Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 6, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Plasma Cutter Exhaust

Closed
FA4819-18-Q-3049Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333515
New
Federal
Zoller Power Shrink 600
Solicitation # RFQ509170
The Department of Energy, through the Oak Ridge National Laboratory, is soliciting firm fixed price quotations for the procurement of one Zoller Power Shrink 600 inductive high-end heat-shrink system or a domestic equivalent. This system is designed for HM and HSS tools with diameters from 3 mm to 32 mm and a maximum shrinkable tool length of 600 mm. The procurement includes a 12.5 inch TFT color monitor with pilot operating software, an ergonomic machine table, a 14/22kVA induction heat-shrink system, a liteSet length adjustment system, and a toolEx unclamping fixture. Additional requirements include a 480 V 3-/PE mains adaptor, shielding disc sets, and digital user manuals. Award will be based on the lowest priced, technically acceptable proposal. Offerors must provide a firm fixed price quotation and a proposed delivery schedule. Technical compliance requires that shrink fit chucks adhere to the DIN 69882-8 standard and that electrical equipment be NRTL listed or field evaluated by an OSHA recognized laboratory. The contract incorporates various federal regulations, including Buy American preferences, NIST SP 800-171 cybersecurity standards, and DOE-STD-1090-2020 for hoisting and rigging. Payments are processed via electronic funds transfer with net 30 day terms. All responses must be submitted by the deadline of October 28, 2026.
Ornl Ut-Battelle Llc-Doe Contractor

POSTED

4 days ago

DEADLINE

in 8 days

General Info

Contract Value

$12,480

NAICS

333515 - Cutting Tool and Machine Tool Accessory Manufacturing

Place of Performance

Tyndall AFB, PANAMA CITY, FL, 32403, USA

Set-Aside

SBA

Award Issued Date

Documents

1

RFQ.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4819 325 Cons Pkp
Contacts1 person available
OfficeTYNDALL AFB, FL, 32403, USA
Office AddressTYNDALL AFB, FL, 32403, USA
Contacts
KamaraContracting Specialist

Full Description

Show more
STATEMENT OF WORK 1. DESCRIPTION OF SERVICES The contractor shall provide all equipment, materials, transportation, shipping and labor required to fabricate and install an Zoned Down Draft table to replace the current table and associated exhaust and filter system for the Aviator XL and 200-Amp Plasma system. The current plasma table will be replaced with the new table and all the associated equipment (cutter, rails, etc.) will be installed on the new table as part of the contractor's installation. 2. WORK REQUIREMENTS 2.1 Plasma Table and Exhaust. The system shall include the following: Zoned Down Draft Table to fit existing Aviator XL and 200-Amp Plasma Cutter System at Tyndall AFB FL. -Zoned Down-Draft Plasma Cutter table specifically used with the Farr Model G-6 Exhaust System -A-36, 3/16" Hot Rolled Steel Construction, Walls and Interior -A500 Grade B, 3" x 1/4" Square Tube Base Frame and Slat Support -Overall Dimensions 82" W x 160"" L x 28" H -Cutting Surface 78" W x 156" L, 28" Slat Height -5 Cutting Zones on 30" Centers -Mechanically Actuated Dampers -Mechanical Ram for Master Side End Truck Included -Slag Pans 20" x 31.5" 3/16" A36 Hot Rolled Steel -Material Support: 3/16" x 3" A36 steel slats on 4" centers Farr Model GS-6 Exhaust System (no substitutions) - Fully assembled/pre-wired 10 HP Fan, 3000 CFM, controls, filters and cleaning system - Integrated Timer Controller - Compressed Air Regulator - Staggered channel inlet baffle - GS-6 Hemi-Pleat cartridge system (1,950 square feet media) - Automatic reverse-pulse cleaning system for extended cartridge life - Factory installed sprinkler head nozzles - Single Inlet Spark Baffle - 10" drum cover kits (Includes 55 Gal drum) - Easy-open access door to cartridges - Tool-less cam-lock cartridge removal Bolt-on HEPA Filtering System - For Filtering Hexavalent Chromium produced from Stainless Steel Cutting - No Additional System Required - HEPA grade filters - Installed from Factory GSP Package Upgrade - Plug Fan Blower Upgrade - Controls Upgrade - Inlet Damper - Installed from Factory Removable Slag Pan - Lift out pans for easy cleaning 2.2 On-Site Installation, Startup and Training The contractor will remove and replace the current plasma table with the new zoned table. All the associated equipment (cutter, rails, etc.) from the old table will be installed on the new table as part of the installation. The plasma cutter system after accessories are reinstalled and the associated exhaust system will be tested to determine that it is working correctly by performing an actual cutting operation in the presence of assigned personnel and the installation contractor verifying that the plasma cutter is operational and that the exhaust system vents the fumes outside the facility. . The contractor will perform the complete assembly of Exhaust System, HEPA Filter, etc. -The contractor shall utilize qualified installers. INSTALLER(S) MUST BE CERTIFIED by the manufacture of the equipment that they are authorized dealers/installers so that the manufacture warranties are not voided and the equipment is installed correctly. -The contractor shall perform initial exhaust startup and training. -The contractor shall provide a Startup checklist. 2.3 The contractor shall provide the necessary drawings and specifications (e.g. duct size etc.) to the government prior to installers' arrival to ensure the government provided items referenced below are installed correctly and that the appropriate rigging/lifting equipment is available. The government shall provide the following: - 460V-3-60 and required input for motor to Control Box - 110-1-60 lines from Control Box to Solenoids - 100 PSI Compressed Air to Collector Header - Water line to sprinkler head - Rigging/Lifting equipment for Table and Collector - Ducting for the exhaust system 3. WARRANTY At a minimum, the contractor shall provide a 1-year warranty in accordance with standard commercial practice. 4. GENERAL INFORMATION 4.1 Security Requirements The contractor shall ensure the following pass and identification items required for contract performance are obtained for employees and non-government owned vehicles: 4.1.1. Suitability Investigations: In accordance with AFI 31-101, Personnel working in a government facility 6 months or less or working anywhere on Tyndall AFB property are required to have a Local Files Check. The requiring activities Unit Security Manager will coordinate the Background Affidavit (with Pass & ID) and the DD 1172 Base Access Request form - allow 3-5 day process time. 4.1.2. Pass and Identification Items: The contractor shall ensure the following pass and identification items required for contract performance are obtained for employees and non-government owned vehicles: AF Form 75, Visitor/Vehicle Pass (AFI 31-204): The Service Provider shall adhere to local security policy when appling for short/long term visitors' passes. Any contractor requesting a pass for more than 3 days will complete a Local Files Check with 325 SFS/Pass & ID. 4.5. TRAFFIC LAWS. The contractor and its employees shall comply with base and local traffic regulations. 4.6. HOURS OF OPERATION. The contractor shall perform the services required under this contract during the following hours: Monday through Friday, 0730 to 1600 Local Time. The contractor may work, with prior approval of the Contracting Officer, extended hours and/or weekends to ensure timely completion of work at no additional cost to the government. 4.7. RECOGNIZED HOLIDAYS. The contractor is not required to provide service on the following days: New Year's Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day and Christmas Day. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday. 4.8. UTILITIES. The Government will furnish electricity, water, and sewage as necessary for accomplishment of work in accordance with this contract. All facilities do not receive the same utility services. The Contractor shall not change or modify any utility system or component; or connect any Contractor property, equipment or system without prior CO review and approval. The contractor shall practice energy conservation in the Government provided facilities. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities which include the following: 4.8.1. Lights shall be used only in areas where and when work is actually being performed. 4.8.2. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized. 4.8.3. Water faucets or valves shall be turned off after the required use has been accomplished. 4.9. ENVIRONMENTAL LAWS & REGULATIONS. The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost as a result of the change, the contractor shall inform the Contracting Officer pursuant to notice requirements and negotiate a modification to the contract. 4.9.1. The CO shall approve all hazardous materials brought on-site by the contractor prior to use. The contractor shall obtain approval using the application requirements of the AF Form 3952. Once the process is implemented and contractor is trained, the contractor may submit the AF Form 3952 electronically. The CO has the right to prohibit the use of hazardous materials it deems to be especially hazardous to human health and environment. In the event the CO does not approve a hazardous material for use, the CO may provide the contractor a list of suitable substitutes; however, the contractor shall retain responsibility for finding an acceptable substitute. The contractor shall take appropriate actions to comply with waste minimization and pollution prevention practices and policies. 4.9.2. Spill Controls. The contractor shall maintain spill control material on hand at all times sufficient to contain a worse case spill, both volume and hazard level. 4.9.3 Hazardous Materials Inventory: The contractor shall maintain an up-to-date hazardous material inventory with copies of MSDS(s) for all materials used on the job site. The contractor shall maintain a complete copy of all approved MSDS and AF Form 3952s. 4.9.4 Hazardous Materials Management: The contractor shall remove all hazardous materials by the end of each workday. Contractor shall not conduct process treatments (e.g. paint thinner solvent recycling) on base. 4.10. SAFETY REQUIREMENTS. In performing work under this contract, the contractor shall: 4.10.1. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work. 4.10.2. Take such additional immediate precautions as the contracting officer may reasonably require for safety and mishap prevention purposes 4.10.3. Record and report promptly (within 24 hours) to the contracting officer or designated government representative (GR), all available facts relating to each instance of damage to government property or injury to either contractor or government personnel. 4.10.4. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer. 4.10.5. If the government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed. 4.11. Publications. Publications can be accessed on-line at http://www.e-publishing.af.mil/. Supplements or amendments to listed publication from any organizational level may be issued during the life of the contract. 4.11.1. Compliance with all publications, regulations and operating instructions provided by the Government is required when: 4.11.2. They pertain to the procedures for materials expediting herein and where the contractor is authorized by the statement of work to accomplish the work specified in the publication, regulation or operating instructions. 4.11.3. The publications prescribe USAF policies, use of materials, procedures and processes applicable to the work requirements. The contractor is required to acquire and work on the latest version of the publication. 5. PERIOD OF PERFORMANCE The contractor shall complete all requirements of this Statement of Work within 6 months of contract award. 6. DELIVERY. The contractor shall ensure delivery uses a truck with a lift gate. Deliver to AFCEC/CXA Attn: Mike Mifsud 104 Research Road, Bldg 9738 Tyndall AFB FL 32403

More opportunities from Department Of Defense → FA4819 325 Cons Pkp

Same awarding agency

NAICS: 561210
Federal
TYNDALL AFB - RANGE AND OPERATIONS SUPPORT (RAOS)
Solicitation # FA481927CY001
Tyndall Air Force Base is conducting market research via a Sources Sought Notice to identify qualified 8(a) small business concerns for Range and Operations Support (RAOS) under NAICS code 561210. The anticipated acquisition will be a competitive 8(a) set-aside. Interested firms must provide a capability statement including company details, UEI, CAGE code, 8(a) eligibility, and relevant experience performing work of similar size and complexity. The response deadline for this market research is October 22, 2026. The scope of work involves providing technical services and labor support to maintain and operate test ranges for the Air Force Civil Engineer Center at Tyndall AFB, Florida. Key responsibilities include the operational capability of the Materials Testing Systems laboratory, In-Door Ballistic range, Fire Training and Test Facility, and Sky X range to support research, development, test and evaluation, and technology transition testing. The contractor will be required to manage vehicles, equipment, and facilities, while adhering to Air Force standards and explosive safety regulations. Administrative requirements include invoicing through the Wide Area Workflow system and maintaining a Purchase Expense Spreadsheet. Personnel requiring access to classified information must hold at least a Secret clearance and comply with specific cybersecurity mandates, including DAFMAN 17-1301 and AFI 17-130. The contractor must provide a part-time on-site contract lead and ensure all staff complete mandatory Total Force Awareness Training. Performance is primarily on-site at government installations during normal operating hours of 6:00 AM to 5:00 PM Central Time.
Facilities Support Services

POSTED

14 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS