Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Phon D. Sutton River Access Ramp

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Forest Service is seeking a contractor for the Phon D. Sutton River Access Ramp project in Mesa. This design and build contract involves the construction of a durable, hardened cement concrete kayak access ramp extending from the east parking lot down to the Salt River. The primary goals of the project are to reduce bank damage, separate different user groups, and improve overall recreation safety. Due to the steep terrain, the ramp is designated as a non-accessible route. The contractor is responsible for ensuring the surfacing extends the full length of the slope to the water and is properly anchored and armored along the upstream edge to prevent erosion. This forecast is categorized under NAICS code 238110 and is managed by the Department of Agriculture.

General Info

Forest Service contract for designing and building a concrete kayak ramp in Mesa.

Agency

Department of Agriculture → Forest ServiceView Agency

NAICS

238110 - Poured Concrete Foundation and Structure ContractorsView NAICS

Place of Performance

MESA, AZ, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment of Agriculture → Forest Service
Contacts2 people available
OfficeN/A
Organization / Agency
Department of Agriculture → Forest Service
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
Design and build contract to provide a durable formalized kayak access route that reduces bank damage separates user groups and enhances recreation safety. The Contractor shall design furnish and construct a hardened cement concrete kayaker access ramp from the east parking lot down to the Salt River. The ramp is a non-accessible route due to steep terrain. Surfacing shall extend the full slope length to the water be adequately anchored and armored along the upstream edge to resist erosion.

Similar Contracts

Same NAICS industry code

More opportunities from Department of Agriculture → Forest Service

Same awarding agency

NAICS: 237310
Federal
Solicitation is Restricted to the Current Region 3 FERM BPA Holders - USDA Forest Service
Solicitation # 127EAX26Q0077
Solicitation 127EAX26Q0077 is a total small business set-aside issued by the USDA Forest Service for the reconstruction and maintenance of approximately 15 miles of National Forest System Roads within the Santa Fe National Forest in New Mexico. The project specifically targets the stabilization of roads and drainages near the Hermits Peak/Calf Canyon Fire burn scar to reduce erosion and restore safe access. This opportunity is restricted exclusively to current Region 3 Forest Engineering and Roads Maintenance Blanket Purchase Agreement holders operating in New Mexico. The place of performance is located in Las Vegas, New Mexico, under NAICS code 237310. The contract emphasizes strict environmental stewardship and sustainability standards. Contractors must utilize products meeting specific biobased content thresholds, including 90 percent for diesel fuel additives, 77 percent for erosion control products, 71 percent for greases, and 44 percent for hydraulic fluids. Compliance with ENERGY STAR, WaterSense, and EPA EPEAT standards is required, and contractors must submit annual biobased product usage reports via SAM.gov by October 31. Proposals are due by September 9, 2026. While specific pricing and evaluation weights are not provided, the project focuses on meeting these sustainability benchmarks as primary quality criteria.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 17 days
View Details