Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Pipeline Coating and Corrosion Control

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Pipeline Coating and Corrosion Control supports prime contractors on San Diego County Water Authority aqueduct projects in San Diego. The scope of work involves applying protective coatings to steel pipe sections and joints, which includes surface preparation through blasting, the application of external industrial-grade epoxy or wrap systems, and the installation of cathodic protection to ensure long-term corrosion resistance. To qualify for this engagement, personnel must hold NACE certification to ensure industry-standard quality control during the delivery of coated pipeline sections. The project falls under NAICS code 238320 and is associated with the California agency framework for water infrastructure improvements.

General Info

Subcontract for NACE-certified pipeline coating and corrosion control on San Diego water projects.

Agency

California → San Diego County Water Authority

NAICS

238320 - Painting and Wall Covering ContractorsView NAICS

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

This scope was carved out of Emergency Repair of Pipeline 3 (R0350).

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County Water Authority
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → San Diego County Water Authority
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Applies protective coatings to steel pipe sections and joints for prime contractors on San Diego County Water Authority aqueduct projects. Performs surface preparation via blasting, applies external industrial-grade epoxy or wrap systems, and installs cathodic protection. Requires NACE certification. Delivers coated and corrosion-protected pipeline sections.

Similar Contracts

Same NAICS industry code

NAICS: 238320
New
SLED
Paint All Exterior and Common Area Doors, Buildings 4166, 4167, 4168 & 3673
Solicitation # N400857606105
Solicitation N400857606105 is for a project at MCAS Cherry Point, North Carolina, involving the cleaning, preparation, priming, and painting of approximately 800 exterior and common area doors, frames, vents, and louvers across Buildings 4166, 4167, 4168, 4169, and 3673. Additionally, the scope includes refinishing approximately 2,350 linear feet of handrails at Building 3673. The contractor must ensure a uniform, durable finish, with common area and storage doors painted on both sides and residential doors painted on the corridor-facing side only. All work must be completed within 180 calendar days after the award. The contract will be awarded based on the lowest price and is subject to the Davis-Bacon Act, with a minimum wage requirement of 13.65 per hour for covered workers through December 31, 2026. Bonding requirements vary by proposal value: no bonds for amounts 35,000 and less, a payment bond for amounts between 35,000 and 150,000, and a bid, payment, and performance bond for amounts exceeding 150,000. Proposals are due by September 18, 2026, at 1200 local time. The project requires a Quality Control Manager to oversee the work and ensure compliance with government standards, as any inadequate surface preparation or coating defects will be recoated at the contractor's expense.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS