Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Phase II Environmental Site Assessment by Enterprise Rent-A-Car at East Harbor Island

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Enterprise Rent-A-Car Company of Los Angeles, LLC has contracted Stantec Consulting Services, Inc. to conduct a Phase II Environmental Site Assessment at the National Rent-A-Car Quick Turnaround facility on East Harbor Island in San Diego, California, as part of the pre-demolition phase of the Environmental Management Plan. The assessment aims to identify the presence and extent of hazardous substances and petroleum hydrocarbons in areas of environmental concern previously identified in a Phase I ESA from April 2024, including seven specific locations such as fuel systems, maintenance areas, a former above-ground storage tank, and undocumented fill. The work will involve up to 29 soil borings, drilled to depths of up to eight feet with exceptions for two locations at fifteen feet, using hand tools for shallow depths and direct-push technology for deeper sampling. Groundwater and soil headspace will also be sampled, and drilling methods will adjust in real time based on subsurface conditions and field monitoring. All borings will be backfilled with cement-bentonite grout and sealed with asphalt to restore surface conditions. The investigation is scheduled for summer 2026 and will last approximately eight weeks. Any waste generated during sampling, including soil cuttings and decontamination fluids, will be stored temporarily in DOT-approved 55-gallon drums on-site before being transported for disposal based on finalized waste profiling. The project’s scope is narrow and will not involve significant construction activity, resulting in minimal vehicle traffic and no anticipated negative impacts on air quality, greenhouse gas emissions, or local traffic. Enterprise Rent-A-Car will ensure full compliance with all applicable federal, state, and local regulations concerning hazardous materials, demolition debris, and stormwater management. The San Diego Unified Port District is overseeing the activity through its Property and Facilities Manager and Planner I, with contact information publicly available for inquiries regarding the project.

General Info

Phase II ESA at San Diego facility to assess hazardous substances via 29 soil borings and groundwater sampling in summer 2026.

Agency

California → San Diego Unified Port District

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

(1)

2026-055 Phase II Environmental Site Assessment NOE by Enterprise Rent-A-Car

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Mitchell PrickettProperty and Facilities Manager

Full Description

Show more
The proposed project would allow for a Phase II Environmental Site Assessment (ESA) by Stantec Consulting Services, Inc., as contracted by Enterprise Rent-A-Car Company of Los Angeles, LLC (Applicant), in support of the National Rent-A-Car (RAC) Quick Turnaround (QTA) San Diego Airport Facility Demolition Environmental Management Plan (DEMP) in the city of San Diego, California. Activities associated with the site assessment would include, but not be limited to, a geophysical survey, the collection of sample soil borings, and groundwater sampling at various locations throughout the current National RAC QTA San Diego Airport facility on East Harbor Island. The Phase II ESA would be conducted as part of the pre-demolition phase of the DEMP to assess the presence of hazardous substances and/or petroleum hydrocarbons associated with areas of environmental concern (AOCs) previously identified in a Phase I ESA, dated April 2024, and the general extent of chemicals of potential concern attributable to AOCs from operations during the Applicant’s lease period. The Phase II ESA would additionally obtain preliminary subsurface information in the area of a proposed stormwater catch basin to be constructed at a later date during the DEMP. Up to approximately 29 soil borings would be conducted at seven (7) AOCs throughout the proposed project site: • HDTF-7: Building 60 Preservation Slab • HDTF-8: Building 60 Fuel and Drain System • HDTF-9: Building 60 Fuel Lab Sump and Internal Pit • HDTF-13: Storm Drain System • National-1: Automobile Maintenance, Car Wash, and Hazardous Waste Storage Areas • National-3: Former AST • Fill-1: Undocumented Fill Borings would be collected at various intervals up to a depth of approximately eight (8) feet below ground surface (bgs), with the exception of HDTF-8 and HDTF 9, which borings would be collected at a depth of up to 15 feet bgs. Due to uncertainties in subsurface characteristics and conditions, boring depths may be modified as necessary based on observations of lithological contacts, the capillary zone, and photoionization detector monitoring results of soil headspace. Borings would be drilled using hand tools, such as hand-augers, up to five (5) bgs prior to mechanical drilling, which would be drilled using direct-push technology, such as a truck-mounted drill rig. Borings would be backfilled with cement-bentonite grout to approximately one (1) foot bgs, and capped with asphalt to match the surrounding ground cover. The proposed project is anticipated to occur in Summer 2026 and would take approximately eight (8) weeks to complete. Investigation-derived waste (IDW), including soil cuttings and decontamination liquids, would be temporarily stored onsite in U.S. Department of Transportation-approved 55-gallon drums until offsite transport and disposal. Final disposal of IDW would be determined based on waste profiling from sampling characterization results. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction, demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is issuing a Request for Interest (RFI) under solicitation BD-27-1045-BWR00-BWR01-133675 to identify Public Water Supplies and municipalities with Water Management Act (WMA) permits or registrations interested in receiving a free American Water Works Association (AWWA) M36 water audit. The program targets entities that are not meeting the Unaccounted-for Water (UAW) performance standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible participants may receive either a Top-Down Audit or a Bottom-up Component Analysis. MassDEP will hire a private consulting firm through a separate public procurement process to conduct these audits. Selection is based on criteria including high UAW rates, WMA allocation status, recent improvement efforts, and permit status, with priority given to WMA permit holders and projects benefiting disadvantaged communities. Participation is limited to entities in compliance with the MBTA Communities Act Law. Selected applicants must provide a written commitment to have detailed system information for 2025 or 2026 available by January 15, 2027, and submit that data by February 2, 2027. Additionally, participants must commit significant personnel time as an in-kind match and be able to execute a contract within 15 to 30 days of the grant award. Responses must be submitted via email by October 21, 2026, using the provided application form.
BWR00 - Bureau of Water Resources

POSTED

about 20 hours ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS