Pleasant Spring Creek Streambank Stabilization (2025-04)
Awarded
2025-04State & Local
Submission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The Pleasant Spring Creek Streambank Stabilization project, Contract No. 2025-04, is a solicitation by Perkasie Borough in Bucks County, Pennsylvania, for bio-engineered stabilization of stream banks near Constitution Avenue and E. Spruce Street. The scope of work includes a base bid and two alternate bids covering the installation of geotextile soil wraps with brush layering, coir fiber logs, brush mattresses, and the grading of embankments using erosion control fabric and a mix of woody and herbaceous plants. Technical requirements encompass demolition, earthwork, finish grading, seeding, and exterior planting, with all work adhering to Chapter 105 regulations, Borough Standards, and PennDOT Publication 408.
Due to PA Fish and Boat Commission and PA Department of Environmental Protection mandates related to the Borough's MS4 Program, all in-stream work must occur between October 1 and May 15, with the entire project required to be completed between October 1 and December 31, 2025. Bids must be submitted electronically via PennBid by September 9, 2025, at 10:00 A.M. Requirements for bidders include a 10 percent bid bond, performance and payment bonds, and compliance with the Pennsylvania Prevailing Wage Act. The contract also specifies an 18-month warranty period for exterior plantings and strict adherence to project closeout procedures, including the submission of as-built documents and payroll certifications.
General Info
Perkasie Borough streambank stabilization project due September 9, 2025, for completion by December 2025.
HighAI Summary for Advertisement for Bids CN 2025-04: Pleasant Spring Creek Streambank Stabilization Project: The Borough of Perkasie is soliciting sealed bids for Contract 2025-04, the Pleasant Spring Creek Streambank Stabilization Project. The work involves bio-engineered stabilization using geotextile soil wraps, coir fiber logs, and planting. Bids are due by 10:00 A.M. on September 9, 2025, via PennBid. Requirements include a 10% bid bond, performance/payment bonds, and compliance with the Pennsylvania Prevailing Wage Act.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for Doc 00 41 00 Bid Form - EBID: A placeholder document for the Bid Form (Document 00 41 00), directing users to the PennBid website to locate the specific form associated with the contract.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Document 00 21 13 Instructions to Bidders: This document provides the formal Instructions to Bidders for a construction procurement. It outlines the rules for bid submission, bidder qualifications, site examination procedures, and the evaluation process for awarding the contract. It includes 31 articles covering topics such as bid security, liquidated damages, and government requirements.
PDF
PDF, High priority: read this firstsubmission-instructions
HighAI Summary for Instructions for Electronic Bidding - PennBid: This document provides detailed instructions for bidders on how to use the PennBid electronic bid management system to respond to a Request-for-Quotation. It covers registration, downloading documents, communicating via the system, and the step-by-step process for submitting and finalizing electronic bids. Additionally, it lists the specific required documents for submission, including the Bid Form, Bid Bond, Bidder's Acknowledgement, and Non-Collusion Affidavit.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for List of Drawings - Pleasant Spring Creek Rehabilitation: A list of drawing sheets for the Pleasant Spring Creek Rehabilitation project, referencing permit plans dated July 2, 2024, and last revised June 10, 2025, covering sheets 1-10.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Perkasie Borough Contract No. 2025-04 - Pleasant Spring Creek Streambank Stabilization Project TOC: Table of Contents for the Perkasie Borough Contract No. 2025-04 regarding the Pleasant Spring Creek Streambank Stabilization Project. The document outlines the procurement and contracting requirements (Division 00), general requirements (Division 01), and technical requirements (Divisions 2-35), including bid forms, bonds, and specific construction specifications for earthwork and landscaping.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Pleasant Spring Creek Streambank Stabilization Project Manual: Project manual for the Pleasant Spring Creek Streambank Stabilization Project (Contract No. 2025-04), prepared by Gilmore & Associates, Inc. for Perkasie Borough, dated August 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Pleasant Sprink Creek Plan Set (CN 2025-04): Technical drawings and plan set for the Pleasant Sprink Creek project (CN 2025-04), providing critical design specifications and visual requirements for the procurement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 60 00 - Material and Equipment: Technical specifications section 01 60 00 detailing requirements for the procurement, transportation, handling, storage, and protection of materials and equipment. It includes specific protocols for product substitutions and the submittal process for alternative manufacturers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 70 00 - Contract Closeout: Technical specifications section 01 70 00 detailing the requirements for contract closeout. It outlines procedures for final inspection, punchlist completion, final cleaning, the maintenance of project record documents (as-builts), and the submission of final documentation including payroll certifications and lien waivers required for final payment.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 71 13 Mobilization: Technical specifications for the mobilization phase of the project, detailing the assembly of facilities, permit acquisition, and the requirement for video and photographic documentation of existing roadway conditions. It specifies that mobilization is incidental to other work and will not be paid as a separate line item.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 02 41 16 - Demolition: Technical specifications for demolition work, including the removal of designated trees, protection of existing facilities, compliance with asbestos standards, and coordination with the Pennsylvania One Call System for underground utilities. It outlines requirements for site preparation, debris disposal, and clean-up.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 20 00 Earthwork Specifications: Technical specifications for Section 31 20 00 Earthwork, covering site grading, topsoil removal, excavation, and backfill. The document details quality assurance standards (PennDOT Publication 408, ASTM), material requirements for topsoil and fill, and specific compaction density requirements (90%-95% Modified Proctor) based on area classification.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 25 14.16 Jute Matting/ Erosion Control Blanket: Technical specifications for the furnishing and installation of biodegradable erosion control blankets, including jute netting and geotextile fabric. The document details material compositions, shipping and storage requirements, topsoil standards, and specific execution procedures for planting zone preparation and anchoring.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 92 00 - Finish Grading, Seeding, and Sodding: Technical specifications for finish grading, seeding, and sodding. The document details requirements for topsoil, fertilizer, lime, and seed mixtures, including quality assurance standards (PennDOT Publication 408), submittal requirements, and execution procedures for subgrade preparation and seeding.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 93 00 - Clearing: Technical specifications for Section 32 93 00 (Clearing), detailing requirements for clearing, grubbing, stripping and stockpiling topsoil, and debris disposal. It includes definitions of work, material requirements for temporary fencing and tree wound dressing, and execution procedures for utility relocations and site restoration.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 93 00 - Landscaping: Technical specifications for landscaping (Section 32 93 00), covering soil preparation, plant placement, seeding, and maintenance. It details quality control standards, including Pennsylvania DOT Publication 408, material requirements for grass and soil, and execution instructions for grading and seeding.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 93 02 - Exterior Planting: Technical specifications for Section 32 93 02 Exterior Planting, covering the installation, delivery, and maintenance of trees, shrubs, and ground covers. It includes detailed requirements for quality assurance, regulatory compliance (ANSI/USDA), soil composition, and an 18-month warranty period.
Ref. #: Perkasie Borough, Bucks County This contract includes a base bid and two alternate bids for the bio-engineered stabilization of stream banks along the Pleasant Spring Creek near the intersection of Constitution Avenue and E. Spruce Street in Perkasie Borough. The stabilization work will include the installation of geotextile soil wrap with brush layering, coir fiber logs and brush mattress along with the grading of embankments with erosion control fabric and a combination of woody and herbaceous plants. All material, labor, and equipment necessary shall be in accordance with Chapter 105 rules and regulations and Borough Standards. The PA Fish and Boat Commission requires all work done within the stream to be conducted between October 1 and May 15. Also, the PA Department of Environmental Protection is requiring the work to be completed prior to the end of 2025 as part of the Borough’s MS4 Program. Thus, the work shall be completed between October 1st and December 31st.