Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Pit River Tribe Thinning Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pit River Tribe Hat Creek Thinning Project, managed by the Fall River Resource Conservation District, is a wildfire risk reduction initiative located in Shasta County, California, specifically within Township 36 North, Range 4 East, Sections 18-20 of the Mount Diablo Base Meridian. The project aims to protect structures, communities, critical infrastructure, and public and private lands by reducing fuel loads in mixed hardwood-conifer and Sierra mixed conifer forests. To achieve this, the project employs a variety of fuel reduction treatments, including prescribed fire, mechanical fuels reduction such as grapple piling, hand cutting and piling, mastication, herbicide application, and prescribed herbivory. Site preparation will involve mechanical and hand tools, while broadcast burning will be used to approximate historical fire regimes. To minimize ground disturbing impacts, the project will utilize existing roads and trails for control lines, though heavy equipment may be used to establish and hold fire lines. Maintenance of the treated areas will be conducted through targeted grazing, hand treatment, mastication, and herbicide application to control invasive weeds and resprouting brush. The project is categorized as exempt under Section 15304 for minor land alterations and has been determined to have no significant adverse environmental impacts on archaeological sites or endangered species. The primary point of contact for the project is Sharmie Stevenson, Executive Director of the Fall River Resource Conservation District.

General Info

Fall River Resource Conservation District's wildfire risk reduction project in Shasta County, California.

Agency

California → Fall River Resource Conservation Demonstration

Place of Performance

Hat Creek Powerhouse No 2 Road, CA, 96016

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fall River Resource Conservation Demonstration
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fall River Resource Conservation Demonstration
Office AddressN/A
Contacts
Sharmie StevensonExecutive Director

Full Description

Show more
The Fall River RCD has proposed the Pit River Tribe Hat Creek Thinning Project in Shasta County, California. The project would improve the protection of structures, communities, critical infrastructure, and public and private lands from wildfire while protecting environmental, natural and cultural resources. The project would reduce fuel loads in mixed hardwood-conifer and Sierra mixed conifer forests. Fuels reduction treatments would include prescribed fire as well as hand cutting and piling, mechanical fuels reduction (grapple piling), herbicide, prescribed herbivory, and mastication. Methods would also include the use of mechanical and hand tools for site preparation and ignition devices for broadcast burning. Existing roads and trails will be utilized for control lines to avoid ground disturbing impacts to the extent feasible. Heavy equipment may also be used to create and hold fire lines. Maintenance methods would include hand treatment, mastication, broadcast burning, targeted grazing, and herbicide application. Broadcast burning would be used on a frequency to approximate the historical fire regime, while herbicide would be used to reduce the density and continuity of resprouting brush and to control invasive, non-native weeds.

Similar Contracts

Same NAICS industry code

NAICS: 115310
New
International
Splatsin Jackpine Wildfire Risk Reduction Fuel Treatment
Solicitation # 234597
The Splatsin Jackpine Wildfire Risk Reduction Fuel Treatment project, solicitation number 234597, is a fuel management initiative issued by the Splatsin First Nations in British Columbia. The project aims to reduce wildfire risks to the Shihiya School, Water Treatment Facility, and Jackpine road residences within the Enderby IR#2 area. Utilizing a thin from below approach to create a shaded fuel break, the contractor will perform tree hand felling, hand thinning, hand pruning, debris hand piling, burning, and off-site debris removal across 12.8 hectares. Key technical requirements include maintaining surface fuel loading below 0.5 kg/m2, removing 100 percent of conifers in specific layers within 5 meters of Layer 1 crown driplines, and adhering to strict stump height and angle specifications. The contract term runs from November 9, 2026, to April 30, 2027. To be eligible, bidders must be in good standing with WorkSafe BC, be a certified SAFE Company or endorsed by the BC Forest Safety Council, and have completed a comparable project within the last 24 months. A mandatory site visit is required prior to bidding. While the basis of award is generally the lowest bid meeting all eligibility requirements, the company reserves the right to award the contract at its sole discretion. Tenders must be submitted by 12:00 pm on October 30, 2026, via the BC Bid portal or hand delivery to the Splatsin Band Office. Failure to meet the Fuel Management Prescription for Unit A1 may result in payment holdbacks or penalties.
Splatsin First Nations

POSTED

3 days ago

DEADLINE

in 26 days
View Details
NAICS: 115310
New
International
PL28TGC004 - Summer Tree Planting - Prince George
Solicitation # PL28TGC004
The PL28TGC004 contract is a solicitation by BC Timber Sales for summer tree planting services in the Prince George Business Area. The primary scope of work involves planting approximately 1,365,000 trees and 1,197,000 fertilizer teabags, with a final completion deadline of August 7, 2027. The contractor is responsible for the entire operational chain, including the pickup and transportation of seedlings from nurseries, the management of silviculture camps on Crown land via Special Use Permits, and the implementation of an Environmental Management System. Performance is measured against a minimum acceptable planting quality standard of 85 percent, with inspections conducted using the Ministry of Forests Planting Quality Inspection System. Award is based on the lowest priced compliant tender, though the BCTS Planting Contractor Rating System may provide participating contractors a price advantage of up to 7 percent during evaluation. Mandatory requirements for the contractor include a valid Tax Verification Letter from the BC Ministry of Finance, Commercial General Liability and Automobile Liability insurance of at least 2 million dollars each, and BC Forest Safety Council SAFE Company certification for all subcontractors. The contractor must also provide a qualified team of full-time, non-planting key personnel, including a Project Supervisor, Foreperson, Quality Checker, and Pay Plot Checker, as well as a Registered Professional Forester or Registered Forest Technologist to supervise quality and certify final reports. Submissions from U.S. suppliers are not eligible for evaluation.
BC Timber Sales Branch

POSTED

3 days ago

DEADLINE

in 25 days
View Details
NAICS: 115310
New
SLED
(RFFCP2022) Tribal Capacity Building Program – Berry Creek Rancheria (#1742-RFFCP)
Solicitation # 1742-RFFCP
The Sierra Nevada Conservancy is providing funding to the Berry Creek Rancheria of the Maidu Indians of California through the Tribal Capacity Building Program to implement indigenous land stewardship and fire resilience initiatives in Butte County. The project focuses on three specific locations: the Bald Rock Trail Head in Plumas National Forest, 338 Raccoon Road, and the Berry Creek Rancheria Cemetery. Key activities include hazardous fuel reduction, vegetation management, invasive species removal, ecological restoration, and the establishment of native plants. The scope of work encompasses hazard tree removal, manual and mechanical thinning, the construction of control lines, and various biomass management techniques such as chipping, mastication, and piling. Additionally, the project will utilize broadcast cultural and prescribed burning and include the installation of a prefabricated native seed storage shed. The primary objective of this initiative is to enhance ecosystem health and reduce the risk of catastrophic wildfires by fostering a fire-adapted landscape within the Berry Creek Tribal Cultural Landscape. By increasing the capacity of the Grantee to lead prescribed fire efforts and post-fire recovery, the project supports long-term cultural resource stewardship. This effort is supported by a Notice of Exemption under the California Environmental Quality Act, justifying the project's goals of ecological restoration and fuel reduction. Coordination for the project involves the Sierra Nevada Conservancy and the Berry Creek Restoration Workforce to ensure the successful integration of traditional indigenous practices with modern land management.
Sierra Nevada Conservancy

POSTED

3 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS