Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Petitions Requesting Approval of Temporary Urgency Changes in Water Right Permits 12947A, 12949, 12950, and 16596 in Mendocino and Sonoma Counties

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sonoma County Water Agency is seeking approval from the State Water Resources Control Board to temporarily adjust the hydrologic index used to determine water supply conditions and minimum instream flow requirements in the Russian River watershed, replacing the current metric—cumulative inflow into Lake Pillsbury—with storage levels in Lake Mendocino. This change is urgently needed due to the substantial reduction in potential water imports from the Eel River via PG&E’s Potter Valley Hydroelectric Project, which has disrupted historical water supply patterns. Without this adjustment, mandated water releases from Lake Mendocino and Lake Sonoma could lead to dangerous depletion of reservoir storage, threatening municipal water supplies for communities and critically impacting the survival of listed salmon species in the Russian River. The proposed modification aligns operational decisions with current hydrologic realities, ensuring more accurate and sustainable reservoir management that balances human water needs with ecological protections under the framework of State Water Board Decision 1610. The petition includes a certified environmental exemption under CEQA Sections 15307 and 15308 to streamline approval, reflecting the urgent and temporary nature of the action. The State Water Resources Control Board is the approving authority, with oversight coordinated through its Division of Water Rights in Sacramento, and the agency contact for the petition is Kenneth Emanuel. The performance area includes the Russian River watershed across Mendocino and Sonoma Counties, where reservoir operations and instream flows will be modified if approved. No financial details, procurement clauses, or federal acquisition regulations apply, as this is a state regulatory petition rather than a contractual procurement.

General Info

Sonoma County seeks temporary shift to Lake Mendocino storage for water rules due to Eel River import decline.

Agency

California → State Water Resources Control Board

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Temporary Urgency Change Petitions SCWA Dec 2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Ken EmanuelEnvironmental Scientist
Connie BartonSenior Environmental Specialist

Full Description

Show more
The Sonoma County Water Agency (Sonoma Water) controls and coordinates water supply releases from the Coyote Valley Dam and Warm Springs Dam projects in accordance with the provisions of water rights Decision 1610, which the State Water Resources Control Board (State Water Board) adopted on April 17, 1986. Decision 1610 specifies the water supply conditions for the Russian River and the minimum instream flow requirements for the Upper Russian River, Dry Creek, and the Lower Russian River, which vary based on hydrological conditions and cumulative inflow into Lake Pillsbury as the hydrologic index. Sonoma Water is filing temporary urgency change petitions (TUCPs) requesting that storage thresholds in Lake Mendocino be used as the hydrologic index to determine the water supply condition in the Russian River watershed. An urgent need exists to implement the proposed changes due to the drastic reduction of potential Eel River water imports through Pacific Gas and Electric’s (PG&E) Potter Valley Hydroelectric Project (PVP). Without the proposed changes, the applicable minimum instream flow requirements may require releases of water from Lake Mendocino and Lake Sonoma at levels that would risk significant depletions of storage levels. Such depletions could cause serious impacts to human health and welfare and reduce water supplies needed for protection of listed salmon species in the Russian River. These changes are necessary to ensure that the water supply condition and corresponding minimum instream flow requirements in the Russian River watershed are aligned with actual watershed hydrologic conditions. This is essential to maintain sustainable reservoir/river operations to protect municipal water supply and listed salmon species in the Russian River.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Environmental and Site Assessment ServicesThe contract seeks environmental and site assessment services for a leased facility located in Rutland, Massachusetts, with a primary focus on Phase I and Phase II environmental site assessments, asbestos surveys, and structural evaluations to ensure full compliance with regulatory and safety standards. These services are critical to identifying potential environmental contaminants, validating the presence or absence of asbestos-containing materials, and assessing the structural integrity of the facility prior to occupancy or operational use. The work must be conducted in accordance with applicable federal, state, and local environmental and health safety regulations to mitigate risks and ensure ongoing compliance. The solicitation is classified as a subcontract under NAICS code 541620, which pertains to environmental consulting services, and the proposal submission deadline is October 1, 2026, at 5:00 PM. The place of performance is specifically identified as Main Street in Rutland, with a ZIP code of 01543. The contracting entity is the Central Massachusetts Regional Emergency Communication Center under the Massachusetts agency, though no point of contact or set-aside provisions are specified. The contract is accessible via a public posting on the Commbuys platform, and all responsive offers must meet technical, regulatory, and compliance requirements to be considered for award.
CMR01 - Central Massachusetts Regional Emergency Communication Center

POSTED

about 19 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541620
New
SLED
Environmental & Archaeological AssessmentThe contract encompasses a comprehensive environmental and archaeological assessment to support permitting under the National Environmental Policy Act and Section 106 of the National Historic Preservation Act. It requires the performance of a Phase I Environmental Site Assessment to identify potential contamination, a wetland delineation to determine the extent and boundaries of wetland areas, and archaeological surveys to evaluate the presence of culturally significant resources. These activities are essential for documenting environmental and historical conditions prior to any proposed development or infrastructure projects in Dawson County, Georgia. The work must be conducted in accordance with federal regulatory standards to ensure compliance and facilitate the permitting process. This is a subcontract opportunity posted by the Development Authority of Dawson County, with a response deadline of September 7, 2026. The North American Industry Classification System code 541620 indicates the work falls under environmental consulting services. The performance location is within Georgia, though specific site details are not provided. Interested parties must submit proposals by the stated deadline to be considered, and all activities are intended to support regulatory compliance and due diligence for future development initiatives in the region.
Development Authority of Dawson County

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Environmental Compliance and Historic Site ProtectionThe contract requires full compliance with federal regulations concerning the protection, evaluation, and restoration of historic or prehistoric sites that may be affected by project activities. This subcontract, categorized under NAICS code 541620, mandates that all work be conducted in accordance with established standards to preserve cultural resources, ensuring that any disturbance to significant sites is properly assessed, mitigated, and, where necessary, restored. The awardee must implement measures to identify, document, and safeguard these sites throughout the duration of the project, with specific attention to regulatory frameworks governing federal lands and federally funded initiatives. The solicitation was posted on August 7, 2026, with responses due by August 25, 2026, and is issued by the Utah agency under the Utah state designation. Although specific location details for performance or contact are not provided, the scope of work is tied to any project activity within Utah that impacts historic or prehistoric resources. The obligation extends beyond mere monitoring to include proactive evaluation and, when appropriate, restoration protocols that align with federal preservation mandates. Contractors must demonstrate proven experience and technical capability in cultural resource management to meet the stringent requirements of this agreement.
Utah

POSTED

about 20 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541620
New
SLED
Environmental Compliance and MonitoringThe contract involves comprehensive environmental compliance and monitoring services focused on stormwater management, erosion control oversight, and regulatory reporting throughout the construction phase. The work is tied to a project under the Haralson County School District in Georgia and requires adherence to established environmental regulations, ensuring that construction activities do not negatively impact surrounding ecosystems or water resources. The contractor will be responsible for implementing and maintaining effective erosion and sediment control measures, conducting regular site inspections, documenting compliance efforts, and submitting required reports to regulatory authorities as needed. This subcontract is categorized under NAICS code 541620, which corresponds to environmental consulting services, indicating a professional scope centered on technical environmental management rather than physical construction. The solicitation was posted on August 7, 2026, with a response deadline set for September 9, 2026, providing interested parties a limited window to submit proposals. Performance is expected to occur in Georgia under the jurisdiction of the Haralson County School District, though specific site locations are not detailed in the provided data. The contract emphasizes continuous regulatory alignment and accurate documentation, making it critical that the selected vendor has demonstrated expertise in environmental monitoring and compliance reporting within construction environments.
Haralson County School District

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details