Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Kentucky was posted on July 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Polypropylene Barrier Wall Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 326199
New
DIBBS
TUBING, PLASTIC, SPIRAL
Solicitation # SPE8E5-26-T-4225
Solicitation SPE8E5-26-T-4225 is a request for quotations issued by DLA Troop Support for the procurement of 50 feet of black plastic spiral wrap tubing. The required material must have a nominal wall thickness of .042 inches and a nominal inner diameter of .58 inches, conforming to NSN 9330-01-669-7398 and basic CID A-A-59602. The procurement is not a small business set-aside, although a price evaluation preference is available for HUBZone small business concerns. Delivery is required within 167 days after order, with an original required delivery date of December 4, 2026, and a need ship date of March 1, 2027. Shipping is designated as FOB Origin under the First Destination Transportation program, with the delivery point located at DLA Distribution San Joaquin in Tracy, California. Inspection and acceptance will occur at the destination. Packaging must comply with MIL-STD-129 for marking and labeling, with non-hazardous materials following ASTM D3951 and hazardous materials adhering to TQ requirement IP025. Palletization must follow RP001. The contract incorporates the DLA Master List of Technical and Quality Requirements, including RA001, RP001, and RQ011. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and compliance with the Buy American Act and Berry Amendment. Quotes must be submitted via DIBBS.
DLA DIST SAN JOAQUIN

POSTED

about 21 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract calls for the supply of polypropylene barrier wall units meeting ASTM standards, featuring a 5 oz. material weight and a trapezoidal design with baffling installed at three-foot intervals. These units are intended for use in erosion control or temporary sediment diversion applications and must conform precisely to the specified material and geometric requirements to ensure performance under field conditions. The subcontract is issued by the Kentucky Transportation Cabinet Division of Maintenance under NAICS code 326199 for other plastic product manufacturing, with performance expected to occur across various locations within Kentucky, designated as Other for place of performance. The solicitation was posted on July 1, 2026, with proposals due by 5:30 PM Eastern Time on July 15, 2026. There is no set-aside designation specified, indicating the opportunity is open to all qualified vendors without preference for small, minority-owned, or other categories. Vendors must submit responses through the Kentucky Transportation Cabinet’s online procurement portal at the provided URL, ensuring all technical specifications and delivery terms are fully addressed. While no point of contact is listed, interested parties are expected to direct inquiries through the official website or established procurement channels outlined by the agency.

General Info

Supply polypropylene barrier wall units meeting ASTM standards for erosion control in Kentucky, due July 15, 2026.

Agency

Kentucky → KYTC-Div of MaintenanceView Agency

NAICS

326199 - All Other Plastics Product ManufacturingView NAICS

Place of Performance

Other, KY, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB 605 2600000683.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-605-2600000683-2 | Polypropylene Barrier Wall Construction Districts 11 and 12

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKentucky → KYTC-Div of Maintenance
ContactsNo contacts available
OfficeN/A
Organization / Agency
Kentucky → KYTC-Div of Maintenance
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of ASTM-compliant polypropylene barrier wall units with 5 oz. material weight, trapezoidal shape, and baffling every 3 feet.

More opportunities from Kentucky → KYTC-Div of Maintenance

Same awarding agency

NAICS: 237310
New
SLED
RFB-605-2700000077-3 | Bridge Maintenance & Repair-FHWA ER Eligible Districts 1-12
Solicitation # RFB 605 2700000077
The Kentucky Transportation Cabinet Division of Maintenance is soliciting bids under RFB-605-2700000077-3 for bridge maintenance and repair services eligible for FHWA Emergency Relief across Districts 1-12. This Indefinite Delivery/Indefinite Quantity contract is structured into three regional awards covering the Western Region (Districts 1-4), Central Region (Districts 5-8), and Eastern Region (Districts 9-12). To be considered for an award, bidders must provide pricing for all line items across all four districts within their chosen region. The work involves specialized preventive maintenance including bridge cleaning, concrete coatings, bearing lubrication, and rust removal, all performed according to 2026 Kentucky Transportation Cabinet standards. Bids must be submitted electronically through the Kentucky Vendor Self Service system by September 11, 2026, at 1:30 PM EST. Prospective vendors must meet prequalification E-1 requirements and submit all mandatory certificates and affidavits. The contract includes specific technical guidelines for construction methods and a standardized asphalt adjustment calculation formula for master agreements effective March 1, 2026, to account for material cost fluctuations. Primary contact for this solicitation is Allan Coldiron within the KYTC Division of Maintenance.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
New
SLED
RFB-605-2700000077-2 | Bridge Maintenance & Repair-FHWA ER Eligible Districts 1-12
Solicitation # RFB 605 2700000077
The Commonwealth of Kentucky, through the KYTC Division of Maintenance, has issued solicitation RFB-605-2700000077-2 for bridge maintenance and repair services eligible under FHWA Emergency Relief for Districts 1 through 12. This Indefinite Delivery/Indefinite Quantity contract is divided into three distinct regions: the Western Region covering Districts 1-4, the Central Region covering Districts 5-8, and the Eastern Region covering Districts 9-12. The agency intends to establish one master agreement per region, and prospective bidders must bid on all line items for all four districts within a region to be considered for an award. The response deadline is September 11, 2026, at 17:30, with all bids required to be submitted electronically via the Kentucky Vendor Self Service system. The scope of work encompasses a variety of construction materials and specialized services, including bridge cleaning, concrete coatings, bearing lubrication, and rust removal, all performed according to Kentucky Transportation Cabinet standards. Technical requirements specify detailed processes for debris removal, pressure washing, and the application of rust inhibitors and coatings. Financial and administrative components of the contract include the use of a specific asphalt adjustment calculation formula for 2026 master agreements to account for material price fluctuations. Bidders must provide mandatory certificates and affidavits as part of their submission to ensure compliance with state and federal regulations.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 8 days
View Details