This Solicitation opportunity from Florida was posted on August 23, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Pipe Replacement - 2500 Block Retunda Parkway
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves comprehensive work to replace an existing 24-inch corrugated metal pipe within an easement running north-south between properties on the 2500 Block of SE 8th Ave and SE 8th Place, including the addition of a manhole to connect the new pipe to the existing infrastructure. The scope encompasses all necessary labor, materials, equipment, and operations, such as tree removal within the easement and right-of-way, obtaining permits, erosion control measures, fence removal and replacement, excavation, and installation of an 18-inch HDPE pipe. The project also includes replacing the north inlet with a new structure, installing a new manhole at the south end of the pipe, and restoring the site with sod and swale repairs. Additional responsibilities involve managing traffic during construction, notifying residents, delivering and removing equipment and materials, street sweeping, and conducting final site cleanup and damage repairs caused by construction activities. The work is to be performed under the jurisdiction of the City of Cape Coral, Florida, with a solicitation posted on August 23, 2023, and a response deadline of September 25, 2023. The project aims to improve drainage infrastructure while ensuring minimal disruption and adherence to all specified standards and regulations.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
• Removal of trees from easement and right-of-way. • Any required permitting. • Erosion Control • Removal, storage, and replacement of fence within the work limits. • Excavation and removal of 24” CMP to limits shown. • Installation of new 18” HDPE pipe. • Replacement of North inlet with new structure, and installation of new manhole at South end of new pipe. • Sod placement. • Swale restoration. • All maintenance of traffic. • Notification to residents. • Delivery and removal of equipment/material to the site (hauling). • Street sweeping, as necessary, & final clean-up of job site and repair of any damage caused by construction activities.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
