For Information (RFI) received during the solicitation. To allow time for offerors to address their proposals and acknowledge to Amendment, we have extended the Date Offers Due Date/Time to Friday 8 May at 12 PM MST. Any New Requests for Information will be due No Later Than Wednesday 6 May at 12 PM MST.
RFI and Answers: 1. Please provide a list of the existing backflow assembly inventory. If not available, please provide an estimate of the number of inventoried assemblies and devices from the previous survey.
We have a list of backflow prevention devices, but we would like contractor to provide inventory from survey. The last survey inventoried 213 backflow preventors across base.
2. Please provide a map of the anticipated survey area.
The survey area includes Peterson SFB excluding base housing. Upon award a list of buildings with map will be provided to contractor
3. Please confirm if Base housing will be included within the survey.
Base housing is not included in the survey as it is privatized.
4. Please confirm if the 5-page limit for the technical approach includes resumes and project descriptions, or if those can be included as an appendix.
Can be included as an appendix.
5. Depending on the timeline for providing responses to questions, we encourage the Government to extend the timeline for submittals. Request contractor add exceptions in proposal if they are anticipating having difficulty meeting submittal schedule. Additionally, we are extending the solicitation to allow time to address this RFI.
