Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

PL-25-306 Greenfield Farm

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Greenfield Farm project, located at 20150 Black Bass Pass Road in Lower Lake, California, is a commercial cannabis cultivation initiative proposed by applicant Sergey Yusupov under Major Use Permit PL-25-306. The project proposes an 86,308 square foot outdoor cannabis cultivation area within a 40.56-acre parcel, utilizing pots and above-ground planter beds on approximately two acres of the site. Access is via a private driveway with a 14-foot locked metal gate and a Knox Box for emergency response. The site currently includes residential structures, livestock grazing areas, perimeter fencing, interior roadways, and utilities, with no tree removal planned; natural brush and tree cover serve to screen the operation from neighboring properties. The applicant intends to obtain two A-Type 3 Outdoor licenses and a Type 13 Distribution, Self-transport only license from the California Department of Cannabis Control. The parcel’s historical use includes animal grazing and a prior 2020 Early Activation for up to 90,000 square feet of cannabis canopy, which has informed current compliance requirements. Environmental and operational compliance is governed by a suite of management plans—including a Site Management Plan, Nitrogen Management Plan, and Monitoring and Reporting Program—aligned with California Water Board General Orders, the California Environmental Quality Act, and Lake County zoning regulations. Key performance deliverables must be completed and submitted as required, with inspections conducted by multiple governmental agencies including the Lake County Building Division, Air Quality Management District, Fire Protection District, and Department of Cannabis Control. Strict packaging requirements mandate airtight, sanitation-compliant containers to prevent contamination and protect against environmental and wildlife exposure, with all labeling compliant with product, storage, and disposal guidelines. Security protocols require all employees to undergo Live Scan criminal background checks through the Lake County Sheriff’s Department and complete Tribal Cultural Resource Sensitivity Training. Mitigations for wildfire risk include a 2,500-gallon water storage tank and prohibition of grading during red flag conditions, while fugitive dust control is enforced via chip seal or asphalt on access roads. The project operates under a non-federal land-use permit framework, with no federal contract values, FAR clauses, or socioeconomic certifications applicable. Communication and oversight are managed by Sergey Yusupov as the operational point of contact and Mary Claybon, Senior Planner at Lake County, with submissions for compliance reports directed to both the Central Valley Water Board and Lake County Planning Department.

General Info

Sergey Yusupov proposes 86,308 sq ft outdoor cannabis cultivation in Lower Lake, CA, with two A-Type 3 and one Type 13 licenses, compliant with local and state regulations.

Agency

California → Lake County

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Spruce Grove Road, CA, 95457

Set-Aside

NONE

Documents

(8)

Property Management Plan for Cannabis Operations - Greenfield Farm

PDFproperty-management-plan

Notice of Intent to Adopt Mitigated Negative Declaration for Greenfield Farm Project PL-25-306

PDFspecial-notice

Notice of Completion (NOC) Signed Document

PDFnoc

Hydrological Assessment and Drought Management Plan for Green Field Farm

PDFtechnical-memorandum

Site Plans

PDFother

Initial Study PL-25-306 Greenfield Farm Environmental Checklist

PDFinitial-study

Biological Resources Assessment for Cannabis Cultivation Project at 20150 Black Bass Pass

PDFbiological-assessment

Summary Form for Greenfield Farm Cannabis Project PL-25-306

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Lake County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Lake County
Office AddressN/A
Contacts
Mary ClaybonSenior Planner

Full Description

Show more
The Greenfield Farm project site is located at 20150 Black Bass Pass Road, Lower Lake, CA. The project site is located approximately 650 feet east of Spruce Grove Road and approximately six miles southeast of downtown Lower Lake. The Applicant, Sergey Yusupov has applied for a major use permit from Lake County identified as PL-25-306 for a total of 86,308 square feet (sf) outdoor commercial cannabis canopy area. The property is accessed via private drive from Black Bass Pass Road. Outdoor cannabis cultivation in pots or above ground planter beds is proposed on approximately two acres of the project site. The total parcel acreage is approximately 40.56 acres. The applicant will be applying for two A-Type 3 Outdoor licenses and a Type 13 Distribution, Self-transport only license from the Department of Cannabis Control. The existing conditions of the project site include residential and residential accessory structures, livestock grazing, and full perimeter fencing. The site is developed with interior roadways and utilities. The driveway to the property has a 14-foot metal locked gate at the entrance with a Knox Box for emergency access. The remaining area of the property surrounding the residential structures consist of native grass, trees, and ponds. No tree removal is proposed. The project site contains brush and tree cover to naturally screen the cultivation from neighboring properties. Historic uses of the parcel include animal grazing and Early Activation (EA 20-36) of the Major Use Permit (UP 20-30) in 2020 for up to 90,000 sf of commercial cannabis canopy from June 1, 2020, to December 1, 2020.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Environmental and Site Assessment ServicesThe contract seeks environmental and site assessment services for a leased facility located in Rutland, Massachusetts, with a primary focus on Phase I and Phase II environmental site assessments, asbestos surveys, and structural evaluations to ensure full compliance with regulatory and safety standards. These services are critical to identifying potential environmental contaminants, validating the presence or absence of asbestos-containing materials, and assessing the structural integrity of the facility prior to occupancy or operational use. The work must be conducted in accordance with applicable federal, state, and local environmental and health safety regulations to mitigate risks and ensure ongoing compliance. The solicitation is classified as a subcontract under NAICS code 541620, which pertains to environmental consulting services, and the proposal submission deadline is October 1, 2026, at 5:00 PM. The place of performance is specifically identified as Main Street in Rutland, with a ZIP code of 01543. The contracting entity is the Central Massachusetts Regional Emergency Communication Center under the Massachusetts agency, though no point of contact or set-aside provisions are specified. The contract is accessible via a public posting on the Commbuys platform, and all responsive offers must meet technical, regulatory, and compliance requirements to be considered for award.
CMR01 - Central Massachusetts Regional Emergency Communication Center

POSTED

about 19 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541620
New
SLED
Environmental & Archaeological AssessmentThe contract encompasses a comprehensive environmental and archaeological assessment to support permitting under the National Environmental Policy Act and Section 106 of the National Historic Preservation Act. It requires the performance of a Phase I Environmental Site Assessment to identify potential contamination, a wetland delineation to determine the extent and boundaries of wetland areas, and archaeological surveys to evaluate the presence of culturally significant resources. These activities are essential for documenting environmental and historical conditions prior to any proposed development or infrastructure projects in Dawson County, Georgia. The work must be conducted in accordance with federal regulatory standards to ensure compliance and facilitate the permitting process. This is a subcontract opportunity posted by the Development Authority of Dawson County, with a response deadline of September 7, 2026. The North American Industry Classification System code 541620 indicates the work falls under environmental consulting services. The performance location is within Georgia, though specific site details are not provided. Interested parties must submit proposals by the stated deadline to be considered, and all activities are intended to support regulatory compliance and due diligence for future development initiatives in the region.
Development Authority of Dawson County

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Environmental Compliance and Historic Site ProtectionThe contract requires full compliance with federal regulations concerning the protection, evaluation, and restoration of historic or prehistoric sites that may be affected by project activities. This subcontract, categorized under NAICS code 541620, mandates that all work be conducted in accordance with established standards to preserve cultural resources, ensuring that any disturbance to significant sites is properly assessed, mitigated, and, where necessary, restored. The awardee must implement measures to identify, document, and safeguard these sites throughout the duration of the project, with specific attention to regulatory frameworks governing federal lands and federally funded initiatives. The solicitation was posted on August 7, 2026, with responses due by August 25, 2026, and is issued by the Utah agency under the Utah state designation. Although specific location details for performance or contact are not provided, the scope of work is tied to any project activity within Utah that impacts historic or prehistoric resources. The obligation extends beyond mere monitoring to include proactive evaluation and, when appropriate, restoration protocols that align with federal preservation mandates. Contractors must demonstrate proven experience and technical capability in cultural resource management to meet the stringent requirements of this agreement.
Utah

POSTED

about 20 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541620
New
SLED
Environmental Compliance and MonitoringThe contract involves comprehensive environmental compliance and monitoring services focused on stormwater management, erosion control oversight, and regulatory reporting throughout the construction phase. The work is tied to a project under the Haralson County School District in Georgia and requires adherence to established environmental regulations, ensuring that construction activities do not negatively impact surrounding ecosystems or water resources. The contractor will be responsible for implementing and maintaining effective erosion and sediment control measures, conducting regular site inspections, documenting compliance efforts, and submitting required reports to regulatory authorities as needed. This subcontract is categorized under NAICS code 541620, which corresponds to environmental consulting services, indicating a professional scope centered on technical environmental management rather than physical construction. The solicitation was posted on August 7, 2026, with a response deadline set for September 9, 2026, providing interested parties a limited window to submit proposals. Performance is expected to occur in Georgia under the jurisdiction of the Haralson County School District, though specific site locations are not detailed in the provided data. The contract emphasizes continuous regulatory alignment and accurate documentation, making it critical that the selected vendor has demonstrated expertise in environmental monitoring and compliance reporting within construction environments.
Haralson County School District

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details