Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Pine Hill Egg Ranch Water System Upgrades – Water Supply Permit (Project)

Forecast
NOE-PineHillEggPermitState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pine Hill Egg Ranch Water System Upgrades project, overseen by the California State Water Resources Control Board Division of Drinking Water, involves the operation of an upgraded domestic water system located in Ramona, San Diego County. The scope of work includes designating Well 20 as the new supply well, disconnecting the previous supply well, adding a 10,000-gallon storage tank, and installing a new distribution line to connect the storage tank to the existing system. This project is classified under NAICS code 237110 and is located at 25955 Hwy 78, Ramona, California, 92065. A water supply permit for the project was issued on September 19, 2025. According to the Notice of Exemption, the project is categorically exempt under Class 1 of the California Code of Regulations section 15301, as it consists of minor modifications to existing facilities with no change in use. Primary administrative and engineering oversight is provided by Joseph Guzman and Anthony Demler.

General Info

Pine Hill Egg Ranch upgrades water system in Ramona, CA, with new well, tank, and pipeline, approved by state regulator.

Agency

California → SWRCB, Division of Drinking Water

Place of Performance

25955 Highway 78, CA, 92065

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Drinking Water
Contacts2 people available
OfficeN/A

Full Description

Show more
The Applicant proposes to operate their upgraded domestic water system. The water system upgrades consisted of designating Well 20 as the new supply well, disconnecting the old supply well, adding a 10,000-gallon storage tank, and installing a new distribution line to connect the storage tank to the existing water system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 16 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS