Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Pond Berm Stabilization and Rock Armoring

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract titled Pond Berm Stabilization and Rock Armoring involves reinforcing the berms surrounding a pond through strategic rock placement and grading to mitigate erosion and ensure long-term structural stability following sediment removal activities. The work is aimed at preserving the integrity of the pond’s embankments by installing durable rock armor that resists water flow and prevents soil degradation, with grading tailored to promote proper drainage and reduce future sediment buildup. This effort is critical for maintaining ecological balance and structural safety in the area post-sediment clearance. The contract is classified as a subcontract under NAICS code 237300, which corresponds to water and wastewater construction, and is managed by the Fish and Wildlife, Region 3 - Bay Delta office in California. It was posted on June 5, 2026, and the performance location is tied to the agency’s operational area within the Bay Delta region, though specific city or zip details are not provided. The project is part of broader environmental maintenance initiatives by the agency to safeguard aquatic habitats and associated landforms, with all work requiring compliance with regional environmental standards and construction best practices for erosion control.

General Info

Rock armoring and grading to stabilize pond berms and prevent erosion in Bay Delta region.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Reinforce pond berms using rock placement and grading to prevent erosion and maintain structural integrity after sediment removal.

Similar Contracts

Same NAICS industry code

NAICS: 237300
SLED
Backfill Material Supply and PlacementThe contract involves the supply and placement of Class II/III backfill material for structural and drainage components, with required compaction testing to ensure proper engineering standards are met. This subcontract is tied to infrastructure work under the NAICS code 237300, indicating it relates to heavy and civil engineering construction, specifically supporting energy and environmental projects managed by the Kentucky Energy & Environment Cabinet. The material must be delivered and properly installed to meet technical specifications for load-bearing and drainage functionality, and all placement activities will be subject to verification through compaction testing protocols. The solicitation was posted on July 7, 2026, with a response deadline of August 11, 2026, at 1:30 PM. The place of performance is listed as “Other,” suggesting work may occur at multiple unspecified locations within Kentucky under the agency’s jurisdiction. No set-aside type is specified, meaning the contract is open to all eligible subcontractors. All bids and submissions must be submitted through the Kentucky VSS portal, and contractors are expected to comply with state engineering and environmental regulations governing backfill material quality, handling, and testing. Failure to meet compaction requirements or material specifications may result in rejection or cost recovery.
Energy & Environment Cabinet

POSTED

16 days ago

DEADLINE

in 20 days
View Details