Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Georgia was posted on June 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Playground Addition

Closed
PE-55115-NONST-2026-000000012State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is serving as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, with an estimated bid value of 19,300,000.00 dollars. The project scope involves the design and removal of existing trailer-mounted electrodialysis reversal, slab-mounted membrane filtration, and reverse osmosis units at the South Bay Water Reclamation Plant. These will be replaced with new slab-mounted membrane filtration and reverse osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, has a submission deadline of August 27, 2026, by 2:00 PM PT. Garney Pacific is actively seeking subcontractors for various trades, including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes the inclusion of SLBE and ELBE firms, as well as those with DBE, MBE, WBE, or SBE certifications. All subcontractors are required to utilize union labor and must be prepared to provide a 100% payment and performance bond from a US Treasury listed surety company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract forms, and the project is open to various small business set-asides, including SDB, WOSB, HUBZone, and SDVOSB certifications.
Garney Pacific, Inc.

POSTED

about 8 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Academy for Classical Education Inc. is soliciting proposals for the Playground Addition project at its campus located at 5665 New Forsyth Road, Macon, Georgia, aiming to transform an underutilized area into a cohesive outdoor learning and recreation space serving students, faculty, and visitors. The project involves comprehensive site improvements including earthwork and grading to create a unified upper terrace, a central covered pavilion with restroom facilities, new architectural retaining walls with brick veneer and ornamental metal fencing, landscaped lawns, concrete walks, turf play areas, playground safety surfacing, drainage systems, utilities, and supporting infrastructure. The construction will be managed under a Construction Manager at Risk (CM@R) model using the AIA 133 Agreement, with the CM@R responsible for all design coordination, permitting, and construction execution while coordinating closely with the Owner’s vendor responsible for supplying and installing all playground equipment. The project must be completed on an active campus, necessitating strict adherence to student and staff safety protocols throughout all phases of work. Proposals must be submitted by 3:00 pm on July 3, 2026, in three identical loose-leaf binders labeled appropriately and delivered physically to Carter Engineering Group in Macon, with an email copy sent afterward to the primary contact, Pat Kelly. Applicants are required to register by June 19, 2026, attend a mandatory pre-proposal meeting on June 12, and supply a completed AIA A305 Contractor’s Qualification Statement, E-Verify Affidavit, General Contractor and Business Licenses, project team resumes, surety letter confirming ability to provide 100% Performance and Payment Bonds, and insurance documentation. The evaluation is weighted toward relevant experience in school construction projects of similar scope, past performance in meeting budget and schedule targets, financial and personnel stability, and the quality of the proposed management plan covering cost control, scheduling, subcontractor utilization, safety, quality assurance, and closeout. General Conditions costs listed as Cost of Work will result in disqualification, and all labor rates must include actual salary plus burden. Insurance requirements are stringent, mandating $1 million general liability, $5 million umbrella coverage, $1 million auto liability, builder’s risk equal to the GMP, and employer’s liability at $1 million per incident. Bonds must cover 100% of the Guaranteed Maximum Price, and the successful bidder must swear under oath compliance with Georgia’s anti-competition statutes

General Info

Develop new Campus Commons, expanded playgrounds, and pavilion with restrooms in Macon, Georgia.

Agency

Georgia → Academy for Classical Education Inc.View Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(5)

ACE Playground RFP for Construction Manager at Risk Services

PDFrfp

Progress Set PDF carter eng

PDFother

2419 ACE Playground Architectural Drawings Proposal 6/5/26

PDFsow

ACE Schedule A Fee Schedule for ACE Playground Addition

XLSXfee-schedule

Street View Render.png

PNG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Academy for Classical Education Inc.
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → Academy for Classical Education Inc.
View Agency Profile
Office AddressN/A

Full Description

Show more
The Academy of Classical Education is undertaking the development of a new Campus Commons and Playground Expansion located at the front of its campus along New Forsyth Road in Macon, Georgia. The project is designed to transform an underutilized play area into a cohesive outdoor learning and recreation environment that serves students, faculty, and visitors while enhancing the overall appearance and functionality of the campus.
The development includes two age-appropriate playground areas connected by a central covered pavilion with restroom facilities. Significant site grading improvements will create a unified upper terrace, allowing the playground spaces, pavilion, and activity areas to function as an integrated campus destination.