Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on October 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Phase I - 20th Street Pedestrian Improvements and Multi-Use Trail Construction Project

Closed
ITB 24-40State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The project involves constructing pedestrian facilities along 20th Street in DeFuniak Springs, Florida, as part of Phase I of the North End Multi-Use Trail and Pedestrian Path Connection. The work spans approximately 0.75 miles, starting at Walton Road and extending south to Emerald Coast Technical College. Key features include the installation of a 5-foot sidewalk, connections to existing pedestrian infrastructure, crosswalks, striping, signage, and related improvements to enhance pedestrian safety and accessibility. The contract is set for a duration of 90 days to reach substantial completion, with an additional 30 days allocated for punch list items. The project is managed by Walton County and falls under the NAICS code 237990, with a contract value estimated between $500,000 and $1,500,000. Interested contractors can contact Jason Cutshaw via email or phone for further details, and the solicitation was posted on October 7, 2024, with responses due by November 5, 2024.

General Info

Documents

4

Contract No. 24-40 for 20th Street Pedestrian Improvements and Multi-Use Trail - Phase 1

PDF, High priority: read this firstcontract-document
High

ITB 24-40 Phase I - 20th Street Pedestrian Improvements and Multi-Use Trail Construction Project

PDF, High priority: read this firstitb
High

Walton County 20th Street Phase I Contract Plans

PDF, High priority: read this firstcontract-plans
High

Public Construction Bond for Walton County, Florida

DOC, Low priority2 pages · bond
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Aug 20, 2024 to Nov 5, 2024. The notice title changed. NAICS code changed from 237110 to 237990. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Walton County
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Walton County
Office AddressN/A

Full Description

Show more
The proposed project, hereinafter referred to as the “Project” consists of the construction of pedestrian facilities along 20th Street in DeFuniak Springs, Florida for Phase I of the North End Multi-Use Trail and Pedestrian Path Connection project. Construction limits for Phase I of the 20th Street pedestrian improvements begins at the intersection of Walton Road and 20th Street and will extend south approximately 0.75 miles, to terminate at the Emerald Coast Technical College. Improvements include the construction of a 5 ft sidewalk and connections to existing pedestrian facilities along the eastern right-of-way of 20th Street along with associated crosswalks, striping, signage, and other work associated with sidewalk construction.Location: DeFuniak Springs, FloridaContract Time: The contract duration is Ninety (90) days to substantial completion with an additional Thirty (30) days for punch list completion.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS