Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Piazza del Dotto Winery Use Permit Major Modification P18-00143

Forecast
P18-00143State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Piazza del Dotto Winery Use Permit Major Modification P18-00143, approved by the Napa County Planning Commission on August 20, 2025, authorizes a significant expansion of operations and facilities at the project site located at 7466 St. Helena Highway/State Route 29 in Yountville, California. The modification permits increased production, a higher number of employees, and an increase in visitor volume. Operational changes include the addition of new events to the marketing plan, the expansion of on-premises consumption and visitation areas, and the installation of outdoor speakers for background music. Physical improvements to the site consist of the construction of a 10,500 square foot winery building featuring a 700 square foot lounge, the expansion of the existing cave from 16,000 to 32,500 square feet, the addition of cabanas to the hospitality building patio, and the creation of additional parking spaces. The winery will maintain its current hold and haul system while analyzing a process wastewater treatment system for future installation. The project has been certified for compliance with the California Environmental Quality Act through the adoption of a Mitigated Negative Declaration, with administrative oversight provided by the Napa County Planning, Building and Environmental Services Department.

General Info

Napa County approved Piazza del Dotto Winery expansion for production, facilities, and visitors.

Agency

California → Napa County

Place of Performance

Parcel driveway is off of State Highway 29, CA, 94515

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts2 people available
OfficeN/A

Full Description

Show more
Approval of a Major Modification to the existing Piazza del Dotto Winery to increase production, number of employees, and number of visitors. The project would add additional events to the existing marketing plan, permit visitation and on-premises consumption in additional areas on site, and allow outdoor speakers for background music. Physical changes on site include construction of an approximately 10,500 s.f. winery building with a 700 s.f. lounge building, increase the existing cave from 16,000 s.f. to 32,500 s.f., cabanas on the existing hospitality building patio, and additional parking spaces. The winery would continue the use of the existing hold and haul with analysis of a process wastewater treatment system to be installed at a later date. The project was approved by the Napa County Planning Commission on August 20, 2025.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 15 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 17 hours ago

DEADLINE

in 24 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS