Pier 69 Third Floor Terrace Repair
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails the complete demolition of the existing roof system on the third floor east terrace at Pier 69, including removal of pavers, drainage mat, and waterproof membrane. It requires installation of a new roof system using a pedestal-supported design with thinner pavers to improve drainage efficiency and prevent water accumulation. A new barrier wall will be constructed and installed around the structural steel beams to protect them from future corrosion caused by moisture exposure. All materials removed during demolition, including planters and other components, must be carefully staged and reinstalled using a crane due to their size and weight. The work is scoped to ensure long-term durability and performance of the terrace structure while meeting drainage and structural integrity standards. The project is managed by the Port of Seattle through its Waterfront Project Management division and is classified under NAICS code 238160 for roofing contractors. The solicitation was posted on July 31, 2026, and is currently in forecast status with no set-aside type specified. Primary point of contact is Todd Rehm, reachable at 206-491-2899 or rehm.t@portseattle.org, with Samuel Hansen serving as the project manager. The full details and documentation are available through the Port of Seattle’s online solicitation portal, though no physical address or geographic specifics beyond Pier 69 are provided in the data.
General Info
Agency
NAICS
Place of Performance
Not specifiedSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
