Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on December 10, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pipeline Dredging Deep Draft Houston Ship Channel Bayport to Morgan's with Bayport and Barbours Flare Harris, County, Texas

Closed
W912HY21S0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Golf Club Green And Tee Box Renovation
Solicitation # 6209
Solicitation 6209 is for the comprehensive renovation of the Santa Barbara Golf Club in California, specifically focusing on the #10 Tee Box and the #13 Green. The scope of work includes releveling and expanding the #10 Tee Box to meet playability and drainage standards, reshaping the #13 Green through contouring and fine grading, and fully renovating the #13 greenside bunkers with new excavation, drainage, and liner placement. Technical requirements include the installation of USGA greens subsurface drainage, a 12-inch root zone mixture, and sodding with Centennial Bentgrass and Kikuyu grass. The project is expected to begin around November 2026 and must be completed within six weeks, with work permitted Monday through Friday from 7:00 a.m. to 5:00 p.m. Bidders must hold a valid California A - General Engineering or C-27 Landscaping contractor's license and submit their proposals via the PlanetBids portal by November 9, 2026. Award evaluation factors include the length and scope of manufacturer warranties and offered payment discounts. The contract mandates compliance with California prevailing wage laws, OSHA safety standards, and ADA regulations. Financial protections include a required payment bond for 100% of the bid total for contracts exceeding $25,000 and liquidated damages of $2,000 per calendar day for delays. Acceptance of the work is contingent upon the approval of the finished subgrade by the designer and the submission of all relevant warranty and guarantee documents.
Santa Barbara Golf Club

POSTED

about 5 hours ago

DEADLINE

in 10 days
NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Solicitation 2027-7110-114 is an Invitation for Bids for Phase 1 construction of Henry H. Bradby Park in Rushmere, Isle of Wight County, Virginia. The project involves the development of a 51.67-acre county-owned parcel, with approximately 6.63 acres of land disturbance and 45.038 acres remaining as undisturbed open space. The scope of work includes site preparation, clearing, demolition, grading, drainage, and the installation of erosion and sediment control and stormwater management facilities. Additionally, the contractor will construct parking trails, recreational facilities, site furnishings, and landscaping, all while adhering to the 2018 Virginia Statewide Building Code and the latest Virginia Stormwater Management Handbook. The project is funded via the National Park Service's Land and Water Conservation Fund, making it subject to strict federal oversight, including Build America, Buy America Act material sourcing restrictions and compliance with the Federal Civil Rights Act of 1964. Award will be granted to the lowest responsive and responsible bidder. The performance period requires substantial completion within 300 days of the notice to proceed, with final completion due 45 days thereafter. Financial requirements include a 5% retainage on construction projects and the provision of performance and payment bonds, with a specific bid bond required for bids exceeding 500,000 dollars. Bids must be submitted through the designated procurement portal by November 16, 2026.
Parks & Recreation

POSTED

about 5 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
Solicitation # PANNWD26P0000030936
The U.S. Army Corps of Engineers, Kansas City District, is conducting market research for the Bank Stabilization and Navigation Program to identify qualified contractors capable of performing complex riverine construction work along the Missouri River, from River Mile 0 near St. Louis, Missouri, to River Mile 553 near Nebraska City, Nebraska. The work involves constructing, modifying, or repairing stone dikes, revetments, bank paving, revetment overlays, and excavation of notches, all of which must be executed using floating equipment due to the absence of land access. Operations require mobilization of barges to transport graded stone from quarries and placement via track-hoe from work barges, with equipment needing to operate in water depths of four feet or more. The Government plans to establish a Multiple-Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract with a combined ceiling of $50 million, consisting of a three-year base period and a two-year optional ordering period. The North American Industry Classification System code is 237990, with a small business size standard of $45 million, and businesses of all sizes are encouraged to respond, though small, 8(a), HUBZone, service-disabled veteran-owned, and women-owned businesses are specifically encouraged to participate, as responses will inform potential set-asides. Respondents must submit a ten-page capability statement detailing their business size, UEI and CAGE codes, bonding capacity, experience with similar projects completed in the last five years, subcontracting arrangements, and joint venture structure, along with organizational contact information. All submissions must be provided electronically in Word or PDF format by the deadline of 12 p.m. CDT on June 1, 2026, to the designated contract specialist and contracting officer. This is a sources sought notice only, not a solicitation, and no funds are available for response preparation or reimbursement. Responses are voluntary, non-binding, and will be used solely for market research to shape future procurement decisions, with proprietary information protected from disclosure.
W071 Endist Kansas City

POSTED

about 6 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

TX

Set-Aside

NONE

Documents

1

B.01.03+Sources+Sought+21S0006+HSC+Bayport+to+Morgans+with+Bayport+and+Barbours+Flare+20201210.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Galveston
Contacts2 people available
OfficeGALVESTON, TX, 77550-1229, USA
Office AddressGALVESTON, TX, 77550-1229, USA

Full Description

Show more
Sources Sought No. W912HY21S0006 Project Title: Pipeline Dredging Deep Draft Houston Ship Channel Bayport to Morgan's with Bayport and Barbours Flare Harris, County, Texas The U.S. Army Corps of Engineers, Galveston District has a requirement for the above subject. THIS IS A NOTICE FOR SOURCES SOUGHT ONLY. THIS IS NOT A REQUEST FOR PROPOSAL OR INVITATION FOR BID. THERE IS NO BID PACKAGE, SOLICITATION, SPECIFICATION OR DRAWINGS AVAILABLE WITH THIS ANNOUNCEMENT. IT DOES NOT CONSTITUTE A PROCUREMENT COMMITMENT BY THE US ARMY CORPS OF ENGINEERS, IMPLIED OR OTHERWISE. NO CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT ANNOUNCEMENT. RESPONSE IS STRICTLY VOLUNTARY; NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOURCES SOUGHT ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. THE GOVERNMENT SHALL NOT BE LIABLE FOR OR SUFFER ANY CONSEQUENTIAL DAMAGES FOR ANY IMPROPER IDENTIFIED INFORMATION. The purpose of this sources sought announcement is to gain knowledge of interested, capable, and all qualified small businesses including but not limited to Small Business, 8(a) Small Business Development Program, Service Disabled Veteran Owned Small Business, and Hubzone firms. The North American Industry Classification System (NAICS) Code 237990; Size Standard is $30 million. To make appropriate acquisitions for the above project, the Government, will use responses to this sources sought announcement and possible future projects as determined to be in the best interest of the Government. The order of magnitude for this effort is estimated between $10,000,000.00 and $25,000,000.00. Project Information: Project Consists of deep draft maintenance Pipeline Dredging as follows: Dredging of the main stem Houston Ship Channel generally between Bayport and Morgan's Point, as well as the Bayport Channel (including Flare and Turning Basin) as well as Barbours Flare. The project will include options. Contractor should be familiar with the dredge material placement areas and the soft material found within them. Contractor should be familiar with the traffic conditions on the Houston Ship Channel. Contractor should provide experience as a prime contractor dredging deep draft navigation channels. Contractor should demonstrate experience producing at least 15,000 cy per day on a deep draft navigation dredging job. The estimated award date for this contract is projected for June of 2021. Completion time for the project is 180 calendar days for Schedule 1 and 90 calendar days for options. The contractor will be required to provide Performance and Payment Bonds within (5) calendar days after award. Contractor will be required to furnish Pre-Award documents within 2 days after Bid Opening. The contractor shall begin Work within (10) calendar days after acknowledgement of the Notice to Proceed. If you can meet all of the requirements for this project, please respond to this sources sought announcement by e-mail, to the attention of Jo Ann McCue and Traci Robicheaux, contact@example.gov and contact@example.gov Responses must be received no later than 02:00 P.M. Central Standard Time on December 21, 2020. The following information is requested: Data Universal Numbering System (DUNS) & Commercial and Government Entity (CAGE) (This information can be obtained from your System for Award Management (SAM) Registration at www.beta.sam.gov ). Name of firm w/address, phone, fax, e-mail address, and point of contact. State if your company is a Small Business, SBA Certified 8(a) firm, HubZone Small Business, or Service Disabled Veteran-Owned Small Business. State whether your firm can provide a Bid Bond (20% of total bid amount), Performance and Payment Bond (100% of the contract amount). Please indicate whether your firm will submit a bid for this project, if this project is set-aside for Small Business, 8(a), Hubzone Small Business, or Service Disabled Veteran-Owned Small Business. Qualifications: Responses to this sources sought announcement shall indicate specialized experience and technical competence in: Contractor should provide experience in completing work outlined under the paragraph above for - Project Information. Provide documentation for your firm on past similar efforts as a prime contractor. (c) Provide a list of your present commitments and completion dates for these commitments. Identify dredge on present commitments and identify dredge and size of dredge to be used on this requirement. The evaluation will consider overall experience. Submission Requirements: Firms submitting responses shall provide information on the most recent up to five projects that prove you can meet the qualification criteria listed above, with contract number, project location, description of work requirements, dredge and size of dredge utilized, average production on the job, contact and phone number for each effort. Firms should also indicate all applicable personnel and sub-contractors proposed to work on the contract. Proof of Small Business Administration (SBA) registration 8(a) and Hubzone Small Business shall be provided with this response. Firms responding to this sources sought announcement, who fail to provide ALL of the required information requested, will not be used to help the Government make the acquisition decision, which is the intent of this sources sought announcement.

More opportunities from Department Of Defense → W076 Endist Galveston

Same awarding agency

NAICS: 237990
New
Federal
Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging
Solicitation # W912HY26BA019
Solicitation W912HY26BA019 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers, Galveston District, for maintenance dredging of the Gulf Intracoastal Waterway from High Island to Causeway, including the channel to Port Bolivar, in Texas. The project focuses on addressing shoaling within tributary channels across Chambers, Galveston, and Brazoria Counties. The scope is divided into a primary schedule involving approximately 959,000 cubic yards of dredging, with five optional work items including the Galveston Alternate Route, Offatts Bayou Channel, Bolivar Ferry Channel, and beneficial use placement at Joycelyn Nungaray. All dredged material is to be disposed of in designated nearby placement areas. The contract requires performance of the primary schedule within 165 to 270 calendar days following the Notice to Proceed. Bidders must provide a bid guarantee of 20 percent of the offer or 3 million dollars, whichever is less, and furnish 100 percent performance and payment bonds upon award. Award will be based on the responsible bidder offering the most advantageous price and price-related factors. Contractors are required to utilize the Resident Management System Contractor Mode and the Construction Management Platform for administration and reporting, and must submit all payment requests electronically via Wide Area WorkFlow. Compliance with the Buy American Act, prevailing wage requirements, and specific subcontracting goals for VOSB and SDVOSB entities is mandatory.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
FY27 Texas City Ship Channel Main Channel and Turning Basin
Solicitation # W912HY27X1CT1
The U.S. Army Corps of Engineers, Galveston District, is conducting a sources sought synopsis for the FY27 Texas City Ship Channel Main Channel and Turning Basin maintenance dredging project. This preliminary planning effort seeks to identify capable and qualified industry partners, including various small business categories such as 8(a), HUB-Zone, SDVOSB, and WOSB. The scope of work involves performing maintenance dredging using a pipeline, hopper, or mechanical dredge, with an estimated construction price range between 10 million and 25 million dollars. The project is expected to have a completion timeframe of 240 calendar days, with an anticipated award date in August 2027. Interested firms must be registered in SAM.gov and provide their UEI and CAGE codes. Responses are due by November 7, 2026, and must include evidence of technical competence, such as three examples of comparable projects completed within the last five years and proof of bonding capacity, including a 20 percent bid bond and 100 percent performance and payment bonds. All work must comply with the USACE Safety and Health Requirements Manual EM 385-1-1 and applicable federal, state, and local regulations. The procurement falls under NAICS code 237990 and is subject to FAR 52.219-14 limitations on subcontracting.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
Federal
Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou
Solicitation # W912HY27RA001
The Houston Ship Channel Expansion Channel Improvement Project 11, Package 9, Segment 4 is a construction effort managed by the US Army Engineer District Galveston to widen and deepen the main channel from Boggy Bayou to Sims Bayou in Harris County, Texas. The scope of work includes widening the channel to approximately 530 feet and deepening it from -41 feet to -46.5 feet. Key activities involve the conveyance and placement of dredged material into the Beltway 8, East Clinton, and West Clinton areas, the removal of abandoned pipelines and a steel bulkhead, and the installation and removal of temporary discharge pipelines. The project is estimated to be valued between 100 million and 250 million dollars. This is an unrestricted Firm-Fixed-Price contract awarded via the Lowest Price Technically Acceptable procedure. The base contract must be completed within 477 calendar days of the Notice to Proceed, with a total potential duration of 603 days if all five options are exercised. Options include additional dredging, pipeline management, and site improvements such as hydroseeding and aggregate surfacing at the Beltway 8 placement area. Proposals are evaluated based on technical approach, schedule, and past performance, with a requirement for a bid bond of 20 percent or 3 million dollars, whichever is less. Performance is subject to the Davis-Bacon Act, Buy American requirements, and strict quality control through a three-phase management process.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING
Solicitation # W912HY26BA018
The FY26 Houston Ship Channel, Texas Bayport Flare Hopper Dredging project is an unrestricted sealed bid solicitation issued by the US Army Engineer District Galveston. The project involves maintenance dredging of the Houston Ship Channel adjacent to the Bayport Flare and the Bayport Flare adjacent to the Bayport Ship Channel across Galveston, Harris, and Chambers Counties, Texas. Dredged materials are to be transported to and disposed of in Ocean Dredged Material Disposal Site zones D and F. The estimated price range for the project is between $25,000,000 and $100,000,000, with a performance period requiring work to commence within 10 calendar days of the notice to proceed and reach completion within 85 calendar days. Key technical requirements include the use of hopper dredging and adherence to the USACE National Dredging Quality Management Program. Contractors must implement an Endangered Species Protection Plan, specifically regarding sea turtle protection and relocation, which are listed as option line items. Contract administration will be managed through the Resident Management System and the Construction Management Platform for handling Controlled Unclassified Information. Bidders are evaluated based on total price and qualifications, with a 10 percent price evaluation preference granted to HUBZone small business concerns. Payments are processed electronically via the Wide Area WorkFlow system under fixed-price construction terms.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS