Phase 1 Motor Control Center Replacements at Jones Island Water Reclamation Facility

Closed
8966426State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
Federal
Camptonville Housing Decommissioning
Solicitation # 127EAX26Q0076
Solicitation 127EAX27Q0010 is a combined synopsis and request for quotation issued by the USDA Forest Service for the decommissioning of barracks and other buildings at the Tahoe National Forest in Nevada City, California. The scope of work includes demolishing structures, clearing and disposing of debris, capping utilities, and performing HAZMAT mitigation for lead paint, asbestos, and animal feces. This is a total small business set-aside under NAICS code 238910, with a small business size standard of 19 million dollars. The anticipated contract is a firm fixed price award with an estimated price range between 100,000 and 250,000 dollars. The government will award the contract based on the lowest price technically acceptable criteria. Qualified offerors must be registered in the System for Award Management and submit four separate PDF documents, including a signed SF-1442, a price proposal schedule of items, and a technical proposal detailing their approach and past performance. A bid guarantee of 20 percent is required for quotes exceeding 150,000 dollars. The selected contractor must commence work within 10 calendar days of the notice to proceed and complete all activities, including final cleanup, within 90 calendar days. The project is subject to the Davis-Bacon Act and Buy American requirements for construction materials.
USDA Forest Serivce

POSTED

about 6 hours ago

DEADLINE

in 29 days

AI Contract Overview

Show more

The contract involves a comprehensive upgrade of electrical and mechanical systems at the Jones Island Water Reclamation Facility. It requires the demolition of 30 existing 480V Motor Control Centers (MCCs), along with the removal of a 13.2kV – 480V load center unit substation and a 13.2kV – 4.16kV motor control unit substation. In their place, the contractor will furnish and install 31 new 480V MCCs, a new automatic transfer switch, a 480V switchboard, and new substations for both 13.2kV – 480V and 13.2kV – 4.16kV systems. To ensure continuous plant operations during construction, temporary electrical systems will be provided. Additionally, the project includes building modifications, HVAC system improvements, and the removal and relocation of an electrical room door, all aimed at modernizing and enhancing the facility’s electrical infrastructure. The solicitation was issued by the Milwaukee Metropolitan Sewerage District, with a response deadline of April 1, 2024, and the project is located in Wisconsin.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → Milwaukee Metropolitan Sewerage District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
• Demolition of 30 existing 480V Motor Control Centers (MCCs); one existing 13.2kV – 480V load center unit substation; and one existing 13.2kV – 4.16kV motor control unit substation. • Furnishing and installing 31 new 480V MCCs; one new automatic transfer switch and 480V switchboard; one new 13.2kV – 480V load center unit substation; and one new 13.2kV – 4.16kV motor control unit substation. • Furnishing and installing temporary electrical systems to maintain plant operations during construction. • Construction of building modifications and HVAC system improvements. • Removal and relocation of electrical room door

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS