Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on October 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Phased South Park Drainage Improvements Project

Closed
SU0-24-089-SState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes from various trades, including SWPPP, survey, aggregates, demolition, paving, precast concrete, masonry, metals, coatings, process equipment, fire suppression, piping, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 1 hour ago

DEADLINE

in about 10 hours

AI Contract Overview

Show more

The Seattle Public Utilities (SPU) is seeking a qualified consulting team to support the design and construction phases of the South Park Drainage Improvements Phase 2 project, aimed at addressing chronic flooding issues in the South Park Lower Industrial sub-basin. This area has experienced frequent flooding from stormwater and overland flows, compounded by inadequate drainage infrastructure and poor street conditions. The project builds upon previous improvements, including the West Duwamish Trail and Phase I drainage and roadway enhancements, and aims to further improve drainage and mobility along approximately six blocks. The scope includes a phased approach consisting of a Sea Level Rise Adaptation Feasibility and Scoping, detailed design, engineering services during construction, and community outreach over a total duration of about 5 years, with an estimated contract value of 4.5 million dollars out of a total project budget of 26 million dollars. Funding is partially expected from the Environmental Protection Agency, although the EPA is not a party to the contract. The contract, identified as the Phased South Park Drainage Improvements Project, was posted in October 2024 with a response deadline in November 2024. It is structured as a single, multi-year agreement with options for extension, allowing for work assignments tailored to each project phase. The NAICS code indicates a focus on heavy and civil engineering construction. The project emphasizes transparency and ethical conduct, aligning with Seattle’s Ethics Code, which promotes integrity, impartiality, and public trust. The primary point of contact for this solicitation is Ajla Suta, reachable via email or phone, and additional project details can be accessed through the city’s procurement portal.

Documents

12

24-089-S Phased South Park Drainage Improvements - Insurance Requirements

DOCX, High priority: read this firstspecifications
High

24-089-S Phased South Park Drainage Improvements RFQ

PDF, High priority: read this firstrfq
High

Attachment 5: WMBE Consultant Inclusion Plan

DOCX, High priority: read this firstsupporting-document
High

City of Seattle Consultant Questionnaire (Over $67K)

DOCX, High priority: read this firstpast-performance
High

City of Seattle SPU Consultant Agreement Template

DOCX, High priority: read this firstcontract-document
High

South Park Drainage and Roadway Partnership Project - Supplement to Final PE Report

PDF, High priority: read this firstspecifications
High

Attachment 3 Seattle Ethics Code Brochure

PDF, Low priority16 pages · other
Low

Attachment 7: Byrd Anti-Lobbying Certification

DOCX, Low prioritycertification
Low

IRS Form W-9 Request for Taxpayer Identification Number and Certification

PDF, Low priorityw-9-form
Low

South Park Conveyance Drainage Project - Draft Phase I ESA

PDF, Low priorityspecifications
Low

South Park Conveyance Drainage Project - Phase I ESA Appendices

PDF, Low priorityspecifications
Low

South_Park_Conveyance_Draft_Paving_Report.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Seattle Public Utilities (SPU)
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Project Description: Seattle Public Utilities (SPU) is seeking a consultant team to complete design and construction support of drainage improvements of the South Park Drainage Improvements phase 2 project. The South Park Lower Industrial sub-basin has a long history of flooding, up to multiple times per year, from stormwater, overland flows, and lack of adequate drainage infrastructure. Additionally, streets in this industrial area are in poor condition. The City of Seattle has undertaken a major program to construct drainage and roadway improvements, a stormwater pump station and is in options analysis for a future water quality facility.Prior drainage and roadway improvements in the Lower Industrial Area include the multi-modal West Duwamish Trail along S Portland St between 2nd Ave S and 8th Ave S, as well as the South Park Drainage and Roadway Improvements Phase I Project, which improved drainage and right-of-way mobility along 10 blocks. The City is now moving to design the next tier of priority investments. This project is anticipated to improve drainage and mobility along roughly 6 blocks. This will be a phased contract, with 2 to 3 phases:Sea Level Rise Adaptation Feasibility and Scoping (3-month duration)Design (2-year duration) o Engineering Services During Construction (1.5-year duration)Community outreach and engagement during design and construction (3.5-year duration)The total estimated contract amount is $4.5M and the total project budget estimate is $26M. SPU intends to execute a single, 5-year phased consultant services contract, with an option to extend additional years. Work Assignments will be prepared and executed for each phase.This contract is expected to be funded in part by the Environmental Protection Agency (EPA). The EPA nor any of its departments or employees are, or shall be, a party to any contract or any subcontract resulting from this solicitation.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS