Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 26, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Poplar Island Spillway # 1 Modification

Awarded
W912DR-16-B-0013Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 13 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Poplar Island Spillway 1 Modification is a construction project managed by the Department of Defense through the US Army Corps of Engineers Baltimore District as part of the Paul S. Sarbanes Ecosystem Restoration Project in Talbot County, Maryland. This solicitation, identified as W912DR-16-B-0013, is designated as a 100 percent small business set-aside under NAICS code 237990. The scope of work involves the modification of Spillway 1, which includes slip lining discharge pipes, the demolition of existing steel structures, and the plugging of abandoned spillway pipes 3, 7, and 10. The project requires adherence to detailed construction specifications covering concrete, metals, utilities, and marine construction, with a performance period of 180 calendar days. Contractors are required to coordinate closely with the USACE and the Maryland Environmental Service. Administrative requirements include strict guidelines for submittals, progress scheduling, and payment terms, supported by a comprehensive set of civil, geotechnical, structural, and mechanical technical drawings.

General Info

Contract Value

$896,400

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Poplar Island, MD, USA

Set-Aside

NONE

Award Issued Date

Documents

3

Paul S. Sarbanes Ecosystem Restoration Project - Spillway 1 Modification Plans

PDF, High priority: read this firstspecifications
High

Spillway 1 Modification Construction Specifications - Poplar Island

PDF, High priority: read this firstspecifications
High

W912DR-16-B-0013 Poplar Island Spillway #1 Modification

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

8 updates
PhaseAwarded
Posted

Sources Sought

Notice updated

Response deadline changed from Dec 8, 2015 to Dec 21, 2015. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Sources Sought → Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Baltimore
Contacts1 person available
OfficeBALTIMORE, MD, 21201-2526, USA
Office AddressBALTIMORE, MD, 21201-2526, USA

Full Description

Show more
SOURCE SOUGHT SYNOPSIS Poplar Island Spillway #1 Modification Chesapeake Bay between Jefferson and Coaches Islands W912DR-16-B-0013 This is a SOURCES SOUGHT SYNOPSIS ANNOUNCEMENT ONLY. This synopsis is market research tool being utilized for information from industry, which will be used for preliminary planning purposes. Only firms who respond to this announcement by submitting the requested information will be used in determining whether to set-aside this requirement. Please do not respond to this notice unless you intend to submit an offer when the official solicitation is released. NO proposals are being requested or accepted with this synopsis. THIS IS NOT A SOLICITATION FOR PROPOSALS, QUOTATIONS, OR BIDS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. Responses in any form are not offers. The Government is under no obligation to issue a solicitation as a result of this announcement. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought announcement or any follow-up information. No telephone calls will be accepted requesting a bid package or solicitation. Respondents will not be notified of the results of this synopsis. At this time, a SOLICITATION DOES NOT exist. The U.S. Corps of Engineers - Baltimore District is seeking sources for a construction project entitled, Spillway #1 Modifications. This will be a firm-fixed price construction contract. The place of performance is at Poplar Island. Construction magnitude is between $500,000 and $1,000,000. The anticipated North Industry Classification System (NAICS) for this requirement is 237990 (Other Heavy and Civil Engineering Construction) and Business Size Standard of $33.5 Million. Responses to this announcement are due not later than 10:00 A.M. EST, Tuesday,08 December 2015. The intent of this notice is to assess industry's small business concerns, including SBA Certified 8(a) Firms, Small Disadvantaged Business (SDB), Historically Underutilized Business Zone (HUBZone), Veteran-Owned Small Business (VOSB), Service-Disabled Veteran-Owned Small Business (SDVOSB), Woman Owned Small Business (WOSB), and Economically Disadvantaged Women-Owned Small Business (EDWOSB), capability and interest in performing this requirement. The Government must ensure there is adequate competition among the potential pool of responsible contractors. Small business, Certified 8(a), HUBZone and SDVOSB businesses are highly encouraged to participate. Be advised that this requirement may be canceled or revised at any time during solicitation, selection, evaluation, negotiation, and award. In addition, no projects are yet authorized and no funds are presently available for this requirement. To be eligible for contract award, a firm must be registered in the Government's System for Award Management (SAM) website: https://www.sam.gov/portal/SAM/#1 PROJECT DESCRIPTION: Poplar Island is located approximately 20 minutes (by boat) northwest of Tilghman Island. Poplar Island is located in the Chesapeake Bay between Jefferson and Coaches Islands. All the construction will be on Poplar Island. The purpose for this contract is to modify an existing spillway structure at Poplar Island and plug several abandoned spillway pipes. The scope includes: 1. Modifications to Spillway # 1: a. Raising the existing structure, b. Slip lining the existing discharge pipes, c. Demolition of two (2) existing steel structures d. Cap (seal) the T-weir pipe connecting to Spillway #1 2. Plugging (filling in and capping) of three (3) existing spillway structures: #3, #7, and #10. GOVERNMENT SUPPLIED MATERIALS: The Government will supply the constructions plans and specifications. PROJECT ASSUMPTIONS: Contractor is required to supply all costs, materials and transportation to complete the construction of the Government furnished plans and specifications. CONTRACT DELIVERABLE: The Contractor shall provide a completed project per the constructions plans and specifications. PERIOD OF PERFORMANCE: The construction duration will be approximately 150 calendar days. INTERESTED SOURCES: Interested sources must submit a narrative demonstrating their qualifications to perform work as described above. The narrative shall include a summary of qualifications, details of similar work experience, including dates of performance and references with contact information. Contractors should present and identify all expertise, types and number of equipment, bonding limit, and name and number of personnel. The Contractor must have access to equipment to perform the work they will perform, and should describe the elements of work they would likely self-perform. The Contractor should be familiar with the Federal safety manual and provisions of the Davis-Bacon Act. Narrative shall be no longer than 10 pages. Comments will be shared with the Government and the Project Management Team (PMT), but otherwise be held in strict confidence. SUBMISSIONS: Must submit the following at a minimum: 1. Company name, address, phone number, and email address for a point of contact. 2. Company's CAGE Code and DUNS Number to verify your business status as a qualified Small Business, Small Disadvantaged Business, Service Disabled Veteran Owned SB (SDVOSB), Veteran Owned Small Business (VOSB), Historically Underutilized Business Zones (HUBZone), Certified 8(a) or Women- Owned Small Business (WOSB. 3. Indicate the primary nature of your business. 4. What percentage of work can you perform with your equipment? 5. A letter from the surety regarding the bonding capability for a single contract action and aggregate of the interested small business prime contractor. 6. Email responses are required. Interested Firm's shall respond to this Sources Sought Synopsis no later than 10:00 A.M. EST on 08 December 2015. All interested firms must register in the System for Award Management (SAM) to be eligible for award of Government contracts. Please see www.sam.gov for additional registration information. Email your response to Sharla Andrews, contact@example.gov.

More opportunities from Department Of Defense → W2SD Endist Baltimore

Same awarding agency

NAICS: 237990
New
Federal
Mid-Bay James Island Restoration Phase 2
Solicitation # W912DR27BA001
Solicitation W912DR27BA001 is a Firm Fixed Price construction contract issued by the U.S. Army Corps of Engineers, Baltimore District, for Phase 2 of the Mid-Chesapeake Bay Island Ecosystem Restoration project at James Island in Dorchester County, Maryland. The project, with an estimated value between 150 million and 250 million dollars, involves complex restoration work in a remote location accessible only by boat. Key deliverables include the installation of approximately 22,000 linear feet of perimeter dikes using stone, geotextile, and sand, the excavation and stockpiling of roughly 650,000 cubic yards of sand from a local borrow area, and the construction of spillway structures for controlled water release. The anticipated period of performance is 1,095 calendar days, though the awardee is explicitly prohibited from mobilizing before September 15, 2027, pending a formal Notice to Proceed. Bids must be submitted electronically via the Procurement Integrated Enterprise Environment portal in searchable PDF format. Evaluation is based on unit prices and totals, with a price evaluation preference provided for HUBZone small business concerns. The contract requires the submission of a Construction Quality Control Plan within 30 days of the notice to proceed and mandates adherence to EM 385-1-1 safety standards and specific environmental controls, including a prohibition on hay bales for slope stabilization. Awardees must provide performance and payment bonds and participate in formal partnering sessions within 35 to 45 days of award. Invoicing is processed through the USACE Finance Center via WAWF, requiring ENG Form 93 and prompt payment certification.
Other Heavy and Civil Engineering Construction

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS