Piping Support Frames and Concrete Piers

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Chesterfield County Juvenile Detention Center projects involves the installation of structural support frames and concrete drilled pier foundations. The scope of work includes drilling and pouring concrete piers with a 2-foot diameter and 6-foot depth, spaced no more than 10 feet apart, as well as installing piping support frames for eight overhead pipes. The contractor must hold a Virginia Board for Contractors license to deliver the completed foundations and frames. The project is managed by Chesterfield County in Virginia, with performance located in Chesterfield, zip code 23832. The solicitation was posted on November 19, 2026, with a response deadline of December 17, 2026. This contract falls under NAICS code 238110 and has no specified set-aside status.

General Info

Place of Performance

Chesterfield, VA, 23832, USA

Set-Aside

NONE

Documents

This scope was carved out of IFB27000089.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Above Ground Piping Renovation Juvenile Detention Center

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 29 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 3 documents on the prime contractFrom Above Ground Piping Renovation Juvenile Detention Center
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia → Chesterfield County
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs structural support frames and concrete drilled pier foundations for prime contractors on Chesterfield County Juvenile Detention Center projects. Drills and pours 2-foot diameter, 6-foot deep concrete piers spaced no more than 10 feet apart and installs piping support frames for 8 overhead pipes. Requires a Virginia Board for Contractors license. Delivers completed concrete pier foundations and installed support frames.

Similar Contracts

Same NAICS industry code

More opportunities from Virginia → Chesterfield County

Same awarding agency

NAICS: 238220
New
SLED
Above Ground Piping Renovation Juvenile Detention Center
Solicitation # IFB27000089
Chesterfield County is soliciting bids for the above ground piping renovation at the Juvenile Detention Center located at 9600 Krause Road, Chesterfield, VA. The project scope encompasses four primary disciplines: mechanical work to replace temporary hose piping between the Physical Plant (Area F) and Area D with permanent insulated and heat traced piping; sprinkler work involving delegated design and the relocation of the sprinkler riser; electrical installation of eight new branch circuits for heat trace controllers and reconnection of fire alarm circuits; and structural work to provide piping support frames with concrete drilled pier foundations. A non-mandatory pre-bid conference is scheduled for December 3, 2026, and the response deadline is December 17, 2026. Award will be granted to the lowest responsive and responsible bidder based on a lump sum bid. Bidders must hold a valid business license from the Virginia Board for Contractors to be considered. The contract includes specific requirements for packaging and marking, such as machine-engraved labels for electrical panels and the use of safety vinyl tape for workspace clearances. Performance and payment bonds of 100% of the contract price are required if the bid exceeds $500,000. Bids may be submitted electronically via the County's eProcurement system or as a hard copy delivered to the Lane B. Ramsey Building. There is no set-aside status specified for this solicitation.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 3 hours ago

DEADLINE

in 28 days
View Details
NAICS: 562212
New
SLED
Operation & Maintenance of Closed Landfills, Including Landfill Gas & Leachate
Solicitation # 26000290
Chesterfield County is soliciting proposals for the operation and maintenance of three closed landfills: Bon Air, Chester (Carver Heights), and Northern Area. The scope of work requires the contractor to provide all labor, equipment, and materials necessary for the management of landfill gas and leachate collection systems, including the maintenance of wellheads, pumps, and flare stations. Key responsibilities include post-closure care inspections, methane monitoring, wastewater sampling, and cap and slope maintenance in accordance with VDEQ regulations and the County's Post Closure Care Plans. The contractor must designate a local Landfill Gas Manager capable of arriving on-site within four hours for emergencies and must supply a flare and blower system for the Chester Landfill. The contract features an initial twelve-month term with the possibility of four successive one-year renewals. Award selection is based on a weighted evaluation of qualifications and price, with the County reserving the right to award to a single firm or multiple firms. Performance is subject to a zero-defects standard, and all work is guaranteed for twelve months following final acceptance. If the proposal price exceeds $500,000, the contractor must provide performance and payment bonds for 100% of the contract price. There is no specific set-aside status for this solicitation.
Solid Waste Landfill

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS