PLER2025-00142 Aquifer Storage and Recovery Project Vineyard Surface Water Treatment Plant

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sacramento County Water Agency is implementing the Aquifer Storage and Recovery Project at the Vineyard Surface Water Treatment Plant under solicitation PLER2025-00142. The project focuses on converting an inactive supply well, PW-1, into an ASR well, which includes the installation of a 100-horsepower pump, electrical controls, and 12-inch piping and valves to connect to the existing potable water system. Future expansions involve the construction of four additional ASR wells and the conversion of three active Excelsior supply wells. The technical scope includes removing existing pumps, conducting pre- and post-rehabilitation downhole video surveys, cleaning well screens and filter packs to remove sediment and biomatter, and reconfiguring above-ground pipelines to incorporate a backflushing loop. The project is governed by a Mitigated Negative Declaration, concluding that the work will not have a significant environmental impact, provided it adheres to the California Environmental Quality Act and Sacramento Metropolitan Air Quality Management District standards. Key operational timelines for pump installation, piping, and surface restoration are scheduled between July 2026 and October 2027. Special requirements include strict protocols for the discovery of human or Native American remains and compliance with EPA and CARB air quality standards. The project is managed by the Sacramento County Water Agency with primary coordination through the Environmental Coordinator and Director of Water Resources.

General Info

Sacramento County Water Agency converting wells for Aquifer Storage and Recovery project through 2027.

Agency

California → Sacramento County

Place of Performance

Florin Road, Knox Road, Excelsior Road, CA, 95641

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Sacramento County
Office AddressN/A
Contacts
Matt SatowDirector of Water Resources
Julie NewtonEnvironmental Coordinator
Rodney FrickeSenior Hydrogeologist

Interested Companies (1)

GEI ConsultantsGolden, Colorado

Full Description

Show more
Sacramento County Water Agency (SCWA) proposes to convert an inactive supply well (PW-1) at the Vineyard Surface Water Treatment Plant into an Aquifer Storage and Recovery (ASR) well and construct associated conveyance pipelines. The work includes installing a permanent 100-horsepower pump, electrical controls, and 12-inch piping and valves connecting to the existing potable water system. SCWA also plans four future ASR wells, associated pipelines, and the conversion of three active Excelsior supply wells to ASR. ASR implementation would involve removing the existing pump, performing pre- and post-rehabilitation downhole video surveys, cleaning the well screen and filter pack to remove scaling, biomatter, and sediment, and reinstalling the pump with an ASR valve. The existing above-ground pipeline would be reconfigured to include a backflushing loop.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves comprehensive infrastructure upgrades for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant improvements to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. The project estimate is 16,690,000 dollars, and the contract will be awarded to the responsible bidder submitting the lowest responsive bid. The procurement process requires bidders to submit a signed bid form, a bid bond, evidence of authority to sign, and MWBE documentation, including a Good Faith Efforts Form and Table A. The contract is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance from the successful contractor. Performance is measured against strict technical standards, including AWS, SMACNA, NEMA, and ASTM specifications. Payments are processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran, service-disabled veteran, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as the installation of site electrical, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with adherence to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Key requirements include the provision of performance and payment bonds equal to 100 percent of the contract amount, compliance with Davis-Bacon wage determinations, and adherence to OSHA and ADA standards. Bidders must provide a Quality Management Plan, a Timeliness Tracking Plan, and at least three references for similar projects.
WG Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS