Pocket Road Sewer Replacement at East Shore Project (X14120309)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pocket Road Sewer Replacement at East Shore Project (X14120309) is a forecast procurement by the City of Sacramento to improve roadway safety and maintain the reliability of the Department of Utilities wastewater infrastructure. The project is located at the intersection of Pocket Road and East Shore Drive in Sacramento, California. The primary objective is to address a roadway depression caused by a base settlement failure at Manhole 707UU12, which has allowed groundwater to infiltrate the system and caused adjacent sewer piping to settle. The scope of work involves the removal and replacement of Manhole 707UU12 and approximately 50 linear feet of 21-inch sewer pipe. Required activities include dewatering, excavation, backfill, and surface restoration. The project is classified under NAICS code 237110 and has been deemed exempt under California Environmental Quality Act classes 15301 and 15302, as it involves minor alterations and the replacement of existing structures with no significant environmental impact. The forecast was posted on June 22, 2026.

General Info

Replace failing manhole and 50 feet of sewer pipe at Pocket and East Shore Drive to fix depression and ensure safety.

Agency

California → City of Sacramento

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Sacramento, CA, 95831

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Pocket Road Sewer Replacement at East Shore Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Sacramento
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Sacramento
Office AddressN/A
Contacts
Charles TschudinSenior Planner
Angelo VasquezAssistant Civil Engineer

Full Description

Show more
The project would improve safety along a section of a roadway at the intersection of Pocket Road and East Shore Drive and maintain reliability of DOU's wastewater infrastructure. A roadway depression was discovered at the intersection of Pocket Road and East Shore Road. City crews performed a video review of the sewer main and found that Manhole 707UU12 is currently dealing with a failure in which the base has settled, causing groundwater to infiltrate into the manhole. Additionally, the adjacent sewer piping is settling and will be repaired. The project will remove and replace the existing manhole and approximately 50 linear feet of 21-inch sewer pipe. This project will also include dewatering, excavation, backfill, and surface restoration.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 5 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. is actively encouraging M/W/DBE participation and offers assistance with bonding, insurance, and lines of credit to eligible subcontractors. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 5 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS