Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Pipe Material Supply

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Riverside Public Utilities Department involves the supply of ductile iron pipe and mortar-lined and coated steel pipe to prime contractors. The scope of work encompasses the full manufacturing process, including the provision of fabrication details, shop drawings, and rigorous sampling and testing of all materials. To ensure quality and compliance, all materials must be NSF certified by an accredited laboratory and accompanied by written certification of standards and physical test results upon delivery. The project is categorized under NAICS code 332996, with a response deadline set for December 3, 2026.

General Info

Subcontract for supplying certified iron and steel pipes for City of Riverside utilities.

Documents

This scope was carved out of RPU-8299.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Park Avenue Water Transmission Main Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 12 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 3 documents on the prime contractFrom Park Avenue Water Transmission Main Replacement
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Riverside Public Utilities Department
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies mortar-lined and coated steel pipe and ductile iron pipe for prime contractors on City of Riverside Public Utilities Department projects. Provides manufacturing, sampling, and testing of materials, including shop drawings and fabrication details. Requires NSF certification from an accredited laboratory and written certification of standards. Delivers certified pipe materials with physical test results.

Similar Contracts

Same NAICS industry code

NAICS: 332996
New
SLED
Inventory Threaded Weld Saddles
Solicitation # RFB-AR-3973
The Eastern Municipal Water District (EMWD) is soliciting proposals through a competitive process for the supply and delivery of new, custom-fabricated threaded weld saddles for its inventory program. These saddles, used for tying-in to mainline services, must be fabricated from low carbon steel and forged steel couplings in accordance with the latest edition of the AWWA M-11 Manual and specific technical drawings provided in the solicitation. The contract is awarded for a five-year term with pricing remaining firm-fixed for the first year. Annual price increases are capped at three percent and must be substantiated with documentation and submitted 30 days prior to the anniversary date. Successful bidders will be selected based on bid price and responsiveness to RFB requirements, with past performance serving as a factor in determining responsibility. Deliveries must be made F.O.B. Destination, freight prepaid, to the EMWD Operations and Maintenance Center Warehouse in Perris, California, within five business days of receiving a purchase order. EMWD maintains a strict quality standard requiring new materials in original manufacturer packaging, with a twelve-month guarantee on materials and workmanship following installation. Bids must be submitted electronically via the EMWD e-Procurement portal by 5:00 PM on December 14, 2026.
Eastern Municipal Water District

POSTED

2 days ago

DEADLINE

in 22 days
View Details

More opportunities from California → City of Riverside Public Utilities Department

Same awarding agency

NAICS: 237110
SLED
Park Avenue Water Transmission Main Replacement
Solicitation # RPU-8299
The City of Riverside Public Utilities Department is soliciting bids for the Park Avenue Water Transmission Main Replacement project, located between 12th Street and 14th Street. The scope of work involves the furnishing and installation of various water pipelines, including a 54-inch main, a 36-inch pipeline on 12th Street, and 8-inch pipelines on 13th Street and Park Avenue, along with associated appurtenances such as air-vacuum valves and thrust blocks. Work must adhere to the 2021 Greenbook standards and specific RPU standards. Bidders are required to hold a valid California A General Contract or C-34 Well Drilling Contractor License and must demonstrate experience by providing documentation of at least three potable water main projects of 24 inches or larger and at least 500 lineal feet completed within the last five years. Bids are due by December 3, 2026, and must be submitted electronically via the City's bidding portal. Required submission documents include bid proposal documents, a non-collusion declaration, an Iran Contracting Act compliance affidavit, and a contractor customer service standards acknowledgement. A 10% bid security in the form of a bond or cashier's check is mandatory. The contract will be awarded to the apparent low bidder, and the successful contractor must provide performance and payment bonds for 100 percent of the contract price. The project must be completed within 240 calendar days of the Notice to Proceed, with a requirement to start work within seven calendar days of that notice. There is no set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

10 days ago

DEADLINE

in 11 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS