Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Pipeline Installation & Utility Construction

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Pipeline Installation and Utility Construction involves performing specialized excavation and installation services for prime contractors on projects managed by the Crescenta Valley Water District in California. The scope of work includes trenching, pipe bedding, the installation of water mains, jointing, and pressure testing. Contractors are expected to utilize excavators and trench shoring to install water pipelines made of ductile iron, PVC, or HDPE, ultimately delivering a fully installed and tested system. The project falls under NAICS code 237110 and is centered in the 91214 zip code area. The primary objective is the successful execution of utility construction to ensure the delivery of functional water pipeline infrastructure according to the district's specifications.

General Info

Subcontract for pipeline installation and utility construction for Crescenta Valley Water District, California.

Agency

California → Crescenta Valley Water District

Place of Performance

CA, 91214

Set-Aside

NONE

Documents

This scope was carved out of E-1100A.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Contracted Pipeline Replacement for FY 202-26 (E-1100A)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Contracted Pipeline Replacement for FY 202-26 (E-1100A)
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Crescenta Valley Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Crescenta Valley Water District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs excavation, laying, and installation of new water pipelines for prime contractors on Crescenta Valley Water District projects. Executes trenching, pipe bedding, installation of water mains, jointing, and pressure testing using excavators and trench shoring. Installs ductile iron, PVC, or HDPE water pipe. Delivers an installed and tested water pipeline system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a solicitation issued by Garney Pacific, Inc. for the East Bay Municipal Utility District. The scope of work involves extensive infrastructure rehabilitation, including the repair of covered and open concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, and the replacement of motor control center components. The project also encompasses the modification of sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Key deliverables include lead abatement, metals fabrication, painting, coatings, and FRP reinforcing systems. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 13 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS