Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from General Services Administration was posted on March 20, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Point Roberts Roof Replacement

Awarded
47PL0120R0019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 1 hour ago

DEADLINE

in 4 days
NAICS: 238160
New
SLED
Request for Qualifications for Trade Contractors for 158 Spring Street - ROOFING AND FLASHING ONLY
Solicitation # COC-RFQ-FY27-31162RF
The City of Cambridge is seeking prequalified Trade Contractors for roofing and flashing services as part of a comprehensive renovation of the former Kennedy-Longfellow School, a 101,590 square foot structure located at 158 Spring Street. This procurement is conducted under M.G.L. c.149A Construction Management at Risk, with the specific roofing and flashing trade estimated at 55,571.00 dollars. The overall project duration is approximately 12 months from the notice to proceed. The selection process consists of two phases, beginning with a prequalification phase where firms must submit a Statement of Qualifications (SOQ) via the City's e-Procurement Portal by November 12, 2026. To be eligible for the subsequent bidding phase, firms must achieve a minimum total score of 70 points, with specific minimums required in references and project capacity categories. Mandatory requirements include a valid DCAMM Sub-bidder Certificate of Eligibility, a commitment letter for payment and performance bonds at 110 percent of the estimated contract value, and a 10-hour OSHA-approved safety certification. Applicants must submit a comprehensive package including Trade RFQ Form 1 prior to the SOQ application, along with various schedules detailing business ownership, management personnel, five years of similar project experience, and a three-year workers compensation modifier history. Additional compliance mandates include adherence to the Cambridge Employment Plan, the Responsible Employer Plan, the Living Wage Ordinance, and Minority Business Enterprise programs. All submissions must be electronically filed, and any packages received after the deadline will be rejected.
Capital Buildings Projects

POSTED

about 5 hours ago

DEADLINE

in 14 days
NAICS: 238160
New
SLED
47971 CONSTRUCTION
Solicitation # 47971 - C
Solicitation 47971-C is a construction project issued by the New York State OGS Design and Construction for the replacement of the roof and associated mechanical systems at the Troop F Headquarters in Middletown, New York. The scope of work encompasses comprehensive architectural, electrical, and structural modifications, including the removal of specific skylights and roof framing, the application of various waterproof and general surface finishes, and abatement work related to the first-floor reflected ceiling plan. Electrical requirements include the installation of keyed systems, the relocation of equipment for HVAC engineers, and the installation of permanent conductive fiber optic cables. The contractor is responsible for providing all necessary tools, equipment, and materials, as well as procuring all permits required for the final certificate of occupancy. All work must adhere to applicable building codes, local safety and zone differential regulations, and manufacturer recommendations. Key deliverables include the final inspection of roof trusses, sheathing, tiles, gutters, downspouts, and storm drainage systems, with final acceptance of the fastening system requiring written approval from the Owner and Architect. The solicitation was posted on October 16, 2026, with a response deadline of November 18, 2026.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 7 hours ago

DEADLINE

in 20 days

General Info

Contract Value

$784,322.26

NAICS

238160 - Roofing Contractors

Place of Performance

Point Roberts, WA, 98281, USA

Set-Aside

SBA

Award Issued Date

Documents

2

Industry+Outreach+Questionnaire.docx

DOCX

SOW+-+Point+Roberts+Roof+Replacement.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Sources Sought

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R10 Construction Acquisitions Branch
Contacts2 people available
OfficeTacoma, WA, 98401, USA

Full Description

Show more
Source Sought Notice Point Roberts LPOE Roof Replacement - Sources Sought The purpose of this Sources Sought notice is to determine availability and capability of qualified Small Businesses, Service Disabled Veteran Owned Small Businesses, Woman Owned Small Businesses, or HUBZone small businesses. This notice does not preclude a large business from submitting their capabilities statement and interest to the project. Responses to this notice will be used for informational and planning purposes only and shall not be construed as a solicitation or as an obligation or commitment by the Government. This notice is intended strictly for market research. This procurement will be advertised under North American Industrial Classification System (NAICS) code 238160 - Roofing Contractors. The small business size standard for NAICS code 238160 is $16.5M in average annual receipts over the past three (3) years. General Information The Point Roberts LPOE (Land Port of Entry) is located at: 50 Tyee Dr. Point Roberts, WA 98281. Due to the geographical location of the Point Roberts LOPE, the Contractor shall possess Government issued photo identification such as U.S. Passport, U.S. Passport Card, Enhanced Driver's License, or NEXUS Card in order to cross the U.S. and Canada border Scope Summary Land Port of Entry (LPOE) operates 24 hours a day and processes travelers entering the U.S. from Canada. Water has been leaking into the occupied space and the roof is close to the end of its service life. The roofs to the south and west are sloped towards the building. Gutters were constructed to collect the water, but we suspect that the standard flashing details were not designed to account for the reverse slope of the roof. The west roof has wide flashing caps which may direct water towards the interior of the building. The scope of this project is limited to redesign, remove and replace the existing standing seem metal and membrane roofing over the main building. Work may include removing the existing skylights, gutters and flashing. Pay special attention to the locations where beams, slabs, columns, gutters and roofs overlap in the middle of the building. The roof over the inspection lanes to the south does not require replacement at this time. Additional information shall be provided during Pre-solicitation and Solicitation Phases. Design: Locate all existing roof leaks and verify with testing to confirm. Design new metal roofing and all flashing details for the main building. Retrofit structure to support roofing where existing skylights are. New TPO roofing in the two mechanical areas. Re-design ceiling and lighting for the interior spaces that will be affected by removing the skylights. Preconstruction and Inspections: Preconstruction meeting. After design drawings have been accepted by GSA, coordinate and schedule a preconstruction meeting between GSA, Contractor and CBP to review installation procedures and coordinate the demolition and installation of the new roof. Initial inspection. Schedule inspection with GSA PM/COR when a representative sample of roofing, flashing etc. is scheduled to be installed to ensure that the installation is constructed per the design and manufacturers documents. Follow up Inspection. Periodic inspections may be conducted by GSA during construction Punch List Inspection. Performed punch list inspection with GSA, CBP and contractor when construction is substantially complete. Construction: Install roofing, ceiling and lighting per the accepted design documents. Minor mold remediation on the 2x6 studs directly below the parapet wall. Minimize impact on 24/7 CBP operations. Project Description & Approach The General Services Administration (GSA) intends to award a firm fixed-price, Design-Build contract for the Point Roberts LPOE Roof Replacement, located in Point Roberts, WA pursuant to Federal Acquisition Regulation (FAR) Best Value Design-Build Selection Procedures (FAR Subpart 15.3). The DB team will be selected through a best value selection process. During the development period from initial concept to final design the DB team will work in close consultation with GSA and stakeholders to ensure that all of the goals are addressed and that best value practices are utilized. GSA will provide technical documents to the interested vendors accompanying the solicitation documents. Design package shall include Scope of Work, Specifications, Roof Plans and any additional technical documents. Unique Situations/Risks The facility location, coupled with the need for continuous operation during construction, present unique challenges for the design/build teams on the project. Facility will remain fully occupied and operational during the entire project. Life safety of the tenants will be protected at all times. No adverse impact on tenant mission will be acceptable. Occupied Facility Construction The replacement of the TPO roof at the LPOE Point Roberts, WA must occur within an occupied, fully functional facility. These functions include typical office work, but also include services for the general public. This presents several challenges that will have to be addressed by the designer and/or design/build team. All work in public spaces will need to be completed during unoccupied periods. Setup, construction, and clean-up will need to occur on a daily basis. Responses Interested small business vendors in the categories listed above shall submit their capability statement electronically, limited to 10 double sided pages. The capability statement shall be in sufficient in detail to allow Government to determine the organization's related qualifications to perform the work. The statement shall include: 1. Company Identification a) Company name. b) CAGE code. c) DUNS number. d) Active SAM registration printout (www.beta.sam.gov). e) Size/number of employees. 2. A statement describing the company's interest in performing the work. 3. Organization chart to include both the design & construction team. 4. Capabilities and experience with federal projects in design build construction of a complete roof replacement in the $500K - $1M range. Submitted references should highlight recent and relevant design-build projects in fully occupied facilities within the past five (5) years. 5. Previous occupied facilities construction experience is essential. 6. Statement of capability to bond for a project in the $500K - $1M range. 7. Contact information, Point of contact name, Phone number, E-mail address and web address (if available). Companies providing above referenced material are requested to limit their submission to no more than 10 double-sided pages. Please review the attached Scope Questionnaire. This information provides industry knowledge to the Project Team. Any recommendations, comments should be included with your submission. Responses should be emailed not later than the date specified in this source sought notice as follows: contact@example.gov and contact@example.gov. Each response will be reviewed by the Contracting Officer for the purpose of determining whether there exists a reasonable expectation of obtaining a sufficient number of offers from qualified and responsible small business concerns. All information furnished to the Government in response to this notice will be used for review purposes only. All interested parties are required to respond to this sources sought announcement via email not later than 1:00 p.m. Pacific Time, April 3, 2020.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS