This Solicitation opportunity from Wisconsin was posted on February 14, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Application to Excavate in Public Right-of-Way - City of Madison: This document is an application form for contractors to obtain a permit to excavate in the public right-of-way in the City of Madison. It includes a submittal checklist detailing required site plans, traffic control plans, contractor prequalification, notifications, and clearance requirements for utility installations. The application collects applicant and contractor information, proposed work schedule, location, type of facility, purpose, trench type, and boring details. The document emphasizes compliance with city regulations, including traffic control, street parking restrictions, and coordination with city departments such as Forestry and Metro Transit. It serves as a critical permit application to ensure safe and regulated excavation work in public areas.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment No 8 - Sidewalk Plan and Profile Drawing: This document, dated 6/13/2023, provides detailed specifications and guidelines for sidewalk construction and related public right-of-way improvements in the City of Madison. It includes instructions on tree planting approvals, traffic control plan submission, underdrain installation, grading requirements for gutters, ditches, sidewalks, and curb ramps, as well as coordination with city engineers for alignment data. The document emphasizes compliance with City of Madison Standard Specifications for Public Works Construction and ADA guidelines. It also outlines responsibilities for utility verification, contractor prequalification, and permit acquisition for excavation in the right-of-way. The document contains typical section details for S. Park Street and notes on construction practices and city approvals.
PDF
PDF, High priority: read this firstpermit
HighAI Summary for Erosion Control Permit ENG100-2023-03674 for Village on Park Parking Structure: This document is the Erosion Control Permit ENG100-2023-03674 issued by the City of Madison Engineering Division for the Village on Park Parking Structure project located at 2300 S Park ST. The permit is a Full Plan type with a construction start date of 5/1/2023 and expiration date of 6/1/2026. It includes permittee and owner contact information, fee schedule, and detailed permit conditions and requirements such as installation of erosion and sediment control measures, certification by a Professional Engineer, inspection and reporting obligations, and adherence to WDNR Conservation Practice Standards. The permit was approved on 04/27/2023 by Megan Eberhardt.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Phase 2 Village on Park Central Green Space Site Improvements Project Manual Specifications: This document is the Project Manual for Phase 2 Village on Park Central Green Space Site Improvements for the Community Development Authority of the City of Madison, dated February 6, 2025. It includes detailed specifications and requirements for procurement, contracting, general requirements, sitework, concrete, masonry, metals, carpentry, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, conveying equipment, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, and utilities. The manual serves as a comprehensive guide for construction and project execution, providing technical details, procedures, and standards to be followed.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 14009-0-2025-JW Phase 2 Village on Park Parking Structure Site Improvements Addendum 1: This document is Addendum No. 1 dated February 25, 2025, for the Request for Bids (RFB) 14009-0-2025-JW issued by the Community Development Authority of the City of Madison. It provides an update to the original RFB for Phase 2 Village on Park Parking Structure Site Improvements, specifically adding a note about a virtual Bid Talk meeting scheduled for February 28, 2025, at 11:00 a.m. via Zoom. The addendum directs bidders to the project webpage for registration and further information. The original RFB includes key dates such as the project tour, question deadlines, bid submission deadline, and CDA Board approval date.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 14009-0-2025-JW Village on Park Central Green Space Site Improvements: This Request for Bids (RFB) issued by the Community Development Authority of the City of Madison is for Phase 2 Village on Park Central Green Space Site Improvements at 2300 S. Park Street, Madison, WI. The RFB identifier is 14009-0-2025-JW, issued on February 14, 2025. It outlines the project scope including site improvements, construction, demolition, utilities, paving, landscaping, and related work. Key dates include a project tour on March 6, 2025, questions due by March 13, 2025, bid submission deadline on March 27, 2025, and CDA Board approval on April 10, 2025. The project timeline requires work to start after July 1, 2025, with substantial completion by July 1, 2026. The document includes bidding requirements, instructions, contract forms, and bonding requirements. Bidders must submit bid bonds or certified checks and comply with Small Business Enterprise goals.
PDF
PDF, High priority: read this firstspecial-notice
HighAI Summary for Village on Park Parking Structure Erosion Control and Stormwater Notes: This document dated 4/27/2023 from the City of Madison Engineering Division provides erosion control and stormwater management notes for the Village on Park Parking Structure project at 2300 S Park St. It includes permit conditions, responsibilities for erosion and sediment control measures, inspection and reporting requirements, and contact information. The document also contains the City's Standard Operation Procedures for erosion control enforcement updated 6/16/2015, detailing compliance tracking, warnings, citations, and enforcement actions. Additionally, it provides instructions for registration and login to the City of Madison Licenses and Permits system for inspection reporting.
PDF
PDF, Low priorityconstruction-drawings
LowAI Summary for Attachment No 2-Construction Drawings-PH2 Site-Set-2: This document titled 'Attachment No 2-Construction Drawings-PH2 Site-Set-2' appears to be a set of construction drawings related to a Phase 2 site project. The content includes multiple pages with consultant information and contact details for Graef-USA, a consulting firm based in Madison, WI. The document likely serves as a technical reference for construction but lacks detailed solicitation or contract information.
PDF
PDF, Low priorityplan-approval-letter
LowAI Summary for Plan Examination Letter for 808 Hughes Place Parking Structure: This document is a Plan Examination Letter dated July 17, 2023, for the project at 808 Hughes Place, Madison, Wisconsin. It addresses the conditional approval of new building and HVAC plans for a storage group S2 open parking garage owned by the Community Development Authority of City of Madison. The letter confirms compliance with Wisconsin Administrative Code Chapters SPS 361-366 and specifies that construction may proceed subject to local regulations, with required corrections before certain work begins. The building is classified as Type IIB construction and is sprinklered. Inspectors and plan examiners are listed for contact.
PDF
PDF, Low priorityapproval-letter
LowAI Summary for Plumbing Plan Approval Letter for 808 Hughes Pl.: This document is a plumbing plan approval letter dated November 21, 2023, addressed to JSD Professional Services for the project at 808 Hughes Pl., Project Number BLDNCP-2023-18034. It states that the plumbing plans and specifications for sanitary building sewer, water service, and building storm drain (exterior) have been examined and conditionally approved in accordance with Wisconsin Administrative Code Chapter 145 SS. and Section SPS 382.20. The approval is contingent on compliance with listed stipulations and the plans. The Building Inspection Division disclaims liability for defects or damages and reserves the right to order changes if necessary.
PDF
PDF, Low prioritypermit
LowAI Summary for Stormwater Management Permit ENGT20-2023-03675 for 2300 S Park ST: This document is the Stormwater Management Permit ENGT20-2023-03675 issued by the City of Madison Engineering Division for the property located at 2300 S Park ST. It details the permittee, owner, fee schedule, and stormwater management requirements including TSS reduction, oil & grease removal, and runoff control. The permit includes conditions requiring certification by a licensed Professional Engineer and annual maintenance reporting to ensure compliance with the City's Storm Water Management Ordinance (MGO Ch. 37). The permit was approved on 04/27/2023 and covers construction starting 5/1/2023 with estimated completion by 10/31/2024.
PDF
PDF, Low prioritypermit
LowAI Summary for WPDES Construction Site Stormwater Runoff Permit WI-S067831-06: This document is a Construction Site Storm Water Runoff Permit issued by the Wisconsin Department of Natural Resources (WDNR) to the City of Madison DPCED for the Village On Park - Parking Structure & Site Improvements site. The permit number is WI-S067831-06, with a start date of April 27, 2023, and a maximum coverage period of 3 years. It outlines regulatory requirements under Wisconsin statutes and administrative codes for erosion control and storm water management during construction. The permit includes conditions for routine inspections, reporting, posting of the Certificate of Permit Coverage, and procedures for termination of coverage. The document also provides contact information and instructions for compliance and enforcement.