Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

PHWA - DESALTER IMPROVEMENTS – BAG FILTRATION SYSTEM REPLACEMENT WA2504

Active
ITB-2026-0002State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Port Hueneme Water Agency is soliciting bids for project WA2504, which involves pretreatment improvements at the Brackish Water Reclamation Demonstration Facility located at 5751 Perkins Road, Oxnard, California. The scope of work includes the demolition and removal of the existing bag filtration system and the installation of two new horizontal cartridge filtration systems, along with all necessary piping, fittings, structural supports, and excavation. The project requires the contractor to provide all labor, materials, and equipment, including the delivery of manufacturer warranties and operation and maintenance manuals. A critical operational constraint is that the entire treatment plant may be bypassed for up to four weeks to facilitate installation, and the contractor must provide a baseline schedule accounting for this period. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals using the agency's specific forms and include a bid bond of at least 10 percent of the total bid price. The successful contractor will be required to provide performance and payment bonds equal to 100 percent of the contract price and must comply with California Labor Code prevailing wage requirements and registration with the Department of Industrial Relations. The project must be completed within 112 working days from the date of the Notice to Proceed. All work must adhere to specific technical standards, including ASME Section IX for welding and AISC specifications for structural steel, and must meet Ventura Countywide Stormwater Quality Management Program BMPs.

General Info

Bids for pretreatment improvements and filtration system installation at Port Hueneme Water Agency.

Documents

4

Desalter Improvements – Bag Filtration System Replacement (Project No. WA2504)

PDF, High priority: read this firstifb
High

PHWA Desalter Improvements - Bag Filtration System Replacement Technical Specifications

PDF, High priority: read this firstspecifications
High

Port Hueneme Water Agency - Desalter Improvements Bag Filtration System Replacement Plans

PDF, High priority: read this firstspecifications
High

Project No. WA2504 - PHWA BWDF Improvs Phase I Special Provisions

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Port Hueneme Public Works
Contacts2 people available
OfficeCA, USA
Office AddressCA, USA

Full Description

Show more
The project consists of furnishing all labor, materials, and equipment necessary to install pretreatment improvements at the existing Port Hueneme Water Agency Brackish Water Reclamation Demonstration Facility . The work includes, but is not limited to, the installation of two (2) horizontal cartridge filtration systems; all associated piping, fittings, appurtenances, and structural pipe supports; excavation and disposal of excess excavated materials; freight and delivery to the project site; manufacturer warranties; operation and maintenance manuals; shop and field testing; and manufacturer-provided on-site services. All work shall be completed in accordance with the Plans and Specifications and shall result in a fully operational pretreatment system. The construction site is located at 5751 Perkins Road, Oxnard, California 93033 , in Ventura County, California .

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and transportation necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include traffic control, SWPPP, construction surveying, electrical work, welding, and preconstruction video. Norstar Plumbing and Engineering, Inc. is the prime contractor seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for this opportunity are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 4 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and related site work including excavation, paving, and erosion control. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and MWBE compliance. Bidders must submit a signed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance with an A.M. Best rating of A-VII or better. Performance begins upon the issuance of a Notice to Proceed, and payments are processed monthly via applications for payment submitted to the Engineer, becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days
View Details
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for a wide range of services, including infrastructure and utilities such as electrical work, pipe supply, and water truck services; material supply for aggregate, geotextile, and ready mix concrete; and professional services including surveying, QC testing, and biological services. The solicitation is set aside for SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Bids must be submitted via email or fax by October 28, 2026, at 2:00 PM and must remain valid for 120 days. All subcontractors are required to hold a valid California contractor license and be registered with the California Department of Industrial Relations per Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement. Additionally, Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursed up to a maximum of 3 percent. Primary contact for this solicitation is Veronica Garcia.
Flatiron Dragados Constructors, Inc.

POSTED

about 4 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. Electrical and instrumentation work includes the installation of new systems, improvements to existing instrumentation, and the rehabilitation and replacement of motor control center components. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of bid for reimbursement. Quotes for services and supplies, including lead abatement, metals fabrication, and painting and coatings, are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 25 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS