Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Arizona was posted on March 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pipe Alignment and Sizing Design

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Federal
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency (IEUA) is soliciting engineering consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project (Project No. EN25022.02). The scope of work encompasses project initiation and management, data gathering and site investigations, the development of a Basis of Design Report at a 30 percent design level, and detailed design. Key technical requirements include adherence to NFPA 820 for electrical area classification, IEUA Engineering Design Guidelines for control systems and commissioning, and ASCE (2007) guidelines for the Geotechnical Baseline Report. The project aims to start construction of injection and monitoring wells by May 2028, with injection wells equipping beginning by July 2029. This is a not-to-exceed contract with a set-aside status for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals must be submitted via PlanetBids by January 26, 2027, consisting of a body of the proposal (maximum 35 pages) and a separate fee schedule. Evaluation is based on a 100-point scale covering interviews, team qualifications, and level of effort. Selected consultants must comply with Buy America preferences, the Davis-Bacon Act, and 2 CFR Part 200. Payments are processed monthly via ACH upon approval of invoices by the Project Manager.
Inland Empire Utilities Agency

POSTED

about 4 hours ago

DEADLINE

in 2 months
NAICS: 541330
New
Federal
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency (IEUA) is soliciting professional engineering consulting services for the Chino Basin Program Purified Water Conveyance Design Project in California. The scope of work involves the development of a purified water conveyance system to deliver water from the Advanced Water Purification Facility to injection wells, encompassing project initiation, data gathering, basis of design, detailed design, and bid phase assistance. The project is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals are due by January 26, 2027, via PlanetBids and must be submitted in two separate volumes: a technical proposal limited to 30 pages and a separate cost proposal. Evaluation is based on a 100-point scale focusing on critical success factors, communication, regulatory requirements, cost control, implementation planning, and technical challenges. The contract will be awarded on a time and material basis with a not-to-exceed total amount, including a specific 50,000 dollar allowance for mitigation measures. Pricing must remain firm for the initial two-year term, with subsequent annual adjustments capped at the lesser of the current CPI/PPI (Riverside) percentage or 5 percent. The selected consultant must comply with 2 CFR Part 200 and various federal mandates, including the Americans with Disabilities Act and drug-free workplace requirements. Key deliverables include the provision of Opinion of Probable Construction Cost estimates and construction schedules. Payments will be made via ACH based on electronic invoices submitted to the agency. The agency retains ownership of all reports, drawings, and data produced during the project.
Inland Empire Utilities Agency

POSTED

about 4 hours ago

DEADLINE

in 2 months
NAICS: 541330
New
SLED
Setback Levee Projects - Architecture and Engineering Services
Solicitation # 2026-RFQ-260
Pierce County Planning and Public Works is soliciting architecture and engineering services for setback levee projects across four quadrants of the Puyallup River: Northeast (NE), Northwest (NW), Southwest (SW), and Southeast (SE). The primary objective is to reduce flood risk and improve aquatic habitat through the development of a Delivery Strategy Plan and the creation of construction Plans, Specifications, and Estimates (PS&E). The scope involves a multi-stage design process ranging from 15% to 100% for the NE, NW, and SW quadrants, while the SE quadrant requires design up to 30% for three setback alternatives and a no-change alternative. Technical requirements include meeting US Army Corps of Engineers levee certification standards, achieving a 100-year Level of Protection with 3-foot of freeboard, and implementing engineered bio-revetment and log jams. The initial contract period is anticipated to be 12 months, with an option for the County to renew for an additional three years. The project follows a structured Stage Gate Delivery Process to ensure consistency from inception to closeout. Selection will be based on a points-based evaluation of the most qualified team, with final determinations considering reference checks and interviews. The contract is not set aside for any specific group. All work must comply with MUTCD, WSDOT, and Pierce County standards, as well as RCW 39.12 prevailing wage requirements and ADA and Title VI civil rights regulations.
Planning and Public Works

POSTED

about 12 hours ago

DEADLINE

in 7 days
NAICS: 541330
New
International
Design Services - George Massey Crossing
Solicitation # NOI27-GMC-017
The Province of British Columbia, through the Transportation Investment Corporation and the Ministry of Transportation and Infrastructure, has issued a Notice of Intent for multidisciplinary design services to replace the George Massey Tunnel with a new crossing. This critical infrastructure project aims to improve safety, reliability, and capacity along the Highway 99 corridor in British Columbia. The Province intends to make a direct award to COWI North America Ltd. to complete the existing bridge design, leveraging previous work from the George Massey Tunnel Replacement Project and FRTP. Depending on the final procurement model, the supplier may serve as the designer for a design-builder in a Design-Build scenario, provide services during design and construction in a Design-Bid-Build scenario, or provide services to the Ministry or a contractor delivery team under alternative delivery models. The expected contract term is four years, with an option to renew for three additional one-year terms. As this is a Notice of Intent for a direct award, the process allows other respondents to submit a Challenge via Appendix A to contest the direct award and argue for a competitive process. Challenges must be submitted in English through the BC Bid system, email, or hardcopy by the specified deadline. The selected supplier will be restricted from participating in the competitive selection process for the project's Owner's Engineer. There is no specified set-aside status for this procurement.
Transportation Investment Corporation

POSTED

about 12 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The Water Department of Arizona is seeking a subcontract for the Pipe Alignment and Sizing Design project. The primary objective of this contract is to develop detailed designs for pipe alignment, diameter selection, and material specifications, ensuring all plans are based on specific hydraulic and site conditions. The solicitation was posted on March 10, 2026, with a response deadline of April 16, 2026. This opportunity falls under NAICS code 541330 and does not have a specified set-aside status. Interested parties can find further details through the provided procurement portal.

General Info

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

This scope was carved out of 260167.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

On-Call Engineering Services for New and Replacement Of Distribution And Transmission Mains

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Consulting Services for Chino Basin Program Aquifer Replenishing Facilities DesignOpen now, due in 61 days
  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Water Department
ContactsNo contacts available
OfficeN/A
Organization / AgencyArizona → Water Department
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Develop detailed designs for pipe alignment, diameter selection, and material specifications based on hydraulic and site conditions.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS