Pipeline Installation (Gravity & Force Main)

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of W-19-026-202.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP/Construction Manager at Risk (CMAR) Pump Station Improvements - Hixson 2

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTennessee → City of Chattanooga Business Unit
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs gravity sewer and force main piping for prime contractors on City of Chattanooga pump station projects. Performs trenching, pipe laying, and connection of gravity sewer and force main lines to the network. Requires a utility installation license. Delivers installed and tested gravity sewer and force main piping.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, was posted on November 10, 2026, with a response deadline of December 4, 2026. The opportunity is open to various SBA-certified small business categories, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The scope of work involves comprehensive sewer infrastructure improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of sanitary sewer pipes ranging from 6 to 30 inch PVC and 18 to 24 inch DIP, the construction of standard and doghouse manholes, and the execution of 24-inch diameter DIP trenchless crossings with associated launch and receiving shafts. Additional requirements include the fit out of a CSO regulator, outfall installation, and site work such as clearing 5,130 square yards of wooded areas, seeding, and fine grading. Contractors must also provide specialized services including SWPPP implementation and maintenance, geotechnical instrumentation and monitoring, and railroad insurance. The project involves significant excavation work, including extra depth excavation for pipes and manholes, as well as the abandonment of existing pipes and manholes. Interested firms should contact John Connelly at Cleary Construction for bid documents and to discuss subcontracting opportunities.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. The project requires all necessary labor, materials, and equipment to ensure a fully functional system, with specific technical requirements including AC paving, pipe and fitting installation, jack and bore operations, cold planing, demolition, potholing, welding, and the implementation of SWPPP. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, as well as other certified partners such as MBE, SBE, WBE, SBRA, and LSAF. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for the project are Destiny and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the provided bid documents and agency specifications.
Norstar Plumbing and Engineering, Inc

POSTED

about 7 hours ago

DEADLINE

in 8 days
View Details

More opportunities from Tennessee → City of Chattanooga Business Unit

Same awarding agency

NAICS: 237110
New
SLED
RFP/Construction Manager at Risk (CMAR) Pump Station Improvements - Hixson 2
Solicitation # W-19-026-202
The City of Chattanooga is soliciting a Construction Manager at Risk (CMAR) for the Hixson 2 pump station improvements as part of its Consent Decree program. The project involves the replacement of an aging wastewater pump station with a new facility featuring a 40-foot deep, cast-in-place concrete wet well, three submersible pumps, a controls building, valve and meter vaults, and associated electrical gear and flow monitoring equipment. The scope of work includes the installation of gravity sewer and force main piping, providing temporary bypass pumping during construction, and the demolition of the existing station after commissioning. The selected contractor will provide pre-construction services, collaborating with the City, WSP, and Jacobs to develop construction documents and a Guaranteed Maximum Price (GMP) proposal. Proposals are evaluated based on corporate experience in CMAR or Progressive Design-Build (20%), water/wastewater facilities experience (30%), complex project experience involving karst topography or deep foundations (30%), resources and stability (10%), and proposed fees (10%). Requirements for the proposer include providing a statement of bonding capacity, a ten-year history of project completion and bankruptcy status, and a five-year litigation history. The contractor must provide performance and payment bonds and maintain insurance listing the Owner and consultants as additional insureds. Work must commence within seven to ten days of a Notice to Proceed, with substantial completion requiring full, uninterrupted operation and successful functional testing as certified by the Engineer.
Water and Sewer Line and Related Structures Construction

POSTED

about 24 hours ago

DEADLINE

in 30 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement