This Solicitation opportunity from Minnesota was posted on August 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Piping and Lighting Replacement at RTC Brainerd Building 21
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves a comprehensive renovation project at RTC Brainerd Building 21, encompassing piping and lighting replacements under a single prime contract that covers general, mechanical, demolition, and electrical work. The scope includes removing existing galvanized domestic water piping and replacing it with new copper piping, as well as demolishing obsolete steam and condensate piping. Additionally, the project entails upgrading lighting systems and controls throughout the building, with architectural ceiling removals and reinstallation as necessary to facilitate these upgrades. The work is divided into several alternates, allowing for phased or selective replacement of lighting and controls on different building levels, specifically the lower level, Wing A, and Wing D. Plans and specifications for the project were prepared by Ericksen Ellison and Associates Inc., with detailed guidance on the scope of work. The project is managed by the Minnesota Department of Administration, with a contract size estimated between $500,000 and $1,500,000. The solicitation was posted in August 2024, with a response deadline in October 2024. The project aims to modernize and improve the building’s piping and lighting infrastructure, ensuring enhanced functionality and compliance with current standards. The primary point of contact for the project is Craig Fernholz, an Acquisition Management Specialist, who can be reached via email or phone for further details.
General Info
Agency
Place of Performance
MN, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
A. The work will be done under one prime contract that includes: General, Mechanical, Demolition, and Electrical construction.
B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract.
1. Demolition and replacement of existing galvanized domestic water piping with new copper piping.
2. Demolition of abandoned steam/condensate piping. 3. Replacement of existing lighting and lighting controls throughout the building. 4. Architectural ceiling removals and reinstallations as required for the above scope items. Description of Alternates Alternate 1: Demolition and replacement of the existing lights and lighting controls in the lower level. Alternate 2: Demolition and replacement of the existing lights and lighting controls on the first floor in Wing A. Alternate 3: Demolition and replacement of the existing lights and lighting controls on the first floor in Wing D.
Plans and Specifications were prepared by Plans and Specifications were prepared by Ericksen Ellison and Associates Inc., Matt Armstead, 305 2nd Street NW, Suite 105, New Brighton, MN 55112, +1 (555) 000-0000, +1 (555) 000-0000(fax), contact@example.gov
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
